{"id":135379,"date":"2021-05-23T13:51:18","date_gmt":"2021-05-23T10:51:18","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=135379"},"modified":"2021-05-23T13:51:18","modified_gmt":"2021-05-23T10:51:18","slug":"2021-yili-kapasite-destegine-yonelik-basvurular-acildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/2021-yili-kapasite-destegine-yonelik-basvurular-acildi\/","title":{"rendered":"(Turkish) 2021 Y\u0131l\u0131 Kapasite Deste\u011fine Y\u00f6nelik Ba\u015fvurular A\u00e7\u0131ld\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/135379\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>31487 say\u0131l\u0131 ve 21.05.2021 tarihli Resmi Gazete\u2019de \u201cElektrik Piyasas\u0131 Kapasite Mekanizmas\u0131 Y\u00f6netmeli\u011finde De\u011fi\u015fiklik Yap\u0131lmas\u0131na Dair Y\u00f6netmelik\u201d yay\u0131mlanm\u0131\u015f <span style=\"text-decoration: underline;\">olup Y\u00f6netmeli\u011fin;<\/span><\/h1>\n<p><strong><em>\u201cMADDE 2 \u2013\u00a0<\/em><\/strong><em>Ayn\u0131 Y\u00f6netmeli\u011fin 6\u00a0nc\u0131\u00a0maddesinin ikinci f\u0131kras\u0131n\u0131n (b) bendinde yer alan \u201cYap i\u015flet ve\u201d ibaresi y\u00fcr\u00fcrl\u00fckten kald\u0131r\u0131lm\u0131\u015f, \u201cyap i\u015flet devret\u201d ibaresi \u201cYap \u0130\u015flet Devret\u201d olarak de\u011fi\u015ftirilmi\u015f, ayn\u0131 f\u0131kran\u0131n (g) bendi y\u00fcr\u00fcrl\u00fckten kald\u0131r\u0131lm\u0131\u015f, (\u011f) bendi a\u015fa\u011f\u0131daki \u015fekilde de\u011fi\u015ftirilmi\u015f, ayn\u0131 <img loading=\"lazy\" class=\"alignright wp-image-135381\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/2021-yili-kapasite-destegine-yonelik-basvurular-acildi.jpg\" alt=\"\" width=\"320\" height=\"188\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/2021-yili-kapasite-destegine-yonelik-basvurular-acildi.jpg 810w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/2021-yili-kapasite-destegine-yonelik-basvurular-acildi-300x176.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/2021-yili-kapasite-destegine-yonelik-basvurular-acildi-768x451.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/2021-yili-kapasite-destegine-yonelik-basvurular-acildi-500x294.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/2021-yili-kapasite-destegine-yonelik-basvurular-acildi-80x47.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>maddenin d\u00f6rd\u00fcnc\u00fc f\u0131kras\u0131nda yer alan \u201c,(g)\u201d ibaresi y\u00fcr\u00fcrl\u00fckten kald\u0131r\u0131lm\u0131\u015ft\u0131r.\u201d<\/em><\/p>\n<p><strong><em>\u201cGE\u00c7\u0130C\u0130 MADDE 4 \u2013<\/em><\/strong><em>\u00a0(1) Bu maddeyi ihdas eden Y\u00f6netmelik ile 6\u00a0nc\u0131\u00a0maddenin ikinci f\u0131kras\u0131n\u0131n (b) ve (g) bentleri kapsam\u0131nda yap\u0131lan de\u011fi\u015fikliklerden etkilenen ve 2021 y\u0131l\u0131 Kapasite Mekanizmas\u0131na ba\u015fvurmak isteyen lisans sahibi t\u00fczel ki\u015filer, bu maddenin yay\u0131m\u0131 tarihinden itibaren 15 g\u00fcn i\u00e7erisinde Sistem \u0130\u015fletmecisine ba\u015fvurur ve ba\u015fvurusu uygun bulunan t\u00fczel ki\u015filerin santralleri, ba\u015fvuru tarihinden itibaren kapasite mekanizmas\u0131ndan yararlanacak tesisler listesine eklenir.\u201d<\/em><\/p>\n<p>H\u00fck\u00fcmleri do\u011frultusunda belirtilen<strong> \u015fartlar\u0131 ta\u015f\u0131yan santrallere<\/strong> sahip <strong>T\u00fczel Ki\u015filerin<\/strong> 2021 y\u0131l\u0131nda Kapasite Mekanizmas\u0131ndan yararlanabilmeleri i\u00e7in, duyuru ekinde <strong>yer alan formu doldurup<\/strong> eklerini haz\u0131rlayarak <strong>04 Haziran 2021 (Cuma) tarihi<\/strong> mesai bitimine kadar Te\u015fekk\u00fcl\u00fcm\u00fcze ba\u015fvurmalar\u0131 gerekmektedir.<\/p>\n<p><strong>Ba\u015fvuru formu her santral i\u00e7in ayr\u0131 olarak haz\u0131rlanacak<\/strong>\u00a0olup resmi yaz\u0131 ekinde <strong>Te\u015fekk\u00fcl\u00fcm\u00fcz Y\u00fck Tevzi Dairesi Ba\u015fkanl\u0131\u011f\u0131&#8217;<\/strong>na sunulmal\u0131d\u0131r.<\/p>\n<h2><strong>KAPAS\u0130TE MEKAN\u0130ZMASINA BA\u015eVURACAK OLAN DO\u011eALGAZ YAKITLI SANTRALLER \u0130\u00c7\u0130N VER\u0130M HESABI<\/strong><\/h2>\n<p><strong>Elektrik Piyasas\u0131 Kapasite Mekanizmas\u0131<\/strong> 6. Maddesinin 2. F\u0131kras\u0131n\u0131n \u011f) bendinde do\u011falgaz santralleri i\u00e7in verimlilik oran\u0131n\u0131n <strong>\u00fcst \u0131s\u0131l de\u011fer baz al\u0131narak<\/strong> hesaplanaca\u011f\u0131 belirtilmektedir. Bu nedenle ge\u00e7ici kabul\u00fcnde a\u00e7\u0131k bi\u00e7imde <strong>\u00fcst \u0131s\u0131l de\u011fer \u00fczerinden verimlilik oran\u0131<\/strong> yer almayan do\u011falgaz santrallerinin, verimlilik oran\u0131n\u0131 a\u015fa\u011f\u0131da belirtilen \u015fekilde <strong>hesaplamalar\u0131<\/strong> ve <strong>verim hesab\u0131n\u0131 da<\/strong> ba\u015fvuru yap\u0131lan yaz\u0131ya eklemeleri gerekmektedir.<\/p>\n<p>&#8211; <strong>Do\u011fal Gaz\u0131n Faturaland\u0131rmaya Esas Sat\u0131\u015f Miktar\u0131n\u0131n Tespiti<\/strong> ve <strong>Faturaland\u0131r\u0131lmas\u0131na \u0130li\u015fkin Esaslar Hakk\u0131nda Tebli\u011fde<\/strong> do\u011fal gaz\u0131n referans \u00fcst \u0131s\u0131l de\u011feri olarak <strong>9155 kcal\/m3<\/strong> esas al\u0131naca\u011f\u0131 d\u00fczenlenmi\u015ftir. Ge\u00e7ici kabul\u00fcnde a\u00e7\u0131k bi\u00e7imde <strong>\u00fcst \u0131s\u0131l de\u011fer<\/strong> \u00fczerinden <strong>verimlilik oran\u0131<\/strong> yer almayan do\u011falgaz santralleri i\u00e7in; ge\u00e7ici kabulde bulunan ve <strong>alt \u0131s\u0131l de\u011fer \u00fczerinden hesaplanm\u0131\u015f v<\/strong>erimlilik de\u011ferinin ge\u00e7ici kabuldeki hesaplamaya esas do\u011falgaz alt \u0131s\u0131l de\u011ferine \u00e7arp\u0131lmas\u0131 ve do\u011fal gaz\u0131n referans \u00fcst \u0131s\u0131l de\u011feri olan <strong>9155 kcal\/m3<\/strong> ile b\u00f6l\u00fcnmesinden ortaya \u00e7\u0131kan yeni verimlilik de\u011ferinin baz al\u0131nmas\u0131n\u0131n uygundur.<\/p>\n<p><b>Daha Detayl\u0131 Bilgi \u0130\u00e7in:\u00a0<\/b><a href=\"https:\/\/www.teias.gov.tr\/tr-TR\/haberler\/2021-yili-kapasite-mekanizmasi-basvurulari-hakkinda\" target=\"_blank\" rel=\"nofollow noopener\">https:\/\/www.teias.gov.tr\/tr-TR\/haberler\/2021-yili-kapasite-mekanizmasi-basvurulari-hakkinda<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. 31487 say\u0131l\u0131 ve 21.05.2021 tarihli Resmi Gazete\u2019de \u201cElektrik Piyasas\u0131 Kapasite Mekanizmas\u0131 Y\u00f6netmeli\u011finde De\u011fi\u015fiklik Yap\u0131lmas\u0131na Dair Y\u00f6netmelik\u201d yay\u0131mlanm\u0131\u015f olup Y\u00f6netmeli\u011fin; \u201cMADDE 2 \u2013\u00a0Ayn\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":135381,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,51,53],"tags":[54036,53114,41323,52259],"views":331,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/135379"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=135379"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/135379\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/135381"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=135379"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=135379"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=135379"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}