{"id":135935,"date":"2021-06-01T13:52:36","date_gmt":"2021-06-01T10:52:36","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=135935"},"modified":"2021-06-01T13:52:36","modified_gmt":"2021-06-01T10:52:36","slug":"akkuyu-ngs-nin-1inci-reaktor-basinc-kabinin-kurulumu-tamamlandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngs-nin-1inci-reaktor-basinc-kabinin-kurulumu-tamamlandi\/","title":{"rendered":"(Turkish) Akkuyu NGS&#8217;nin 1&#8217;inci Reakt\u00f6r Bas\u0131n\u00e7 Kab\u0131n\u0131n Kurulumu Tamamland\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/135935\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Akkuyu NGS in\u015faat sahas\u0131nda, ana ekipman\u0131n montaj\u0131yla ilgili ana a\u015famalardan biri olan 1\u2019inci g\u00fc\u00e7 \u00fcnitesine ait reakt\u00f6r bas\u0131n\u00e7 kab\u0131n\u0131n kurulumu tamamland\u0131.<\/h1>\n<p>1\u2019inci g\u00fc\u00e7 \u00fcnitesinde daha \u00f6nce de kor tutucunun montaj\u0131 tamamlanm\u0131\u015f, destekleyici ve ta\u015f\u0131y\u0131c\u0131 kiri\u015flere beton d\u00f6kme i\u015flemi yap\u0131lm\u0131\u015f ve reakt\u00f6r kab\u0131n\u0131n silindirik k\u0131sm\u0131n\u0131n kuru z\u0131rhlama ve \u0131s\u0131 yal\u0131t\u0131m\u0131 i\u015fleri bitirilmi\u015fti. Reakt\u00f6r kab\u0131n\u0131n kurulumunun tamamlanmas\u0131ndan hemen \u00f6nce ise, <strong>kab\u0131n ana a\u011f\u0131rl\u0131k <img loading=\"lazy\" class=\"alignright wp-image-135937\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/akkuyu-ngs-nin-1inci-reaktor-basinc-kabinin-kurulumu-tamamlandi-1.jpg\" alt=\"\" width=\"320\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/akkuyu-ngs-nin-1inci-reaktor-basinc-kabinin-kurulumu-tamamlandi-1.jpg 512w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/akkuyu-ngs-nin-1inci-reaktor-basinc-kabinin-kurulumu-tamamlandi-1-300x188.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/akkuyu-ngs-nin-1inci-reaktor-basinc-kabinin-kurulumu-tamamlandi-1-500x313.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/06\/akkuyu-ngs-nin-1inci-reaktor-basinc-kabinin-kurulumu-tamamlandi-1-80x50.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>y\u00fck\u00fcn\u00fc ta\u015f\u0131yan<\/strong> bir <strong>destekleyici halka monte<\/strong> edildi.<\/p>\n<p>Bu montaj i\u015flemi, reakt\u00f6r kab\u0131n\u0131 1\u2019inci g\u00fc\u00e7 \u00fcnitesinin yar\u0131\u00e7ap\u0131 i\u00e7ine ta\u015f\u0131mak i\u00e7in saha yollar\u0131n\u0131n \u00f6zel bir \u015fekilde haz\u0131rlanmas\u0131n\u0131 gerektirdi. G\u00fczergah boyunca uzanan yollarda bu ama\u00e7la dolgu ve d\u00fczleme i\u015flemleri ger\u00e7ekle\u015ftirildi. Reakt\u00f6r kab\u0131n\u0131 ta\u015f\u0131yan \u00f6zel tekerlekli platform, bu i\u015flemlerin ard\u0131ndan ge\u00e7ici depolama alan\u0131ndan 1\u2019inci g\u00fc\u00e7 \u00fcnitesinin in\u015faat alan\u0131na kadar olan yolu sorunsuz bir \u015fekilde ge\u00e7ti.<\/p>\n<p><strong>330 tonluk<\/strong> bir a\u011f\u0131rl\u0131\u011fa,<strong> 4.5 metrelik<\/strong> \u00e7apa ve <strong>12 metrelik y\u00fcksekli\u011fe<\/strong> sahip olan reakt\u00f6r kab\u0131, bu yolun a\u015f\u0131lmas\u0131n\u0131n ard\u0131ndan 3 bin tona kadar kald\u0131rma kapasitesine sahip <strong>Liebherr LR 13000<\/strong> tipi <strong>mobil paletli vin\u00e7 kullan\u0131larak<\/strong> yatay konumdan <strong>dikey konuma<\/strong> getirildi. Ekipman dikey konuma getirildikten sonra reakt\u00f6r b\u00f6lmesinin \u00fczerine kald\u0131r\u0131larak reakt\u00f6r \u015faft\u0131ndaki yerine yerle\u015ftirildi.<\/p>\n<p>Konuyla ilgili a\u00e7\u0131klama yapan <strong>AKKUYU N\u00dcKLEER A.\u015e.<\/strong> Genel M\u00fcd\u00fcr Birinci Yard\u0131mc\u0131s\u0131 ve NGS Yap\u0131 \u0130\u015fleri Direkt\u00f6r\u00fc Sergei Butckikh, \u201c<em>1&#8217;inci g\u00fc\u00e7 \u00fcnitesinin <strong>reakt\u00f6r kab\u0131n\u0131n montaj\u0131<\/strong>, bu y\u0131l sahada ger\u00e7ekle\u015fen \u00e7al\u0131\u015fmalar\u0131n en \u00f6nemlilerinden biri. \u00dczerinde reakt\u00f6r kab\u0131 kurulumu yap\u0131lan destekleyici halkan\u0131n montaj\u0131 21 Nisan\u2019da yap\u0131lm\u0131\u015ft\u0131. Bu, kab\u0131 sabitlemek ve y\u00fcklere maruz kald\u0131\u011f\u0131nda yatay ve dikey hareketlerini \u00f6nlemek i\u00e7in tasarlanan reakt\u00f6r tesisi konstr\u00fcksiyonunun bir eleman\u0131d\u0131r. Reakt\u00f6r kab\u0131, art\u0131k tasarlanan konumuna getirildi. Montaj ekibinin ve kald\u0131rma ekipman\u0131 operat\u00f6rlerinin kusursuz \u00e7al\u0131\u015fmas\u0131na dikkat \u00e7ekmek istiyorum. Kab\u0131n montaj\u0131 adeta bir cerrah hassasiyeti gerektirir, \u00e7\u00fcnk\u00fc izin verilen azami yatay sapma milimetrenin onda birini ge\u00e7mez. Reakt\u00f6r kab\u0131n\u0131n kurulumunun tamamlanmas\u0131, <strong>reakt\u00f6r \u015faft\u0131n\u0131n yap\u0131m\u0131yla<\/strong> ilgili i\u015flere devam etmemize imkan sunacak\u201d<\/em> ifadelerini kulland\u0131.<\/p>\n<p>Montaj i\u015fleminin yap\u0131lmas\u0131na ili\u015fkin s\u00fcre\u00e7, <strong>N\u00fckleer D\u00fczenleme Kurumu<\/strong>\u2019nun yan\u0131 s\u0131ra (NDK), <strong>ba\u011f\u0131ms\u0131z bir yap\u0131 denetim kurulu\u015fu<\/strong> olan Frans\u0131z m\u00fchendislik grubu<strong> Assystem, Akkuyu NGS\u2019deki<\/strong> reakt\u00f6r tesisinin tasar\u0131mc\u0131s\u0131 olan <strong>OKB \u201cGidropress\u201d<\/strong> ve <strong>reakt\u00f6r bas\u0131n\u00e7 kab\u0131n\u0131n \u00fcreticisi<\/strong> olan <strong>AEM-Technology<\/strong> \u015firketinin temsilcileri taraf\u0131ndan denetlendi.<\/p>\n<p><strong>Reakt\u00f6r kab\u0131n\u0131n montaj\u0131<\/strong>, reakt\u00f6r binas\u0131n\u0131n silindirik k\u0131sm\u0131n\u0131n a\u00e7\u0131k \u00fcst k\u0131sm\u0131ndan kurulum yap\u0131lmas\u0131n\u0131 \u00f6ng\u00f6ren Open Top teknolojisi kullan\u0131larak ger\u00e7ekle\u015ftirildi. <strong>VVER-1200 reakt\u00f6rl\u00fc Leningrad NGS-2\u2019nin g\u00fc\u00e7 \u00fcniteleri<\/strong>nin in\u015fas\u0131 da dahil olmak \u00fczere <strong>\u00c7in, Japonya, Bulgaristan<\/strong> ve <strong>Rusya\u2019daki<\/strong> n\u00fckleer santrallerin yap\u0131m\u0131na ili\u015fkin bir\u00e7ok <strong>projede kendini ba\u015far\u0131yla kan\u0131tlam\u0131\u015f<\/strong> olan bu <strong>teknoloji, in\u015faat<\/strong> ve <strong>montaj i\u015flemlerini<\/strong> ayn\u0131 anda en uygun \u015fekilde <strong>yapma<\/strong> ve <strong>zeminlere beton d\u00f6kme i\u015flemi<\/strong> tamamlanmadan <strong>ekipman<\/strong> ve<strong> boru hatlar\u0131n\u0131n montaj\u0131na<\/strong> ba\u015flama imkan\u0131 sunuyor. <strong>Akkuyu NGS<\/strong> g\u00fc\u00e7 \u00fcnitelerinde<strong> buhar jenerat\u00f6rleri<\/strong>nin, <strong>bas\u0131n\u00e7 kompansat\u00f6rlerinin<\/strong>, <strong>ana sirk\u00fclasyon pompalar\u0131n\u0131n<\/strong> ve reakt\u00f6r binalar\u0131ndaki di\u011fer <strong>ana teknolojik ekipman\u0131n montaj\u0131n\u0131n<\/strong> da, <strong>Open Top teknolojisi<\/strong> kullan\u0131larak yap\u0131lmas\u0131 planlan\u0131yor.<\/p>\n<p>Akkuyu NGS sahas\u0131 \u00e7al\u0131\u015fanlar\u0131, reakt\u00f6r kab\u0131n\u0131n montaj\u0131ndan sonra reakt\u00f6r \u015faft\u0131na beton d\u00f6kmeye devam edecek. \u00c7al\u0131\u015fanlar ayr\u0131ca, ana sirk\u00fclasyon <strong>boru hatt\u0131n\u0131n bile\u015fenleri<\/strong> ve <strong>buhar jenerat\u00f6rleri<\/strong> i\u00e7in destekleri de kuracak. <strong>Buhar \u00fcrete\u00e7lerinin<\/strong> ve <strong>ana sirk\u00fclasyon pompalama \u00fcnitesinin<\/strong> kaplar\u0131n\u0131n montaj\u0131ndan sonra,<strong> NGS\u2019nin birinci \u00e7evriminin<\/strong> ana ekipman\u0131n\u0131 birle\u015ftiren <strong>ana sirk\u00fclasyon boru hatt\u0131n\u0131n<\/strong> kaynak i\u015flerine ba\u015flanabilecek.<\/p>\n<p><strong>1\u2019inci g\u00fc\u00e7 \u00fcnitesinin<\/strong> reakt\u00f6r kab\u0131, <strong>Akkuyu NGS in\u015faat sahas\u0131<\/strong>na<strong> Kas\u0131m 2020\u2019de<\/strong> deniz yoluyla ula\u015ft\u0131r\u0131lm\u0131\u015ft\u0131. Reakt\u00f6r kab\u0131, kendisini getiren geminin <strong>Do\u011fu Kargo Terminali\u2019nde<\/strong> bo\u015falt\u0131lmas\u0131ndan sonra depolanmak \u00fczere <strong>sahaya ta\u015f\u0131nm\u0131\u015f<\/strong> ve<strong> orada kab\u0131n b\u00fct\u00fcnl\u00fc\u011f\u00fcn\u00fc<\/strong> ve <strong>y\u00fcksek kalitede imal edildi\u011fini<\/strong> do\u011frulayan giri\u015f kontrol\u00fc prosed\u00fcr\u00fcnden ge\u00e7mi\u015fti.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Akkuyu NGS in\u015faat sahas\u0131nda, ana ekipman\u0131n montaj\u0131yla ilgili ana a\u015famalardan biri olan 1\u2019inci g\u00fc\u00e7 \u00fcnitesine ait reakt\u00f6r bas\u0131n\u00e7 kab\u0131n\u0131n kurulumu tamamland\u0131. 1\u2019inci [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":135938,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[64575,20867,52259,74849,53348,91292,79895,91291,72483],"views":394,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/135935"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=135935"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/135935\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/135938"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=135935"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=135935"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=135935"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}