{"id":135677,"date":"2021-05-27T21:09:25","date_gmt":"2021-05-27T18:09:25","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=135677"},"modified":"2021-05-27T21:09:48","modified_gmt":"2021-05-27T18:09:48","slug":"2-000-mwlik-mini-yeka-res-yarismalari-belli-oluyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/2-000-mwlik-mini-yeka-res-yarismalari-belli-oluyor\/","title":{"rendered":"(Turkish) 2.000 Mw\u2019l\u0131k Mini Yeka Res Yar\u0131\u015fmalar\u0131 Belli Oluyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/135677\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>T\u00fcrkiye R\u00fczgar Enerjisi Birli\u011fi taraf\u0131ndan 26 May\u0131s\u2019ta d\u00fczenlenen \u201c\u0130lk YEKA Deneyimleri ve Gelecekteki Kapasite Tahsisleri\u201d temal\u0131 T\u00dcREK@home oturumu\u2019na kat\u0131lan Enerji \u0130\u015fleri Genel M\u00fcd\u00fcr\u00fc Murat Zekeriya Ayd\u0131n, 2 bin MW\u2019l\u0131k mini YEKA RES yar\u0131\u015fmalar\u0131n\u0131n tarihlerinin birka\u00e7 g\u00fcn i\u00e7erisinde ilan edilece\u011fini belirtti.<\/h1>\n<p><strong>Enerji \u0130\u015fleri Genel M\u00fcd\u00fcr\u00fc Murat Zekeriya Ayd\u0131n<\/strong>\u2019\u0131n moderat\u00f6rl\u00fc\u011f\u00fcn\u00fc \u00fcstlendi\u011fi oturum, sekt\u00f6r ve r\u00fczgar YEKA projeleriyle ilgili \u00f6nemli de\u011ferlendirmelere ev sahipli\u011fi yapt\u0131. <strong>26 May\u0131s\u2019ta<\/strong> d\u00fczenlenen oturuma, <strong>YEKA RES Genel M\u00fcd\u00fcr Yard\u0131mc\u0131s\u0131 Batur Yenmez, Siemens Gamesa Renewable Energy T\u00fcrkiye CEO\u2019su Ebru \u00c7i\u00e7ekliyurt, Enercon T\u00fcrkiye Genel M\u00fcd\u00fcr\u00fc Arif G\u00fcnyar<\/strong> ve <img loading=\"lazy\" class=\"alignright wp-image-135679\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/2-000-mwlik-mini-yeka-res-yarismalari-belli-oluyor-1.jpg\" alt=\"\" width=\"320\" height=\"194\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/2-000-mwlik-mini-yeka-res-yarismalari-belli-oluyor-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/2-000-mwlik-mini-yeka-res-yarismalari-belli-oluyor-1-300x182.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/2-000-mwlik-mini-yeka-res-yarismalari-belli-oluyor-1-500x303.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/2-000-mwlik-mini-yeka-res-yarismalari-belli-oluyor-1-80x48.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><strong>Enerjisa \u00dcretim Genel M\u00fcd\u00fcr Yard\u0131mc\u0131s\u0131 \u0130smail Bilgin<\/strong> konu\u015fmac\u0131 olarak kat\u0131ld\u0131.<\/p>\n<p>Enerji \u0130\u015fleri Genel M\u00fcd\u00fcr\u00fc Murat Zekeriya Ayd\u0131n, ilk olarak Enerji Bakan Yard\u0131mc\u0131s\u0131 Abdullah Tancan taraf\u0131ndan bir \u00f6nceki <strong>T\u00dcREK toplant\u0131s\u0131<\/strong>nda duyurulan <strong>2 bin MW<\/strong>\u2019l\u0131k <strong>Mini YEKA RES yar\u0131\u015fma<\/strong> takviminin bir iki g\u00fcn i\u00e7erisinde a\u00e7\u0131klanaca\u011f\u0131n\u0131 belirtti. Ayd\u0131n, <strong>20, 90 ve 100 MW\u2019lar<\/strong> \u015feklinde planlanan <strong>Mini YEKA RES yar\u0131\u015fmalar\u0131<\/strong> sayesinde t\u0131pk\u0131 <strong>g\u00fcne\u015fte oldu\u011fu gibi<\/strong> <strong>k\u00fc\u00e7\u00fck<\/strong> ve <strong>orta \u00f6l\u00e7ekli<\/strong> yat\u0131r\u0131mc\u0131lar\u0131n da <strong>YEKA yar\u0131\u015fmalar\u0131nda<\/strong> yer alma \u015fans\u0131 bulaca\u011f\u0131na vurgu yapt\u0131. Ayd\u0131n, bu t\u00fcr geli\u015fmelerin yat\u0131r\u0131mlar\u0131n tabana yay\u0131lmas\u0131 ad\u0131na \u00e7ok k\u0131ymetli oldu\u011funun da alt\u0131n\u0131 \u00e7izdi.<\/p>\n<h2><strong>\u201cYEKA\u2019lar b\u00fcy\u00fck yat\u0131r\u0131mc\u0131lar\u0131 \u00e7ekmek i\u00e7in \u00f6nemli\u201d<\/strong><\/h2>\n<p><strong>YEKA 1<\/strong> ve <strong>YEKA 2\u2019de<\/strong> oldu\u011fu gibi <strong>b\u00fcy\u00fck \u00f6l\u00e7ekli yar\u0131\u015fmalar\u0131n<\/strong> yabanc\u0131 yat\u0131r\u0131mc\u0131lar\u0131 T\u00fcrkiye\u2019ye \u00e7ekmek ve Ar-Ge yat\u0131r\u0131mlar\u0131na ikna etmek i\u00e7in b\u00fcy\u00fck rol\u00fc oldu\u011funu kaydeden Siemens Gamesa Renewable Energy T\u00fcrkiye CEO\u2019su Ebru \u00c7i\u00e7ekliyurt, <strong>YEKA kapsam\u0131nda<\/strong> \u0130zmir\u2019de kurduklar\u0131<strong> Ar-Ge Merkezi\u2019nde<\/strong> hem \u015fartnamede belirtilen ko\u015fullar\u0131n hem de kendi beklentilerinin \u00f6tesinde geli\u015fmeler oldu\u011funu aktard\u0131. \u201c\u015eartnameye g\u00f6re tam zamanl\u0131 \u00e7al\u0131\u015facak <strong>50 m\u00fchendis<\/strong> arkada\u015f\u0131m\u0131z\u0131 istihdam etmemiz gerekiyordu; bu merkezi Siemens Gamesa\u2019n\u0131n d\u00fcnya genelindeki <strong>6 Ar-Ge Merkezinden<\/strong> biri olarak konumlama karar\u0131m\u0131z do\u011frultusunda biz bu say\u0131y\u0131 <strong>70\u2019e<\/strong> \u00e7\u0131kard\u0131k. Y\u0131l sonuna kadar daha da art\u0131rmay\u0131 planl\u0131yoruz\u201d diyen \u00c7i\u00e7ekliyurt, <strong>offshore (deniz \u00fcst\u00fc) r\u00fczgar santralleri<\/strong>yle ilgili bir soruyu da \u201cBiz T\u00fcrkiye\u2019nin <strong>off-shore potansiyeline<\/strong> inan\u0131yoruz. <strong>Uzun vadede offshore<\/strong> gibi alternatif teknolojileri \u00e7al\u0131\u015fmakta yarar var\u201d \u015feklinde cevaplad\u0131.<\/p>\n<h2><strong>\u201cDijitalle\u015fme alan\u0131ndaki \u00e7abalar\u0131m\u0131z\u0131 art\u0131rmam\u0131z gerek\u201d<\/strong><\/h2>\n<p><strong>YEKA RES 1<\/strong> kapsam\u0131ndaki \u00e7al\u0131\u015fmalar\u0131n h\u0131zla devam etti\u011fini belirten <strong>YEKA RES<\/strong> \u015firketi Genel M\u00fcd\u00fcr Yard\u0131mc\u0131s\u0131 <strong>Batur Yenmez<\/strong>, <em>\u201cYenilenebilir enerji teknolojilerine sahip olmak demek enerjide ba\u011f\u0131ms\u0131z olmak demek. Ayr\u0131ca sekt\u00f6r\u00fcn dijitalle\u015fmesini de \u00e7ok \u00f6nemsiyoruz. <strong>R\u00fczgar t\u00fcrbinleri<\/strong>nin kontrol merkezleriyle ilgili bilgi birikiminin T\u00fcrkiye\u2019de geli\u015ftirilmesi ve bu konunun <strong>te\u015fvik edilmesi \u00f6nemli<\/strong>\u201d<\/em> dedi. Batur Yenmez, ayr\u0131ca yat\u0131r\u0131m s\u00fcre\u00e7lerinde \u00f6rne\u011fin <strong>orman<\/strong> ya da di\u011fer<strong> ilgili izin s\u00fcre\u00e7lerinin<\/strong> tan\u0131mlanmas\u0131n\u0131n bilinmezliklerin \u00f6n\u00fcne ge\u00e7ece\u011fini de vurgulad\u0131.<\/p>\n<h2><strong>\u201cYar\u0131\u015fmalar \u00f6ncesi yeterlilik kriterleri aranmal\u0131\u201d<\/strong><\/h2>\n<p>Enercon olarak 2011\u2019den bu yana T\u00fcrkiye\u2019de \u00fcretim yapt\u0131klar\u0131n\u0131n alt\u0131n\u0131 \u00e7izen Enercon T\u00fcrkiye Genel M\u00fcd\u00fcr\u00fc<strong> Arif G\u00fcnyar<\/strong> ise, <strong>YEKA tecr\u00fcbelerinin<\/strong> bug\u00fcne kadar \u00e7ok olumlu oldu\u011funu, bundan sonra da YEKA s\u00fcre\u00e7lerinin daha sa\u011fl\u0131kl\u0131 ilerlemesi i\u00e7in Enerji Bakanl\u0131\u011f\u0131 taraf\u0131ndan belirlenecek birtak\u0131m yeterlilik kriterlerine ihtiya\u00e7 oldu\u011funu s\u00f6yledi. \u201cEkonomik dinamikler, pandemi kaynakl\u0131 dalgalanmalar, d\u00fcnya ve T\u00fcrkiye genelinde <strong>hammadde fiyatlar\u0131ndaki beklenmedik geli\u015fmeler<\/strong> hepimizi etkiledi. Bunun ne kadar devam edece\u011fini de bilemiyoruz ancak bug\u00fcnden bak\u0131ld\u0131\u011f\u0131nda <strong>en az 3 sene sonras\u0131<\/strong> i\u00e7in tahmin yapabiliyor olmam\u0131z gerek\u201d diyen G\u00fcnyar, T\u00fcrkiye\u2019nin halihaz\u0131rda <strong>karasal r\u00fczgar potansiyeli<\/strong>nin ancak <strong>4\u2019te birini<\/strong> kulland\u0131\u011f\u0131n\u0131 ve \u00f6nceli\u011fin bu alana verilmesi gerekti\u011fini belirtti. G\u00fcnyar, <strong>Orta<\/strong> ve <strong>Do\u011fu Anadolu<\/strong> ile<strong> Akdeniz<\/strong> ve<strong> Karadeniz<\/strong>\u2019in <strong>r\u00fczgar kapasitesi<\/strong> a\u00e7\u0131s\u0131ndan halen bakir konumda oldu\u011funu ve Enerji Bakanl\u0131\u011f\u0131 ile birlikte buralardaki <strong>kapasitenin kullan\u0131lmas\u0131n\u0131n<\/strong> \u00f6nemli oldu\u011funu da s\u00f6zlerine ekledi.<\/p>\n<h2><strong>\u201cHidrojende Ar-Ge \u00e7al\u0131\u015fmalar\u0131m\u0131z devam ediyor\u201d<\/strong><\/h2>\n<p>Bir yandan konvansiyonel alanda <strong>b\u00fcy\u00fck \u00e7apl\u0131 yat\u0131r\u0131mlar\u0131na<\/strong> devam ederken bir yandan da <strong>hidrojen, floating solar<\/strong> gibi alanlarda <strong>Ar-Ge \u00e7al\u0131\u015fmalar\u0131<\/strong>n\u0131n devam etti\u011fini kaydeden Enerjisa \u00dcretim Genel M\u00fcd\u00fcr Yard\u0131mc\u0131s\u0131 <strong>\u0130smail Bilgin<\/strong> de bu alandaki geli\u015fmeleri yak\u0131ndan takip ettiklerini belirtti. <strong>YEKA s\u00fcre\u00e7lerinin<\/strong> iyile\u015ftirilmesiyle ilgili olarak yat\u0131r\u0131mc\u0131n\u0131n \u00f6nceden bilemeyece\u011fi risklerin kamuca \u00f6nden et\u00fcd edilip <strong>ihale s\u00fcrecine al\u0131nmas\u0131n\u0131n<\/strong> k\u00f6t\u00fc s\u00fcrprizleri ortadan kald\u0131raca\u011f\u0131n\u0131 s\u00f6yleyen Bilgin, \u201c<strong>Hele<\/strong> <strong>offshore\u2019a<\/strong> ba\u015flay\u0131nca bu konu daha \u00e7ok g\u00fcndeme gelebilir. Yat\u0131r\u0131mc\u0131n\u0131n yapamayaca\u011f\u0131, kamu kurumlar\u0131ndan g\u00f6r\u00fc\u015f alamayaca\u011f\u0131 ya da muhatap bulamayaca\u011f\u0131 alanlar i\u00e7in <strong>\u00f6n et\u00fcdler \u00f6nemli<\/strong> olacakt\u0131r. <strong>Mini YEKA&#8217;larla yat\u0131r\u0131mc\u0131 say\u0131s\u0131<\/strong> art\u0131nca bu Bakanl\u0131\u011f\u0131m\u0131z\u0131n da i\u015fini kolayla\u015ft\u0131racakt\u0131r\u201d de\u011ferlendirmesinde bulundu.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye R\u00fczgar Enerjisi Birli\u011fi taraf\u0131ndan 26 May\u0131s\u2019ta d\u00fczenlenen \u201c\u0130lk YEKA Deneyimleri ve Gelecekteki Kapasite Tahsisleri\u201d temal\u0131 T\u00dcREK@home oturumu\u2019na kat\u0131lan Enerji \u0130\u015fleri Genel [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":135680,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[11683,52259,91077,91078,21719,53282,91076,81614,88447,3390,91075,8551],"views":528,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/135677"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=135677"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/135677\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/135680"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=135677"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=135677"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=135677"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}