{"id":13657,"date":"2013-08-01T17:32:32","date_gmt":"2013-08-01T14:32:32","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=13657"},"modified":"2013-08-01T17:32:32","modified_gmt":"2013-08-01T14:32:32","slug":"limak-hamitabat-gaz-santralini-sifirdan-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/limak-hamitabat-gaz-santralini-sifirdan-kuracak\/","title":{"rendered":"(Turkish) Limak, Hamitabat Gaz Santrali`ni S\u0131f\u0131rdan Kuracak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/13657\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Limak Grubu, \u00f6zelle\u015ftirmeden ald\u0131\u011f\u0131 Hamitabat Do\u011falgaz \u00c7evrim Santrali`ni s\u0131f\u0131rdan yeniden kuracak. 1.5-2 y\u0131l s\u00fcrecek kurulu\u015f s\u00fcrecinde, eski tesis elektrik \u00fcretmeye devam edecek.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/limak-hamitabat-gaz-santralini-sifirdan-kuracak.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-13658\" title=\"limak-hamitabat-gaz-santralini-sifirdan-kuracak\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/limak-hamitabat-gaz-santralini-sifirdan-kuracak-300x193.jpg\" alt=\"\" width=\"300\" height=\"193\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/limak-hamitabat-gaz-santralini-sifirdan-kuracak-300x193.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/limak-hamitabat-gaz-santralini-sifirdan-kuracak-500x322.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/limak-hamitabat-gaz-santralini-sifirdan-kuracak-77x50.jpg 77w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/08\/limak-hamitabat-gaz-santralini-sifirdan-kuracak.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p>Enerji \u00fcretim \u00f6zelle\u015ftirmeleri aras\u0131nda ihalesi tamamlanan projelerden biri olan Hamitabat Do\u011falgaz \u00c7evrim Santrali, ihalede en y\u00fcksek teklifi veren Limak Holding`e bug\u00fcn devrediliyor.<\/p>\n<p>Limak Grubu, Hamitabat Santrali`nin bulundu\u011fu sahada, s\u0131f\u0131rdan yeni bir santral kuracak. Ancak yeni \u00fcniteler devreye al\u0131nana kadar eski tesis elektrik \u00fcretimine devam edecek.<\/p>\n<p>Hamitabat Santrali`nin bulundu\u011fu sahada, yeni tesislerin kurulmas\u0131na yetecek kadar alan bulundu\u011fu belirtiliyor. Bu sahaya son teknoloji bir \u00e7evrim santrali kurulacak.<\/p>\n<p>Limak Holding Y\u00f6netim Kurulu Ba\u015fkan\u0131 Nihat \u00d6zdemir, Hamitabat`taki yeni tesisin kurulup devreye al\u0131nmas\u0131n\u0131n yakla\u015f\u0131k 1.5-2 y\u0131l s\u00fcrebilece\u011fini s\u00f6yledi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/limak-hamitabat-gaz-santralini-sifirdan-kuracak_4433.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Limak Grubu, \u00f6zelle\u015ftirmeden ald\u0131\u011f\u0131 Hamitabat Do\u011falgaz \u00c7evrim Santrali`ni s\u0131f\u0131rdan yeniden kuracak. 1.5-2 y\u0131l s\u00fcrecek kurulu\u015f s\u00fcrecinde, eski tesis elektrik \u00fcretmeye devam edecek. Enerji [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":13658,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[19,63,67,165,7323,858,4797,7324],"views":978,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13657"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=13657"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13657\/revisions"}],"predecessor-version":[{"id":13660,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13657\/revisions\/13660"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/13658"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=13657"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=13657"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=13657"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}