{"id":135403,"date":"2021-05-23T19:49:12","date_gmt":"2021-05-23T16:49:12","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=135403"},"modified":"2021-05-23T19:50:26","modified_gmt":"2021-05-23T16:50:26","slug":"euas-in-tgt-enerji-deki-payi-satis-yolu-ile-ozellestirilecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/euas-in-tgt-enerji-deki-payi-satis-yolu-ile-ozellestirilecek\/","title":{"rendered":"(Turkish) E\u00dcA\u015e\u2019\u0131n TGT Enerji\u2019deki Pay\u0131 Sat\u0131\u015f Yolu ile \u00d6zelle\u015ftirilecek"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/135403\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>E\u00dcA\u015e&#8217;\u0131n TGT Enerji A.\u015e.\u2019deki pay\u0131, sat\u0131\u015f <img loading=\"lazy\" class=\"alignright wp-image-135405\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/euas-in-tgt-enerji-deki-payi-satis-yolu-ile-ozellestirilecek.jpg\" alt=\"\" width=\"320\" height=\"197\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/euas-in-tgt-enerji-deki-payi-satis-yolu-ile-ozellestirilecek.jpg 700w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/euas-in-tgt-enerji-deki-payi-satis-yolu-ile-ozellestirilecek-300x184.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/euas-in-tgt-enerji-deki-payi-satis-yolu-ile-ozellestirilecek-500x307.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/euas-in-tgt-enerji-deki-payi-satis-yolu-ile-ozellestirilecek-80x50.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>yoluyla \u00f6zelle\u015ftirilecek.<\/h1>\n<p><strong>Elektrik \u00dcretim A.\u015e Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc&#8217;n\u00fcn (E\u00dcA\u015e)<\/strong>, <strong>TGT Enerji&#8217;deki<\/strong>\u00a0<strong>% 0,03158<\/strong> oran\u0131na sahip\u00a0<strong>i\u015ftirak pay\u0131,<\/strong> <em>4010 say\u0131l\u0131 Cumhurba\u015fkanl\u0131\u011f\u0131<\/em> Karar\u0131 uyar\u0131nca<strong>, sat\u0131\u015f <\/strong>yolu ile<strong> \u00f6zelle\u015ftirilecek<\/strong>.<\/p>\n<p>\u00d6zelle\u015ftirme <strong>31 Aral\u0131k 2025<\/strong> kadar tamamlanacak olup <strong>TGT Enerji<\/strong>&#8216;nin <strong>Mersin Erdemli<\/strong>\u2019deki <strong>Lamas 3<\/strong> ve <strong>Lamas 4 Hidroelektrik Santralleri<\/strong> bulunurken toplam da <strong>35,258MWe<\/strong> i\u015fletme kapasitesi bulunan bu <strong>2 santral<\/strong>in\u00a0<strong>31 A\u011fustos 2055 y\u0131l\u0131na<\/strong>\u00a0kadar<strong> ge\u00e7erli \u00fcretim lisans\u0131<\/strong> mevcuttur.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. E\u00dcA\u015e&#8217;\u0131n TGT Enerji A.\u015e.\u2019deki pay\u0131, sat\u0131\u015f yoluyla \u00f6zelle\u015ftirilecek. Elektrik \u00dcretim A.\u015e Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc&#8217;n\u00fcn (E\u00dcA\u015e), TGT Enerji&#8217;deki\u00a0% 0,03158 oran\u0131na sahip\u00a0i\u015ftirak pay\u0131, 4010 say\u0131l\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":135405,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[53114,52259,42300,90834,90833,1248,90832],"views":718,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/135403"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=135403"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/135403\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/135405"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=135403"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=135403"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=135403"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}