{"id":136738,"date":"2021-06-14T13:48:27","date_gmt":"2021-06-14T10:48:27","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=136738"},"modified":"2021-06-14T13:48:27","modified_gmt":"2021-06-14T10:48:27","slug":"firat-edas-yatirimlari-ile-koye-donuse-enerji-oluyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/firat-edas-yatirimlari-ile-koye-donuse-enerji-oluyor\/","title":{"rendered":"(Turkish) &#8217;FIRAT EDA\u015e&#8217; Yat\u0131r\u0131mlar\u0131 \u0130le K\u00f6ye D\u00f6n\u00fc\u015fe Enerji Oluyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/136738\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>F\u0131rat Elektrik Da\u011f\u0131t\u0131m A.\u015e. (F\u0131rat EDA\u015e), Tunceli\u2019de k\u00f6y ve k\u0131rsal alanlar i\u00e7in planlad\u0131\u011f\u0131 6 milyon 246 bin TL tutar\u0131nda ger\u00e7ekle\u015ftirece\u011fi yat\u0131r\u0131mlar ile k\u00f6ye d\u00f6n\u00fc\u015f\u00fcn enerjisi olmaya haz\u0131rlan\u0131yor.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignright wp-image-136740\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/firat-edas-yatirimlari-ile-koye-donuse-enerji-oluyor-1.jpg\" alt=\"\" width=\"320\" height=\"307\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/firat-edas-yatirimlari-ile-koye-donuse-enerji-oluyor-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/firat-edas-yatirimlari-ile-koye-donuse-enerji-oluyor-1-300x288.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/firat-edas-yatirimlari-ile-koye-donuse-enerji-oluyor-1-417x400.jpg 417w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/firat-edas-yatirimlari-ile-koye-donuse-enerji-oluyor-1-52x50.jpg 52w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/firat-edas-yatirimlari-ile-koye-donuse-enerji-oluyor-1-500x480.jpg 500w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Kaliteli ve kesintisiz enerji arz\u0131n\u0131<strong> Bing\u00f6l, Elaz\u0131\u011f, Malatya<\/strong> ve <strong>Tunceli<\/strong> illerinde m\u00fc\u015fterilerine en iyi \u015fekilde verme gayretiyle \u00e7al\u0131\u015fmalar\u0131n\u0131 aral\u0131ks\u0131z s\u00fcrd\u00fcren<strong> F\u0131rat EDA\u015e<\/strong>, k\u00f6y ve k\u0131rsal b\u00f6lgelerinin enerji kalitesini art\u0131rmak i\u00e7in kollar\u0131 s\u0131vad\u0131.<\/p>\n<p>K\u00f6ye d\u00f6n\u00fc\u015f kapsam\u0131nda olas\u0131 artabilecek enerji ihtiyac\u0131n\u0131 kar\u015f\u0131lamak ve merkezden k\u0131rsala <strong>elektrik da\u011f\u0131t\u0131m hizmet kalitesinde<\/strong> b\u00fct\u00fcnl\u00fck sa\u011flamak amac\u0131yla F\u0131rat EDA\u015e,<strong> 6 milyon 246 bin TL<\/strong>\u2019lik yat\u0131r\u0131m ile Tunceli\u2019de <strong>Enerji Nakil Hatt\u0131 (ENH)<\/strong> ve <strong>Al\u00e7ak Gerilim (AG)<\/strong> olmak \u00fczere toplam <strong>563 direk<\/strong> \u00fczerinde<strong> 30 km<\/strong> uzunlu\u011fundaki hatt\u0131n tesis \u00e7al\u0131\u015fmalar\u0131na ba\u015fl\u0131yor.<\/p>\n<h2><strong>\u00d6MER KANDEM\u0130R: \u201cK\u00d6Y VE KIRSAL HAYATINI KOLAYLA\u015eTIRACAK\u201d<\/strong><\/h2>\n<p>B\u00f6lgenin geli\u015fimine katk\u0131 sa\u011flayacak yat\u0131r\u0131m \u00e7al\u0131\u015fmas\u0131 hakk\u0131nda a\u00e7\u0131klamalarda bulunan F\u0131rat EDA\u015e Da\u011f\u0131t\u0131m Operasyonlar\u0131 Genel M\u00fcd\u00fcr\u00fc <strong>\u00d6mer Kandemir<\/strong>; <strong>30 km<\/strong> uzunlu\u011funda tesis edilecek projenin 18 km\u2019lik k\u0131sm\u0131n\u0131 ENH, <strong>12 km<\/strong>\u2019lik k\u0131sm\u0131n\u0131 ise AG hatt\u0131n olu\u015fturaca\u011f\u0131n\u0131 ifade ederek, <span style=\"text-decoration: underline;\">\u015funlar\u0131 kaydetti:<\/span> <em>\u201c<strong>6 milyon 246 bin TL<\/strong> b\u00fcy\u00fckl\u00fc\u011f\u00fcndeki yat\u0131r\u0131m dahilinde AG i\u00e7in <strong>2 milyon 990 bin TL<\/strong>\u2019lik bir harcama yap\u0131l\u0131rken, ENH i\u00e7in <strong>3 milyon 255 bin TL<\/strong> b\u00fcy\u00fckl\u00fc\u011f\u00fcnde \u00f6nemli bir harcama yap\u0131lacak.\u201d<\/em> Yat\u0131r\u0131m \u00e7al\u0131\u015fmas\u0131n\u0131n tamamlanmas\u0131 halinde sadece b\u00f6lgenin enerji arz\u0131 kalitesini art\u0131rmakla kalmayaca\u011f\u0131n\u0131 hat\u0131rlatan Da\u011f\u0131t\u0131m Operasyonlar\u0131 Genel M\u00fcd\u00fcr\u00fc<strong> \u00d6mer Kandemir<\/strong>, dolayl\u0131 olarak <strong>k\u00f6y<\/strong> ve <strong>k\u0131rsal ya\u015fam\u0131<\/strong> da kolayla\u015ft\u0131raca\u011f\u0131n\u0131 s\u00f6zlerine ekledi.<\/p>\n<p>Yap\u0131lacak yat\u0131r\u0131m\u0131n \u00f6nemli bir par\u00e7as\u0131n\u0131 olu\u015fturan Hozat il\u00e7esinde <strong>F\u0131rat EDA\u015e<\/strong>; proje kapsam\u0131nda Kara\u00e7avu\u015f K\u00f6y\u00fc\u2019ne ba\u011fl\u0131 <strong>Karsen Mezras\u0131, Kalecik K\u00f6y\u00fc\u2019ne<\/strong> ba\u011fl\u0131 <strong>Karata\u015f Mezras\u0131<\/strong> ve<strong> Sar\u0131salt\u0131k K\u00f6y\u00fc<\/strong>\u2019ne ba\u011fl\u0131<strong> Ak\u00f6ren Mezras\u0131<\/strong> i\u00e7in <strong>ENH<\/strong> ve<strong> AG<\/strong> toplam\u0131nda <strong>3 milyon 61 bin TL<\/strong> tutar\u0131ndaki yat\u0131r\u0131m ile <strong>16,3 km uzunlu\u011fundaki<\/strong> hatt\u0131n tesisini ger\u00e7ekle\u015ftirecek. \u00d6zellikle k\u0131\u015f aylar\u0131nda mevsimsel zorluklar\u0131 ve engebeli co\u011frafyas\u0131 ile dikkat \u00e7eken Ovac\u0131k il\u00e7esinde ise <strong>\u00c7ay\u00fcst\u00fc K\u00f6y\u00fc\u2019<\/strong>nde <strong>ENH<\/strong> ve <strong>AG<\/strong> toplam\u0131nda yakla\u015f\u0131k<strong> 737 bin 355 TL<\/strong> tutar\u0131nda yap\u0131lacak harcama ile<strong> 3,5 km uzunlu\u011funda<\/strong> hat tesis edilecek.\u00a0<strong>AG<\/strong> ve <strong>ENH<\/strong> toplam\u0131nda\u00a0<strong>6,7 km<\/strong> uzunlu\u011fa sahip<strong>\u00a01 milyon 653 bin 618 TL\u2019lik<\/strong> harcama ile Merkeze ba\u011fl\u0131 <strong>\u00c7\u0131ral\u0131 K\u00f6y\u00fc<\/strong>\u2019n\u00fcn <strong>Bor Mezras\u0131<\/strong> i\u00e7in yeni hat tesis edilecek.\u00a0Naz\u0131miye il\u00e7esi \u00f6zelinde B\u00fcy\u00fckyurt K\u00f6y\u00fc\u2019ne ba\u011fl\u0131 Yakac\u0131k Mezras\u0131 i\u00e7in ENH ve AG toplam\u0131nda da yakla\u015f\u0131k <strong>794 bin TL<\/strong>\u2019lik harcama ile<strong> 3,75 km uzunlu\u011funda<\/strong> hatt\u0131n tesisi de ger\u00e7ekle\u015ftirilecek.<\/p>\n<p><strong>37 bin 365 kilometrekare<\/strong> alana sahip da\u011f\u0131t\u0131m b\u00f6lgesinde <strong>1 milyondan fazla<\/strong> m\u00fc\u015fterisine elektrik da\u011f\u0131t\u0131m hizmeti veren F\u0131rat EDA\u015e, <strong>kaliteli<\/strong> ve <strong>kesintisiz enerji arz\u0131<\/strong> noktas\u0131nda b\u00f6lgenin geli\u015fimine katk\u0131 sa\u011flayacak yat\u0131r\u0131mlar\u0131n artarak devam edece\u011fine i\u015faret etti.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.F\u0131rat Elektrik Da\u011f\u0131t\u0131m A.\u015e. (F\u0131rat EDA\u015e), Tunceli\u2019de k\u00f6y ve k\u0131rsal alanlar i\u00e7in planlad\u0131\u011f\u0131 6 milyon 246 bin TL tutar\u0131nda ger\u00e7ekle\u015ftirece\u011fi yat\u0131r\u0131mlar ile k\u00f6ye [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":136741,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[53114,52259,88162,90003,91949],"views":115,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/136738"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=136738"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/136738\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/136741"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=136738"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=136738"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=136738"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}