{"id":135271,"date":"2021-05-21T15:32:01","date_gmt":"2021-05-21T12:32:01","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=135271"},"modified":"2021-05-21T15:57:09","modified_gmt":"2021-05-21T12:57:09","slug":"elektrik-piyasasi-kapasite-mekanizmasi-yonetmeliginde-degisiklik-yapildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/elektrik-piyasasi-kapasite-mekanizmasi-yonetmeliginde-degisiklik-yapildi\/","title":{"rendered":"(Turkish) Elektrik Piyasas\u0131 Kapasite Mekanizmas\u0131 Y\u00f6netmeli\u011fi&#8217;nde De\u011fi\u015fiklik"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/135271\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Bu kapsamda, bir \u00f6nceki y\u00f6netmelikte, lisans\u0131nda yer alan, &#8220;mevcut ve i\u015fletmede olan, ge\u00e7ici kabul tarihi en eski \u00fcnitesinin ge\u00e7ici kabul tarihinden ba\u015flayarak hesaplanan santral ya\u015f\u0131 13 y\u0131ldan b\u00fcy\u00fck yerli kaynaklara dayal\u0131 olmayan santraller kapasite mekanizmas\u0131nda yer alamayacak&#8221; ibaresi y\u00fcr\u00fcrl\u00fckten kald\u0131r\u0131ld\u0131.<\/h1>\n<p>De\u011fi\u015fiklikle, &#8220;<strong>verimlilik performans testi<\/strong>ne ili\u015fkin <strong>te\u015fvik edici belgede<\/strong> veya Bakanl\u0131\u011fa <img loading=\"lazy\" class=\"alignright wp-image-135274\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/elektrik-piyasasi-kapasite-mekanizmasi-yonetmeliginde-degisiklik-yapildi.jpg\" alt=\"\" width=\"320\" height=\"182\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/elektrik-piyasasi-kapasite-mekanizmasi-yonetmeliginde-degisiklik-yapildi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/elektrik-piyasasi-kapasite-mekanizmasi-yonetmeliginde-degisiklik-yapildi-300x170.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/elektrik-piyasasi-kapasite-mekanizmasi-yonetmeliginde-degisiklik-yapildi-500x284.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/elektrik-piyasasi-kapasite-mekanizmasi-yonetmeliginde-degisiklik-yapildi-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>ba\u015fvurularak tekrarlanan verimlilik performans testi sonu\u00e7lar\u0131nda verimlilik oran\u0131 <strong>% 50<\/strong>&#8216;nin alt\u0131nda oldu\u011fu belirlenen,<strong> yerli kaynaklara dayal\u0131 olmayan<\/strong> santraller mekanizmadan faydalanamayacak.<\/p>\n<p>Ba\u015fvurular\u0131n al\u0131nd\u0131\u011f\u0131 son tarihten geriye do\u011fru <strong>12 ayl\u0131k d\u00f6nemde<\/strong> a\u011f\u0131rl\u0131kl\u0131 ortalama <strong>kapasite kullan\u0131m oran\u0131<\/strong> yerli kaynaklara dayal\u0131 olanlarda <strong>% 10<\/strong>&#8216;un, di\u011ferlerinde <strong>% 15<\/strong>\u2019in alt\u0131nda olan santrallere ilgili d\u00f6nem i\u00e7in herhangi bir <strong>kapasite \u00f6demesi<\/strong> yap\u0131lmayacak.<\/p>\n<p><strong>\u0130thal k\u00f6m\u00fcr<\/strong> veya<strong> do\u011fal gaz yak\u0131tl\u0131 santraller<\/strong>de, bir fatura d\u00f6nemi i\u00e7erisinde<strong> yerli k\u00f6m\u00fcr<\/strong> veya <strong>yerli do\u011fal gaz kullan\u0131larak<\/strong> elektrik \u00fcretimi yap\u0131lmas\u0131 halinde, <strong>yerli k\u00f6m\u00fcr<\/strong> veya<strong> yerli do\u011fal gaz kullan\u0131larak<\/strong> yap\u0131lan \u00fcretim miktar\u0131 oran\u0131nda<strong> kapasite \u00f6demesi<\/strong> yap\u0131lacak.<\/p>\n<p>S\u00f6z konusu \u00f6deme hesaplamalar\u0131nda kullan\u0131lmak \u00fczere, olmas\u0131 halinde <strong>E\u00dcA\u015e<\/strong> ile <strong>enerji al\u0131\u015f anla\u015fmas\u0131<\/strong> yapm\u0131\u015f olan santrallerin <strong>yerli k\u00f6m\u00fcr kullanarak<\/strong> yapt\u0131klar\u0131 \u00fcretim miktar\u0131 oran\u0131, ilgili anla\u015fman\u0131n ge\u00e7erli oldu\u011fu s\u00fcrece <strong>E\u00dcA\u015e<\/strong> taraf\u0131ndan, santrallerin<strong> yerli do\u011fal gaz kullanarak<\/strong> yapt\u0131klar\u0131 \u00fcretim miktar\u0131 oran\u0131 ise ilgili <strong>t\u00fczel ki\u015filer<\/strong> taraf\u0131ndan kuruma bildirilen<strong> elektronik bildirim<\/strong> sistemi arac\u0131l\u0131\u011f\u0131yla veya <strong>BOTA\u015e<\/strong> taraf\u0131ndan <strong>TE\u0130A\u015e<\/strong>&#8216;a bildirilecek.<\/p>\n<p>B\u00f6ylece <strong>E\u00dcA\u015e<\/strong> ile <strong>enerji al\u0131\u015f anla\u015fmas\u0131<\/strong> yapmam\u0131\u015f olan santrallerin <strong>yerli k\u00f6m\u00fcr<\/strong> kullanarak yapt\u0131klar\u0131 \u00fcretim miktar\u0131 oran\u0131 ise<strong> TE\u0130A\u015e<\/strong> taraf\u0131ndan belirlenecek.<\/p>\n<p>Di\u011fer yandan, <strong>Elektrik Piyasas\u0131nda Yenilenebilir Enerji Kaynak Garanti Belgesi Y\u00f6netmeli\u011fi<\/strong>nde De\u011fi\u015fiklik Yap\u0131lmas\u0131na Dair Y\u00f6netmelik de yay\u0131mland\u0131.<\/p>\n<p>Buna g\u00f6re, <strong>EPDK<\/strong>&#8216;nin t\u00fcketicilerin kulland\u0131\u011f\u0131<strong> elektri\u011fin yenilenebilir enerji kaynaklar\u0131ndan<\/strong> \u00fcretildi\u011fini garanti eden<strong> Yenilenebilir Enerji Kaynak Garanti (YEK-G) sistemi<\/strong>ne ili\u015fkin <strong>usul<\/strong> ve <strong>esaslar\u0131n<\/strong> belirlendi\u011fi y\u00f6netmelik de yer alan ilgili mevzuata, <strong>&#8220;kanun&#8221; ibaresi<\/strong>nden sonra gelmek \u00fczere <strong>&#8220;Cumhurba\u015fkanl\u0131\u011f\u0131 kararnamesi, Cumhurba\u015fkan\u0131 karar\u0131&#8221;<\/strong> ibaresi de eklendi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Bu kapsamda, bir \u00f6nceki y\u00f6netmelikte, lisans\u0131nda yer alan, &#8220;mevcut ve i\u015fletmede olan, ge\u00e7ici kabul tarihi en eski \u00fcnitesinin ge\u00e7ici kabul tarihinden ba\u015flayarak [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":135283,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,51,53,24649],"tags":[5070,90718,90717,42317,42300,36623,77659],"views":212,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/135271"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=135271"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/135271\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/135283"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=135271"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=135271"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=135271"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}