{"id":13689,"date":"2013-08-02T17:24:49","date_gmt":"2013-08-02T14:24:49","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=13689"},"modified":"2013-08-02T17:29:13","modified_gmt":"2013-08-02T14:29:13","slug":"kendi-elektrigini-kendisi-uretiyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kendi-elektrigini-kendisi-uretiyor\/","title":{"rendered":"(Turkish) Kendi Elektri\u011fini Kendisi \u00dcretiyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/13689\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Gaziantep Su ve Kanalizasyon \u0130daresi (GASK\u0130) Ar\u0131tma Tesisi Sorumlusu Alper Uyan\u0131k, Gaziantep B\u00fcy\u00fck\u015fehir Belediyesi GASK\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc olarak \u015fehrin at\u0131k sular\u0131n\u0131n y\u00fczde 99 k\u0131sm\u0131n\u0131 ar\u0131tan bir tesise sahip olduklar\u0131n\u0131 s\u00f6yledi.<\/strong><\/p>\n<p>GASK\u0130 ar\u0131tma tesisinde yakla\u015f\u0131k 260 bin metre k\u00fcp su ar\u0131t\u0131l\u0131yor. Tesiste bir de ar\u0131tma \u00e7amurunun ortadan kald\u0131r\u0131lmas\u0131na y\u00f6nelik kurutma ve yakma tesisi bulunuyor. Tesis i\u00e7erisinde 4 tane \u00e7amur kurutma tank\u0131 ile g\u00fcnl\u00fck 15 bin metre k\u00fcp metan gaz\u0131n\u0131n elektri\u011fe \u00e7evrildi\u011fi ve y\u00fczde 55 civar\u0131nda tesisin kendi elektri\u011fini kar\u015f\u0131lad\u0131\u011f\u0131 \u00f6\u011frenildi.<\/p>\n<p>Gaziantep Su ve Kanalizasyon \u0130daresi (GASK\u0130) Ar\u0131tma Tesisleri Daire Ba\u015fkanl\u0131\u011f\u0131 At\u0131ksu Ar\u0131tma Tesisleri \u015eube M\u00fcd\u00fcrl\u00fc\u011f\u00fcnde tesis hakk\u0131nda bilgi veren GASK\u0130 Ar\u0131tma Tesisi Sorumlusu Uyan\u0131k, &#8220;Belediyemizin 3 at\u0131k su tesisi ile 6 tane paket su ar\u0131tma y\u00f6ntemi bulunmaktad\u0131r. Merkez at\u0131k su ar\u0131tma tesisimiz de yakla\u015f\u0131k 260 bin metre k\u00fcp suyu ar\u0131tmaktay\u0131z. Tesisimiz de 2 tane ileri biyolojik at\u0131k su ar\u0131tma tesisimiz bulunmaktad\u0131r. Bu tesisler de daha do\u011frusu \u00e7evre ile ilgili en \u00f6nemli problemlerden bir tanesi olan ar\u0131tma \u00e7amurlar\u0131 ile ilgili biz burada \u00e7ok ciddi bir yat\u0131r\u0131m yapt\u0131k.<\/p>\n<p>GASK\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc olarak ar\u0131tma \u00e7amurlar\u0131m\u0131z\u0131 ortadan kald\u0131r\u0131lmas\u0131na y\u00f6nelik T\u00fcrkiye&#8217;de ilk defa kurutma ve yakma tesisimizi devreye ald\u0131k. Di\u011fer tesislerimiz ile beraber g\u00fcnl\u00fck 180 ton ar\u0131tma \u00e7amurumuzu burada 15 ton k\u00fcl haline getiriyoruz. \u0130lk \u00f6nce bir \u00f6n ar\u0131tma i\u015flemi ger\u00e7ekle\u015ftiriyoruz. Kurutma i\u015flemi arkas\u0131ndan ak\u0131\u015fkan yatakl\u0131 kazan\u0131m\u0131zdan yakma i\u015flemi ger\u00e7ekle\u015ftirerek \u00e7amurumuzu k\u00fcl haline getiriyoruz. Y\u00fczde 99 kuruluk haline getiriyoruz.<\/p>\n<p><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/kendi-elektrigini-kendisi-uretiyor.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-13690\" title=\"kendi-elektrigini-kendisi-uretiyor\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/kendi-elektrigini-kendisi-uretiyor-300x181.jpg\" alt=\"\" width=\"300\" height=\"181\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/kendi-elektrigini-kendisi-uretiyor-300x181.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/kendi-elektrigini-kendisi-uretiyor-80x48.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/kendi-elektrigini-kendisi-uretiyor.jpg 480w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\u00c7amurda stabilizasyon sonucunda hacim azalmas\u0131 meydana getirdik. Bunun yan\u0131n da sistemin entegrasyonunda bize ciddi bir elektrik kazanc\u0131 oldu. Yapm\u0131\u015f oldu\u011fumuz ak\u0131\u015fkan kazanda ki y\u00fcksek \u0131s\u0131dan elde etti\u011fimiz enerjiyi \u00f6n ar\u0131tmada ve \u00f6n kurutma i\u015flemin de kullan\u0131yoruz. Fazla enerjiyi elektri\u011fe d\u00f6n\u00fc\u015ft\u00fcrme \u015fahs\u0131m\u0131z oldu. Yapt\u0131\u011f\u0131m\u0131z fizibilite \u00e7al\u0131\u015fmalar\u0131 ile 500 ile 800 kilowatt aras\u0131nda bir enerji elde edebilece\u011fimizi \u00f6n g\u00f6r\u00fcyoruz. Bunla ilgi \u00e7al\u0131\u015fmalar devam ediyor&#8221; dedi.<\/p>\n<p>Kendi elektriklerini tesis olarak kendilerinin kar\u015f\u0131lad\u0131\u011f\u0131n\u0131 ifade eden GASK\u0130 Ar\u0131tma Tesisi Sorumlusu Uyan\u0131k, &#8220;Tesisimize 2006 y\u0131l\u0131nda yapm\u0131\u015f oldu\u011fumuz \u00e7al\u0131\u015fmalar neticesinde ayl\u0131k 600 bin kilowatt \u00fczerinde elektrik ve \u00fcretimimiz de mevcut 4 tane \u00e7amur kurutma tank\u0131m\u0131zdan elde etti\u011fimiz biyogazlar ile yakla\u015f\u0131k g\u00fcnl\u00fck 15 bin metre k\u00fcp metan gaz\u0131n\u0131 elektri\u011fe \u00e7eviriyoruz. B\u00f6ylelikle tesisimizin elektrik enerjisinin y\u00fczde 55 civar\u0131nda k\u0131sm\u0131n\u0131 kendimiz kar\u015f\u0131lam\u0131\u015f oluyoruz. Zaten bu tip tesislerin en \u00f6nemli maliyeti elektrik maliyetidir. Bir \u00e7ok belediyemiz bu konuda s\u0131k\u0131nt\u0131 ya\u015f\u0131yorlar.<\/p>\n<p>Bizim \u00e7amur \u00e7\u00fcr\u00fctme tanklar\u0131m\u0131z\u0131n olmas\u0131 sistemimizin buna uygun olmas\u0131 korjinasyon kurmam\u0131za yard\u0131mc\u0131 oldu. Kurdu\u011fumuz korjinasyon \u00fcnitesi kendini 26 ayda kendine monta edebildi. Yat\u0131r\u0131m maliyetini amorti ettikten sonra bizi yakla\u015f\u0131k 200 bin lira civar\u0131nda ayl\u0131k bir kara ge\u00e7irmi\u015f durumdad\u0131r. Y\u00fczde 55 oran\u0131nda elektrik enerjisi bu tesisin korjinasyon \u00fcnitesinden kar\u015f\u0131l\u0131yoruz&#8221; \u015feklinde konu\u015ftu.<\/p>\n<p>Enerji verimlili\u011fi ile ilgili \u00e7al\u0131\u015fmalar\u0131n devam etti\u011fini vurgulayan GASK\u0130 Ar\u0131tma Tesisi Sorumlusu Uyan\u0131k, &#8220;Bu konuda yine T\u00fcrkiye&#8217;de pek uygulanmayan bir y\u00f6ntem ile \u00e7\u0131k\u0131t suyumuzdan ajimet vurgular vas\u0131tas\u0131yla ters suyu d\u00f6nd\u00fcrerek elektrik enerjisi ile ilgili bir HES projemiz var. Bu projemiz ile ilgili ihalelerimiz devam etmektedir. Yakla\u015f\u0131k y\u00fczde 5 ile 10 aras\u0131nda bir elektrik enerjisi kazanc\u0131 da \u00e7\u0131k\u0131t suyundaki elektrik enerjisinden kar\u015f\u0131lam\u0131\u015f olaca\u011f\u0131z&#8221; diye konu\u015ftu.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.energyworld.com.tr\/root.vol?title=kendi-elektrigini-kendisi-uretiyor&amp;exec=page&amp;nid=561691\" target=\"_blank\">Energy World<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Gaziantep Su ve Kanalizasyon \u0130daresi (GASK\u0130) Ar\u0131tma Tesisi Sorumlusu Alper Uyan\u0131k, Gaziantep B\u00fcy\u00fck\u015fehir Belediyesi GASK\u0130 Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc olarak \u015fehrin at\u0131k sular\u0131n\u0131n y\u00fczde 99 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":13690,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[7353,7352,63,67,165,6202,984],"views":673,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13689"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=13689"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13689\/revisions"}],"predecessor-version":[{"id":13692,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13689\/revisions\/13692"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/13690"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=13689"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=13689"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=13689"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}