{"id":136655,"date":"2021-06-13T15:27:08","date_gmt":"2021-06-13T12:27:08","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=136655"},"modified":"2021-06-13T15:28:08","modified_gmt":"2021-06-13T12:28:08","slug":"ittifak-holding-ten-ilk-3-ayda-59-milyon-lira-net-zarar-edildigi-aciklandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ittifak-holding-ten-ilk-3-ayda-59-milyon-lira-net-zarar-edildigi-aciklandi\/","title":{"rendered":"(Turkish) &#8217;\u0130ttifak Holding&#8217; \u0130lk 3 Ayda 5,9 Milyon Lira Net Zarar Etti\u011fini A\u00e7\u0131klad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/136655\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>\u0130ttifak Holding taraf\u0131ndan 2021 y\u0131l\u0131n\u0131n ilk \u00e7eyre\u011finde 5,9 milyon lira net zarar edildi\u011fi <img loading=\"lazy\" class=\"alignright wp-image-136657\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/ittifak-holding-ten-ilk-3-ayda-59-milyon-lira-net-zarar-edildigi-aciklandi.jpg\" alt=\"\" width=\"320\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/ittifak-holding-ten-ilk-3-ayda-59-milyon-lira-net-zarar-edildigi-aciklandi.jpg 1200w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/ittifak-holding-ten-ilk-3-ayda-59-milyon-lira-net-zarar-edildigi-aciklandi-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/ittifak-holding-ten-ilk-3-ayda-59-milyon-lira-net-zarar-edildigi-aciklandi-768x432.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/ittifak-holding-ten-ilk-3-ayda-59-milyon-lira-net-zarar-edildigi-aciklandi-1024x576.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/ittifak-holding-ten-ilk-3-ayda-59-milyon-lira-net-zarar-edildigi-aciklandi-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/ittifak-holding-ten-ilk-3-ayda-59-milyon-lira-net-zarar-edildigi-aciklandi-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>a\u00e7\u0131kland\u0131.<\/h1>\n<p><strong>\u0130ttifak Holding A.\u015e.<\/strong>, 2021 y\u0131l\u0131n\u0131n <strong>ilk 3 ayl\u0131k d\u00f6nemine<\/strong> ili\u015fkin finansal raporunda, net <strong>5.925.000 lira zarar<\/strong> etti\u011fini bildirdi. \u015eirket ge\u00e7ti\u011fimiz y\u0131l\u0131n ayn\u0131 d\u00f6neminde <strong>8.021.000 lira net kar<\/strong> elde etmi\u015fti.<\/p>\n<p>Kurulu\u015fun\u00a0<strong>d\u00f6nem has\u0131lat\u0131<\/strong> ge\u00e7ti\u011fimiz y\u0131l\u0131n ayn\u0131 d\u00f6nemindeki d\u00fczeyin <strong>410.000 lira alt\u0131nda<\/strong> olurken <strong>186.223.000 lira<\/strong> olarak ger\u00e7ekle\u015fti. <strong>Sat\u0131\u015flar\u0131n maliyeti<\/strong> ise yakla\u015f\u0131k <strong>% 11<\/strong> artarak <strong>151.252.000 lira<\/strong> oldu. <strong>Finansman giderleri<\/strong> ise ge\u00e7ti\u011fimiz y\u0131l\u0131n ayn\u0131 d\u00f6nemine g\u00f6re<strong> % 551<\/strong> oran\u0131nda artt\u0131 ve <strong>40.796.000 lira<\/strong> d\u00fczeyine y\u00fckseldi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u0130ttifak Holding taraf\u0131ndan 2021 y\u0131l\u0131n\u0131n ilk \u00e7eyre\u011finde 5,9 milyon lira net zarar edildi\u011fi a\u00e7\u0131kland\u0131. \u0130ttifak Holding A.\u015e., 2021 y\u0131l\u0131n\u0131n ilk 3 ayl\u0131k [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":136657,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[53114,52259,50584,91883,24420,50585],"views":82,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/136655"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=136655"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/136655\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/136657"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=136655"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=136655"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=136655"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}