{"id":136607,"date":"2021-06-12T15:07:11","date_gmt":"2021-06-12T12:07:11","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=136607"},"modified":"2021-06-12T15:07:11","modified_gmt":"2021-06-12T12:07:11","slug":"aydem-yenilenebilir-enerji-mevcut-heslerin-bir-kismina-ges-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aydem-yenilenebilir-enerji-mevcut-heslerin-bir-kismina-ges-kuracak\/","title":{"rendered":"(Turkish) &#8217;Aydem Yenilenebilir Enerji&#8217; Mevcut HES\u2019lerin Bir K\u0131sm\u0131na GES Kuracak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/136607\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Aydem Yenilenebilir Enerji A.\u015e. Kamuyu Ayd\u0131nlatma Platformu (KAP) a\u00e7\u0131klamas\u0131nda; yap\u0131lmas\u0131 planlanan hibrit santral yat\u0131r\u0131mlar\u0131n\u0131n ilk faz\u0131nda, toplam 236 MWp g\u00fcc\u00fcnde 4 adet g\u00fcne\u015f enerji santrali kurulaca\u011f\u0131n\u0131 duyurdu. Hibrit santrale d\u00f6n\u00fc\u015fecek HES\u2019ler Tokat, Sivas, U\u015fak ve Adana illerinde bulunuyor.<\/strong><\/p>\n<p>\u0130zahname\u2019de belirtilen <strong>300 MW<\/strong> hibrit kapasite yat\u0131r\u0131m plan\u0131 <strong>ilgili mevzuat de\u011fi\u015fiklikleri<\/strong> kapsam\u0131nda hibrit yat\u0131r\u0131m\u0131 i\u00e7in santral sahalar\u0131n\u0131n geni\u015fletilmesi imkan\u0131 ile yakla\u015f\u0131k<strong> 600 MW<\/strong>\u2019a <img loading=\"lazy\" class=\"alignright wp-image-136610\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/aydem-yenilenebilir-enerji-mevcut-heslerin-bir-kismina-ges-kuracak.jpg\" alt=\"\" width=\"320\" height=\"204\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/aydem-yenilenebilir-enerji-mevcut-heslerin-bir-kismina-ges-kuracak.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/aydem-yenilenebilir-enerji-mevcut-heslerin-bir-kismina-ges-kuracak-300x191.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/aydem-yenilenebilir-enerji-mevcut-heslerin-bir-kismina-ges-kuracak-500x319.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/aydem-yenilenebilir-enerji-mevcut-heslerin-bir-kismina-ges-kuracak-78x50.jpg 78w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>y\u00fckselen kapasite kapsam\u0131nda; <em>Ak\u0131nc\u0131 HES Yard\u0131mc\u0131 Kaynak G\u00fcne\u015f Enerjisi Santrali, Koyulhisar HES Yard\u0131mc\u0131 Kaynak G\u00fcne\u015f Enerjisi Santrali, U\u015fak RES Yard\u0131mc\u0131 Kaynak G\u00fcne\u015f Enerjisi Santrali ve Menta\u015f HES Yard\u0131mc\u0131 Kaynak G\u00fcne\u015f Enerjisi Santrali projeleri<\/em>nin yap\u0131lmas\u0131 planlan\u0131yor. \u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131 <strong>e-\u00c7ED sistemine<\/strong> y\u00fcklenerek ba\u015flat\u0131lan Santrallerin <strong>\u00c7ED s\u00fcre\u00e7lerinin<\/strong> k\u0131sa s\u00fcre i\u00e7erisinde sonu\u00e7lanmas\u0131 bekleniyor.<\/p>\n<p>A\u00e7\u0131klamada, tek bir \u00fcretim tesisinde birden fazla kaynaktan <strong>elektrik enerjisi \u00fcretilebilmesine<\/strong> imkan sa\u011flayan<strong> hibrit santrallerin<\/strong>, <strong>\u00fcretim tesislerinin daha verimli kullan\u0131lmas\u0131<\/strong>na, <strong>elektrik \u00fcretim kapasiteleri<\/strong> i\u00e7erisinde daha fazla elektrik \u00fcretilmesine imk\u00e2n verece\u011fi belirtildi. Hibrit santrallerde ya\u011f\u0131\u015f az oldu\u011funda <strong>GES<\/strong>\u2019ten; g\u00fcne\u015f az oldu\u011funda ise <strong>HES<\/strong>\u2019ten \u00fcretim ger\u00e7ekle\u015ftirilerek <strong>mevsim ko\u015fullar\u0131n\u0131n etkisi asgari seviyeye<\/strong> indirilebilecek. <strong>Hibrit santral yat\u0131r\u0131mlar\u0131n\u0131n<\/strong> \u00f6ne \u00e7\u0131kan avantajlar\u0131 aras\u0131nda ise yat\u0131r\u0131m ve operasyonel maliyetlerinin daha d\u00fc\u015f\u00fck olmas\u0131, yard\u0131mc\u0131 kaynaklardan <strong>\u00fcretilen elektrik enerjisinin<\/strong> ana kayna\u011f\u0131n\u0131n <strong>YEKDEM<\/strong> kapsam\u0131nda olmas\u0131 durumunda, <strong>YEKDEM kapsam\u0131nda<\/strong> de\u011ferlendirilmesi g\u00f6sterildi.<\/p>\n<p><strong>KAP A\u00e7\u0131klamas\u0131na Ula\u015fmak \u0130\u00e7in\u00a0<a href=\"https:\/\/www.kap.org.tr\/tr\/Bildirim\/940036\" target=\"_blank\" rel=\"nofollow noopener\">T\u0131klay\u0131n&gt;&gt;&gt;<\/a><\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Aydem Yenilenebilir Enerji A.\u015e. Kamuyu Ayd\u0131nlatma Platformu (KAP) a\u00e7\u0131klamas\u0131nda; yap\u0131lmas\u0131 planlanan hibrit santral yat\u0131r\u0131mlar\u0131n\u0131n ilk faz\u0131nda, toplam 236 MWp g\u00fcc\u00fcnde 4 adet g\u00fcne\u015f [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":136610,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49,47],"tags":[3272,52259,53157,91857,68968,73896,2437,9468,7229],"views":813,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/136607"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=136607"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/136607\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/136610"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=136607"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=136607"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=136607"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}