{"id":13593,"date":"2013-07-31T09:09:02","date_gmt":"2013-07-31T06:09:02","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=13593"},"modified":"2013-07-31T09:09:08","modified_gmt":"2013-07-31T06:09:08","slug":"zorlunun-israildeki-dogal-gaz-cevrim-santrali","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/zorlunun-israildeki-dogal-gaz-cevrim-santrali\/","title":{"rendered":"(Turkish) Zorlu\u2019nun \u0130srail\u2019deki Do\u011fal Gaz \u00c7evrim Santrali&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/13593\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Zorlu Enerji\u2019den yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, Zorlu Enerji, \u0130srail\u2019in Ashkelon b\u00f6lgesinde yer alan ve y\u00fczde 25 ortakl\u0131\u011f\u0131 bulunan Dorad Do\u011fal Gaz \u00c7evrim Santrali\u2019nin 400 KV \u015falt merkezi, 26 Temmuz 2013 Cuma g\u00fcn\u00fc enerjilendirilerek, \u00fclkenin elektrik iletim \u015febekesine ba\u011fland\u0131.<\/strong><\/p>\n<p>Zorlu Enerji\u2019nin \u0130srail\u2019de ortak oldu\u011fu 840 MW kapasiteli santralin 400 KV \u015falt merkezi iletim \u015febekesine ba\u011flanmas\u0131yla, 2014 y\u0131l\u0131n\u0131n Ocak ay\u0131ndan itibaren, ticari i\u015fletmeye ge\u00e7irilmesi ve tam kapasite ile \u00fcretime ba\u015flayacak.<\/p>\n<p>Dorad Do\u011fal Gaz \u00c7evrim Santrali\u2019nin, at\u0131k \u0131<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/zorlunun-israildeki-dogal-gaz-cevrim-santrali-iletim-sebekesine-baglandi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-13594\" title=\"zorlunun-israildeki-dogal-gaz-cevrim-santrali-iletim-sebekesine-baglandi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/zorlunun-israildeki-dogal-gaz-cevrim-santrali-iletim-sebekesine-baglandi-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/zorlunun-israildeki-dogal-gaz-cevrim-santrali-iletim-sebekesine-baglandi-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/zorlunun-israildeki-dogal-gaz-cevrim-santrali-iletim-sebekesine-baglandi-74x50.jpg 74w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/zorlunun-israildeki-dogal-gaz-cevrim-santrali-iletim-sebekesine-baglandi.jpg 486w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>s\u0131 kazanlar\u0131 ile buhar t\u00fcrbinleri ise Eyl\u00fcl ay\u0131ndan ba\u015flayarak Kas\u0131m\u2019a kadar aktif hale getirilecek. T\u00fcm santralin, kombine \u00e7evrim kabul testlerinin ise, Aral\u0131k ay\u0131nda ger\u00e7ekle\u015ftirilmesi planlan\u0131yor.<\/p>\n<p>Ayr\u0131ca Santralde bulunan her biri 48 MW kapasiteli ilk alt\u0131 gaz t\u00fcrbininin devreye alma ve test i\u015flemleri ba\u015flat\u0131ld\u0131. \u0130\u015flemler tamamlan\u0131nca t\u00fcrbinler ate\u015flenerek basit \u00e7evrim olarak devreye al\u0131nacak. A\u011fustos ay\u0131na kadar yine her biri 48 MW kapasiteli alt\u0131 gaz t\u00fcrbini daha ate\u015flenecek.<\/p>\n<p>\u0130srail\u2019in ilk \u00f6zel enerji yat\u0131r\u0131m\u0131 olan Dorad Do\u011fal Gaz Santrali\u2019nde \u00fcretim i\u00e7in son haz\u0131rl\u0131klar\u0131n\u0131 tamamlad\u0131klar\u0131n\u0131 ve b\u00f6lgesel g\u00fc\u00e7 olma yolunda hedeflerini destekleyecek f\u0131rsatlar\u0131 de\u011ferlendirmeye devam edeceklerini ifade eden Sinan Ak, \u015funlar\u0131 kaydetti:<\/p>\n<p>\u201cZorlu Enerji olarak, \u0130srail\u2019de ilk \u00f6zel enerji santralini kuruyoruz ve enerji pazar\u0131n\u0131n \u00f6nemli oyuncular\u0131ndan biriyiz. 2014 y\u0131l\u0131n\u0131n ba\u015f\u0131nda tam kapasiteyle \u00fcretime ge\u00e7irmeyi planlad\u0131\u011f\u0131m\u0131z Dorad Do\u011fal Gaz \u00c7evrim Santrali\u2019nin yan\u0131 s\u0131ra, yine orta\u011f\u0131 oldu\u011fumuz toplam kurulu g\u00fc\u00e7leri 175 MW olan Ashdod ve Ramat Negev santrallerinin de in\u015faat \u00e7al\u0131\u015fmalar\u0131na devam ediyoruz.Bu projeler, enerji ihtiyac\u0131 her ge\u00e7en g\u00fcn artan \u0130srail i\u00e7in olduk\u00e7a \u00f6nemli. Enerji sekt\u00f6r\u00fcndeki f\u0131rsatlar\u0131 de\u011ferlendirerek, b\u00f6lgesel g\u00fc\u00e7 olma yolundaki hedefimize ad\u0131m ad\u0131m yakla\u015f\u0131yoruz.\u201d<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/07\/30\/zorlunun-israildeki-dogal-gaz-cevrim-santrali-iletim-sebekesine-baglandi\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Zorlu Enerji\u2019den yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, Zorlu Enerji, \u0130srail\u2019in Ashkelon b\u00f6lgesinde yer alan ve y\u00fczde 25 ortakl\u0131\u011f\u0131 bulunan Dorad Do\u011fal Gaz \u00c7evrim Santrali\u2019nin 400 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":13594,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[92,1162,7284,7285,2479,19,63,67,2838,165,254,344],"views":1298,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13593"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=13593"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13593\/revisions"}],"predecessor-version":[{"id":13597,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13593\/revisions\/13597"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/13594"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=13593"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=13593"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=13593"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}