{"id":135125,"date":"2021-05-19T20:38:20","date_gmt":"2021-05-19T17:38:20","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=135125"},"modified":"2021-05-19T20:39:15","modified_gmt":"2021-05-19T17:39:15","slug":"tskb-gunes-enerjisi-santrallerine-200-milyon-dolar-finansman-saglayacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tskb-gunes-enerjisi-santrallerine-200-milyon-dolar-finansman-saglayacak\/","title":{"rendered":"(Turkish) &#8217;TSKB&#8217; G\u00fcne\u015f Enerjisi Santrallerine 200 Milyon Dolar Finansman Sa\u011flayacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/135125\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Yakla\u015f\u0131k 20 y\u0131la yak\u0131n bir s\u00fcredir finansman sa\u011flad\u0131\u011f\u0131 330 yenilenebilir enerji projesinin 162 adedi GES projelerinden olu\u015fan TSKB, \u015fimdiye dek 250 MW kurulu g\u00fcce toplam 250 milyon dolar\u0131n \u00fczerinde kaynak sa\u011flad\u0131. \u00d6n\u00fcm\u00fczdeki birka\u00e7 y\u0131l i\u00e7inde bu alandaki yat\u0131r\u0131mlara yo\u011funla\u015fmay\u0131 planlayan banka, 200 milyon dolar tutar\u0131nda GES finansman\u0131 sa\u011flamay\u0131 hedefliyor.<\/strong><\/h1>\n<p>2002 y\u0131l\u0131ndan g\u00fcn\u00fcm\u00fcze T\u00fcrkiye\u2019nin yenilenebilir enerji alan\u0131nda ger\u00e7ekle\u015ftirilen projelerini destekleyen <strong>T\u00fcrkiye S\u0131nai Kalk\u0131nma Bankas\u0131 (TSKB)<\/strong>, <strong>g\u00fcne\u015f enerjisi santrallerine (GES)<\/strong> sa\u011flad\u0131\u011f\u0131 finansman olanaklar\u0131yla, sekt\u00f6r\u00fcnde \u00f6rnek te\u015fkil etmeyi s\u00fcrd\u00fcr\u00fcyor.<\/p>\n<p><strong><img loading=\"lazy\" class=\"alignright wp-image-135128\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/tskb-gunes-enerjisi-santrallerine-200-milyon-dolar-finansman-saglayacak-2.jpg\" alt=\"\" width=\"290\" height=\"435\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/tskb-gunes-enerjisi-santrallerine-200-milyon-dolar-finansman-saglayacak-2.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/tskb-gunes-enerjisi-santrallerine-200-milyon-dolar-finansman-saglayacak-2-200x300.jpg 200w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/tskb-gunes-enerjisi-santrallerine-200-milyon-dolar-finansman-saglayacak-2-267x400.jpg 267w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/tskb-gunes-enerjisi-santrallerine-200-milyon-dolar-finansman-saglayacak-2-33x50.jpg 33w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/tskb-gunes-enerjisi-santrallerine-200-milyon-dolar-finansman-saglayacak-2-500x750.jpg 500w\" sizes=\"(max-width: 290px) 100vw, 290px\" \/>TSKB\u2019nin finanse etti\u011fi<\/strong> toplam <strong>330<\/strong> yenilenebilir enerji projesinin <strong>162<\/strong> tanesini <strong>GES projeleri<\/strong> olu\u015fturuyor. Toplam finanse edilen GES kurulu g\u00fcc\u00fc <strong>250 MW<\/strong>\u2019\u0131n \u00fczerinde yer al\u0131rken, bu projelere sa\u011flanan<strong> toplam finansman miktar\u0131<\/strong> ise<strong> 250 milyon dolar\u0131n<\/strong> \u00fczerinde hesaplan\u0131yor. \u00d6n\u00fcm\u00fczdeki <strong>2-3 y\u0131l<\/strong> boyunca <strong>GES alan\u0131ndaki yat\u0131r\u0131mlara yo\u011funla\u015fmay\u0131<\/strong> planlayan TSKB, bu alana<strong> 200 milyon dolar<\/strong> tutar\u0131nda finansman sa\u011flamay\u0131 hedefliyor.<\/p>\n<p><strong>\u00c7at\u0131 \u00fcst\u00fc GES<\/strong>\u2019lerin finansman\u0131nda; m\u00fc\u015fterilerine sundu\u011fu finansal kiralama hizmetleri ile de ayr\u0131\u015fan TSKB, projelere y\u00f6nelik <strong>uzun vadeli kredileriyle<\/strong> \u00f6ne \u00e7\u0131k\u0131yor.<\/p>\n<p>TSKB portf\u00f6y\u00fc i\u00e7indeki <strong>GES projeleri<\/strong>nin adetlerinde art\u0131\u015f olaca\u011f\u0131n\u0131 beklediklerini s\u00f6yleyen TSKB Kurumsal Bankac\u0131l\u0131k Sat\u0131\u015f M\u00fcd\u00fcr\u00fc <strong>Volkan Karaben<\/strong>, \u00fclkenin toplam kurulu g\u00fcc\u00fc i\u00e7inde de TSKB taraf\u0131ndan finanse edilen <strong>GES pay\u0131n\u0131n<\/strong> ciddi oranda artabilece\u011fine dikkat \u00e7ekti. T\u00fcrkiye\u2019nin her co\u011frafyas\u0131ndaki <strong>GES projelerini finanse etmenin<\/strong> yan\u0131 s\u0131ra uzman m\u00fchendislik ekibinin yat\u0131r\u0131m dan\u0131\u015fmanl\u0131\u011f\u0131yla projelerin <strong>sa\u011fl\u0131kl\u0131<\/strong> ve <strong>verimli \u015fekilde<\/strong> hayata ge\u00e7mesini sa\u011flad\u0131klar\u0131n\u0131 belirten Karaben, \u00f6n\u00fcm\u00fczdeki d\u00f6nemde kurulumu h\u0131zl\u0131 ve kolay yap\u0131labilen, <strong>yo\u011fun mesai<\/strong> veya <strong>i\u015fg\u00fcc\u00fc<\/strong> gerektirmeyen <strong>GES yat\u0131r\u0131mlar\u0131na taleplerin<\/strong> artaca\u011f\u0131na i\u015faret etti.<\/p>\n<h2><strong>\u0130\u00e7 t\u00fcketime y\u00f6nelik \u00e7at\u0131 ve zemin \u00fcst\u00fc GES yat\u0131r\u0131mlar\u0131na talep art\u0131\u015f\u0131 bekleniyor<\/strong><\/h2>\n<p>Mevcut enerji projelerinde <strong>hibrit \u00fcretim<\/strong> kapsam\u0131nda, <strong>konut<\/strong> ve<strong> sanayi tesislerinin \u00e7at\u0131lar\u0131<\/strong> ile <strong>sanayi tesisi arazilerinin<\/strong> \u00fczerine kurulacak<strong> GES yat\u0131r\u0131mlar\u0131na<\/strong> y\u00f6nelik talebin yo\u011funla\u015ft\u0131\u011f\u0131n\u0131n alt\u0131n\u0131 \u00e7izen Karaben, g\u00fcne\u015f alan\u0131nda da yat\u0131r\u0131mc\u0131s\u0131n\u0131n ve kullan\u0131c\u0131s\u0131n\u0131n farkl\u0131 firmalar oldu\u011fu, gelir payla\u015f\u0131m\u0131na dayanan <strong>Yap-\u0130\u015flet-Devret i\u015f modelleri<\/strong>nin artarak devam edece\u011fini ifade etti. TSKB\u2019nin s\u00fcrd\u00fcr\u00fclebilir finansman alan\u0131ndaki uzmanl\u0131\u011f\u0131n\u0131n alt\u0131n\u0131 \u00e7izen <strong>Volkan Karaben<\/strong>: <em>\u201c\u00dclkemizin d\u00fc\u015f\u00fck karbonlu ekonomiye ge\u00e7i\u015finde kilit \u00f6neme sahip <strong>GES projelerinin finansman ihtiya\u00e7lar\u0131na<\/strong> do\u011fru ve etkin kaynak modelleri sunmak \u00f6nceliklerimiz aras\u0131nda yer al\u0131yor. \u00a0Proje finansman\u0131 modelimiz projelerin kendi yaratm\u0131\u015f oldu\u011fu veya i\u00e7 t\u00fcketime y\u00f6nelik projelerde tasarruf edilen fonlar ile d\u0131\u015far\u0131dan herhangi bir <strong>finansal destek<\/strong> almadan kapal\u0131 devre \u015fekilde<strong> kredi \u00f6demesini<\/strong> m\u00fcmk\u00fcn k\u0131l\u0131yor. Yurtd\u0131\u015f\u0131ndan temin etti\u011fimiz kaynaklar\u0131n vadeleri uzun oldu\u011fu i\u00e7in<strong> GES projeleri<\/strong>ne anapara \u00f6demesiz d\u00f6nemleri de olan uzun vadeli \u00f6deme planlar\u0131 sunuyoruz. 2022 y\u0131l\u0131nda daha da artmas\u0131n\u0131 bekledi\u011fimiz <strong>GES yat\u0131r\u0131mlar\u0131n\u0131n finansmanlar\u0131<\/strong>na h\u0131z kesmeden devam etmeyi ve \u00f6n\u00fcm\u00fczdeki <strong>2-3 sene<\/strong> i\u00e7erisinde <strong>200 milyon dolar<\/strong>\u0131n \u00fczerinde ilave finansman sunmay\u0131 planl\u0131yoruz\u201d<\/em> dedi.<\/p>\n<p><strong>Sanayi tipi \u00e7at\u0131 \u00fcst\u00fc GES<\/strong>\u2019lerin a\u011f\u0131rl\u0131kl\u0131 olarak firmalar\u0131n mevcut fabrikalar\u0131n\u0131n \u00e7at\u0131lar\u0131, <strong>arazi tipi GES<\/strong>\u2019lerin de fabrika arazileri \u00fczerlerine tesis edildi\u011fini ve bu <strong>projelerin finansman\u0131<\/strong> i\u00e7in \u00e7o\u011fu zaman fabrikalar\u0131n ve \u00fczerlerinde bulunduklar\u0131 arazilerin teminatlar\u0131n\u0131n al\u0131namad\u0131\u011f\u0131n\u0131 belirten Karaben s\u00f6zlerine <span style=\"text-decoration: underline;\">\u015f\u00f6yle devam etti:<\/span> <em>\u201cGenelde <strong>\u00e7at\u0131 \u00fcst\u00fc<\/strong> veya<strong> zemin \u00fczeri GES yat\u0131r\u0131mlar\u0131<\/strong>n\u0131n finansman\u0131 ya finansal kiralama yap\u0131larak ya da<strong> GES<\/strong> kapsam\u0131ndaki <strong>ekipmanlar teminat<\/strong> olarak al\u0131narak yap\u0131labiliyor. TSKB olarak b\u00fcnyemizde finansal kiralama yapabildi\u011fimiz i\u00e7in<strong> \u00e7at\u0131 \u00fcst\u00fc GES projeleri<\/strong>nde m\u00fc\u015fterilerimize bu \u00e7\u00f6z\u00fcmleri de sunabilmekteyiz. Finansman olanaklar\u0131n\u0131n yan\u0131 s\u0131ra<strong>\u00a0teknik fizibilite, teknoloji analizi, ya\u015fam d\u00f6ng\u00fcs\u00fc<\/strong> maliyet analizi gibi alanlarda sundu\u011fumuz dan\u0131\u015fmanl\u0131k hizmetleriyle de <strong>\u00e7at\u0131<\/strong> ve<strong> zemin \u00fcst\u00fc GES yat\u0131r\u0131mlar\u0131<\/strong>nda yetkin bir i\u015f orta\u011f\u0131 olmaya devam edece\u011fiz.\u201d<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Yakla\u015f\u0131k 20 y\u0131la yak\u0131n bir s\u00fcredir finansman sa\u011flad\u0131\u011f\u0131 330 yenilenebilir enerji projesinin 162 adedi GES projelerinden olu\u015fan TSKB, \u015fimdiye dek 250 MW [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":135127,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[24218,58016,90618,28351,20026,59214,90617,90612,90615,84213,70925,79930,90613,90614,90616,10290],"views":125,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/135125"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=135125"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/135125\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/135127"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=135125"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=135125"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=135125"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}