{"id":13655,"date":"2013-08-01T17:25:11","date_gmt":"2013-08-01T14:25:11","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=13655"},"modified":"2013-08-01T17:25:11","modified_gmt":"2013-08-01T14:25:11","slug":"enerjisa-ayedas-icin-490-8-milyon-dolar-odedi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/enerjisa-ayedas-icin-490-8-milyon-dolar-odedi\/","title":{"rendered":"(Turkish) Enerjisa, AYEDA\u015e \u0130\u00e7in 490.8 Milyon Dolar \u00d6dedi&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/13655\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u0130stanbul Anadolu Yakas\u0131 Elektrik Da\u011f\u0131t\u0131m A\u015e`yi ( AYEDA\u015e ) \u00d6zelle\u015ftirme \u0130daresi`nin a\u00e7t\u0131\u011f\u0131 ihaleyi kazanarak devralan Enerjisa, 1 milyar 227 <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/enerjisa-ortaklik-sureci-E.ON_.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-10141\" title=\"enerjisa-ayedas-icin-4908-milyon-dolar-odedi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/enerjisa-ortaklik-sureci-E.ON_-300x196.jpg\" alt=\"\" width=\"300\" height=\"196\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/enerjisa-ortaklik-sureci-E.ON_-300x196.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/enerjisa-ortaklik-sureci-E.ON_-76x50.jpg 76w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/enerjisa-ortaklik-sureci-E.ON_.jpg 433w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>milyon dolarl\u0131k bedelin y\u00fczde 40`l\u0131k k\u0131sm\u0131n\u0131 \u00f6dedi.<\/strong><\/p>\n<p>Sabanc\u0131 Holding`ten yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, Alman E.ON ile Sabanc\u0131 Holding`in y\u00fczde 50`\u015fer payla ortak oldu\u011fu enerji \u015firketi Enerjisa, \u00f6zelle\u015ftirme ihalesinde en y\u00fcksek teklifi vererek devralmaya hak kazand\u0131\u011f\u0131 AYEDA\u015e i\u00e7in ilk \u00f6demeyi yapt\u0131.<\/p>\n<p>AYEDA\u015e`\u0131n \u00f6deme program\u0131 \u00e7er\u00e7evesinde 1 milyar 227 milyon dolarl\u0131k sat\u0131n alma bedelinin y\u00fczde 40`\u0131 olan 490 milyon 800 bin dolarl\u0131k k\u0131s\u0131m pe\u015fin olarak \u00f6dendi. Geri kalan tutar\u0131n da 3 y\u0131lda 3 e\u015fit taksitle \u00f6denece\u011fi bildirildi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/enerjisa-ayedas-icin-4908-milyon-dolar-odedi_4427.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>\n<p><!-- Di\u011fer Fotolar --><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u0130stanbul Anadolu Yakas\u0131 Elektrik Da\u011f\u0131t\u0131m A\u015e`yi ( AYEDA\u015e ) \u00d6zelle\u015ftirme \u0130daresi`nin a\u00e7t\u0131\u011f\u0131 ihaleyi kazanarak devralan Enerjisa, 1 milyar 227 milyon dolarl\u0131k bedelin y\u00fczde [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":10141,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[2320,7322,63,67,165,422,3554,1248],"views":927,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13655"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=13655"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13655\/revisions"}],"predecessor-version":[{"id":13656,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13655\/revisions\/13656"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/10141"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=13655"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=13655"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=13655"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}