{"id":135210,"date":"2021-05-20T12:51:21","date_gmt":"2021-05-20T09:51:21","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=135210"},"modified":"2021-05-20T12:51:21","modified_gmt":"2021-05-20T09:51:21","slug":"cindeki-tianwan-ve-xudapu-nukleer-santrallerinin-guc-unite-temeli-atildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/cindeki-tianwan-ve-xudapu-nukleer-santrallerinin-guc-unite-temeli-atildi\/","title":{"rendered":"(Turkish) \u00c7in\u2019deki Tianwan ve Xudapu N\u00fckleer Santrallerinin G\u00fc\u00e7 \u00dcnite Temeli At\u0131ld\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/135210\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Rusya ve \u00c7in aras\u0131nda n\u00fckleer alanda geli\u015ftirilen i\u015fbirli\u011fi t\u00fcm h\u0131z\u0131yla devam ediyor. Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019ni (NGS) de in\u015fa eden Rusya Devlet Atom Enerjisi Kurumu Rosatom\u2019un, \u00c7in\u2019de yap\u0131m\u0131n\u0131 s\u00fcrd\u00fcrd\u00fc\u011f\u00fc Tianwan ve Xudapu N\u00fckleer G\u00fc\u00e7 Santrallerinin yeni g\u00fc\u00e7 \u00fcnitelerinin temeli t\u00f6renle at\u0131ld\u0131.<\/h1>\n<p>Tianwan NGS\u2019nin 7&#8217;inci ve 8&#8217;inci \u00fcniteleri ile, Xudapu NGS\u2019nin 3&#8217;\u00fcnc\u00fc ve 4&#8217;\u00fcnc\u00fc \u00fcnitelerinin temel atma t\u00f6renine Rusya Devlet Ba\u015fkan\u0131 Vladimir Putin ve \u00c7in Devlet Ba\u015fkan\u0131 \u015ei Cinping telekonferans <img loading=\"lazy\" class=\"alignright wp-image-135212\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/cindeki-tianwan-ve-xudapu-nukleer-santrallerinin-guc-unite-temeli-atildi-2.jpg\" alt=\"\" width=\"320\" height=\"206\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/cindeki-tianwan-ve-xudapu-nukleer-santrallerinin-guc-unite-temeli-atildi-2.jpg 510w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/cindeki-tianwan-ve-xudapu-nukleer-santrallerinin-guc-unite-temeli-atildi-2-300x193.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/cindeki-tianwan-ve-xudapu-nukleer-santrallerinin-guc-unite-temeli-atildi-2-500x322.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/cindeki-tianwan-ve-xudapu-nukleer-santrallerinin-guc-unite-temeli-atildi-2-78x50.jpg 78w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>y\u00f6ntemiyle kat\u0131ld\u0131.<\/p>\n<p>Rosatom\u2019un Genel M\u00fcd\u00fcr\u00fc Aleksey Likhachev, Rusya\u2019n\u0131n ortakl\u0131\u011f\u0131yla in\u015fa edilen <strong>Tianwan NGS<\/strong>\u2019nin hali haz\u0131rda faaliyette olan ilk d\u00f6rt \u00fcnitesinin \u015fu ana kadar 270 milyar kilovatsaatin \u00fczerinde enerji \u00fcretti\u011fine dikkat \u00e7ekerek, \u201c<strong>Tianwan NGS<\/strong>\u2019inin devredeki g\u00fc\u00e7 \u00fcniteleri g\u00fcvenilir bir \u015fekilde \u00c7in halk\u0131na hizmet etmeye ve <strong>\u00c7in\u2019in enerji g\u00fcvenli\u011fini sa\u011flama<\/strong> konusunda \u00f6nemli katk\u0131lar sunmaya devam ediyor\u201d \u015feklinde konu\u015ftu.<\/p>\n<p><strong>Rusya<\/strong> ve <strong>\u00c7in<\/strong>\u2019in <strong>ortak n\u00fckleer enerji projesi<\/strong>, en kapsaml\u0131lar\u0131 2018 y\u0131l\u0131nda imzalanan bir dizi stratejik anla\u015fma \u00e7er\u00e7evesinde y\u00fcr\u00fct\u00fcl\u00fcyor. <strong>Yeni g\u00fc\u00e7 \u00fcniteleri<\/strong>, \u00c7in\u2019in mevcut<strong> n\u00fckleer enerji kapasitesi<\/strong>ni art\u0131rarak \u00fclkeye g\u00fcvenilir ve temiz elektrik sa\u011flayacak.<\/p>\n<p>\u00c7in\u2019in Jiangsu eyaletinin Lianyungang \u015fehrinde yer alan <strong>Tianwan NGS<\/strong>, <strong>Rus-\u00c7in ekonomik ortakl\u0131\u011f\u0131<\/strong>n\u0131n en b\u00fcy\u00fck \u00f6rne\u011fi olma \u00f6zelli\u011fini ta\u015f\u0131yor. Rus uzmanlarca in\u015fa edilen ve <strong>VVER-1000 reakt\u00f6rleri<\/strong>nin yer ald\u0131\u011f\u0131 ilk iki g\u00fc\u00e7 \u00fcnitesi<strong> 2007<\/strong>, <strong>3\u2019\u00fcnc\u00fc<\/strong> ve <strong>4\u2019\u00fcnc\u00fc<\/strong> \u00fcniteleri ise 2018\u2019den bu yana faaliyet g\u00f6steriyor. Her biri <strong>1200 MW<\/strong> kapasiteli <strong>7\u2019nci<\/strong> ve <strong>8\u2019inci<\/strong> \u00fcnitelerin ise, <strong>2026-2027 y\u0131l\u0131nda<\/strong> devreye al\u0131nmas\u0131 planlan\u0131yor.<\/p>\n<p>Daha yeni olan <strong>Xudapu NGS projesi<\/strong> ise, Liaoning eyaletinin <strong>Huludao \u015fehri<\/strong>nde yer al\u0131yor. Santralin 3\u2019\u00fcnc\u00fc ve 4\u2019\u00fcnc\u00fc \u00fcnitelerinin in\u015faat\u0131 <strong>Rus<\/strong> ve <strong>\u00c7in<\/strong> taraflar\u0131 aras\u0131nda 2019 y\u0131l\u0131nda imzalanan bir dizi anla\u015fma kapsam\u0131nda y\u00fcr\u00fct\u00fclecek. \u00dcnitelerin <strong>2027-2028 d\u00f6neminde<\/strong> hizmete girmesi planlan\u0131yor.<\/p>\n<p><strong>VVER-1200 reakt\u00f6rleri<\/strong> <strong>T\u00fcrkiye<\/strong> ve <strong>\u00c7in\u2019in<\/strong> yan\u0131 s\u0131ra,<strong> Finlandiya, Banglade\u015f<\/strong> ve<strong> Belarus<\/strong> gibi \u00fclkelerde de kullan\u0131l\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Rusya ve \u00c7in aras\u0131nda n\u00fckleer alanda geli\u015ftirilen i\u015fbirli\u011fi t\u00fcm h\u0131z\u0131yla devam ediyor. Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019ni (NGS) de in\u015fa eden Rusya Devlet [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":135214,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[69230,69285,90678,52369,90679],"views":353,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/135210"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=135210"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/135210\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/135214"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=135210"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=135210"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=135210"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}