{"id":13478,"date":"2013-07-28T23:27:46","date_gmt":"2013-07-28T20:27:46","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=13478"},"modified":"2013-07-28T23:27:46","modified_gmt":"2013-07-28T20:27:46","slug":"9-ilde-kamulastirma-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/9-ilde-kamulastirma-yapilacak\/","title":{"rendered":"(Turkish) 9 \u0130lde Kamula\u015ft\u0131rma Yap\u0131lacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/13478\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Enerji projeleri \u00e7er\u00e7evesinde Tekirda\u011f, Ardahan, Kastamonu, Giresun, Trabzon, Bal\u0131kesir, Karab\u00fck, Ayd\u0131n ve K\u0131r\u0131kkale&#8217;de kamula\u015ft\u0131rma yap\u0131lacak.<\/strong><\/p>\n<p>Bakanlar Kurulu, enerji projeleri \u00e7er\u00e7evesinde Tekirda\u011f, Ardahan, Kastamonu, Giresun, Trabzon, Bal\u0131kesir, Karab\u00fck, Ayd\u0131n ve K\u0131r\u0131kkale&#8217;de acele kamula\u015ft\u0131rma yap\u0131lmas\u0131na karar verdi. Gaziantep&#8217;in \u015eahinbey \u0130l\u00e7esi Tepeba\u015f\u0131, Ey\u00fcpo\u011flu ve Bey Mahalleleri s\u0131n\u0131rlar\u0131 i\u00e7erisinde bulunan alan yenileme alan\u0131 olarak belirlerken, Kahramanmara\u015f&#8217;\u0131n Merkez \u0130l\u00e7esi Menderes Mahallesi, Ankara&#8217;n\u0131n Sincan \u0130l\u00e7esi Polatlar Mahallesi, Gaziantep&#8217;in \u015eahinbey \u0130l\u00e7esi Tepeba\u015f\u0131 ve Kozanl\u0131 Mahalleleri s\u0131n\u0131rlar\u0131 i\u00e7inde bulunan alanlar\u0131 ise kentsel d\u00f6n\u00fc\u015f\u00fcm ve geli\u015fim proje alan\u0131 ilan etti.<\/p>\n<p>Baz\u0131 alanlarda kamula\u015ft\u0131rma yap\u0131lmas\u0131 ve baz\u0131 alanlar\u0131n kentsel d\u00f6n\u00fc\u015f\u00fcm ve geli\u015fim b\u00f6lgeleri ilan edilmesiyle ilgili Bakanlar Kurulu Kararlar\u0131 Resmi Gazete&#8217;de yay\u0131mland\u0131. Kararlara g\u00f6re 6446 say\u0131l\u0131 Elektrik Piyasas\u0131 Kanunu kapsam\u0131nda imzalanan ba\u011flant\u0131 anla\u015fmas\u0131 uyar\u0131nca tesis edilecek &#8220;154 kV Balabanl\u0131 RES TM &#8211; Tegesan TM Enerji \u0130letim Hatt\u0131 Projesi&#8221; kapsam\u0131nda Muratl\u0131 ve \u00c7orlu g\u00fczergah\u0131ndaki baz\u0131 ta\u015f\u0131nmazlar, direk yerlerinin m\u00fclkiyet \u015feklinde, iletken sal\u0131n\u0131m gabarisinin ise irtifak hakk\u0131 kurulmak suretiyle T\u00fcrkiye Elektrik \u0130letim\u2008Anonim\u2008\u015eirketi Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc&#8217;nce kamula\u015ft\u0131r\u0131lacak.<\/p>\n<p><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/9-ilde-kamulastirma-yapilacak.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-13479\" title=\"9-ilde-kamulastirma-yapilacak\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/9-ilde-kamulastirma-yapilacak-300x181.jpg\" alt=\"\" width=\"300\" height=\"181\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/9-ilde-kamulastirma-yapilacak-300x181.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/9-ilde-kamulastirma-yapilacak-80x48.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/9-ilde-kamulastirma-yapilacak.jpg 480w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>Kastamonu&#8217;nun Seydiler \u0130l\u00e7esi&#8217;nde tesis edilecek do\u011falgaz da\u011f\u0131t\u0131m sistemi, Ardahan&#8217;\u0131n Merkez, \u00c7\u0131ld\u0131r ve Hanak il\u00e7elerinde tesis edilecek K\u00f6ro\u011flu Hidroelektrik Santrali, Giresun&#8217;un Bulancak \u0130l\u00e7esi&#8217;nde tesis edilecek \u00c7i\u011fdem Reg\u00fclat\u00f6r\u00fc ve Hidroelektrik Santrali ile Ge\u00e7ici Kovanl\u0131k TM aras\u0131nda enerji nakil hatt\u0131, Trabzon&#8217;un \u00c7aykara \u0130l\u00e7esi&#8217;nde tesis edilecek olan Uzung\u00f6l I Reg\u00fclat\u00f6r\u00fc ve Hidroelektrik Santrali&#8217;nin yap\u0131m\u0131 amac\u0131yla baz\u0131 ta\u015f\u0131nmazlar\u0131n Hazine ad\u0131na tescil edilmek \u00fczere Enerji Piyasas\u0131 D\u00fczenleme Kurumu (EPDK) taraf\u0131ndan acele kamula\u015ft\u0131r\u0131lmas\u0131 kararla\u015ft\u0131r\u0131ld\u0131.<\/p>\n<p>EPDK taraf\u0131ndan acele kamula\u015ft\u0131rma yap\u0131lacak projeler alanlar \u015f\u00f6yle :<\/p>\n<p>&#8220;Bal\u0131kesir&#8217;in Kepsut \u0130l\u00e7esi&#8217;nde tesis edilecek olan poyraz r\u00fczgar enerji santralinin yap\u0131m\u0131 amac\u0131yla baz\u0131 ta\u015f\u0131nmazlar, Karab\u00fck&#8217;\u00fcn Eskipazar \u0130l\u00e7esi&#8217;nde Tesis Edilecek \u0130kiler Hidroelektrik Santrali, Trabzon&#8217;un Arsin \u0130l\u00e7esi&#8217;nde Tesis Edilecek Yanbolu Reg\u00fclat\u00f6r\u00fc ve Hidroelektrik Santrali, Ayd\u0131n&#8217;\u0131n Germencik ve \u0130ncirliova \u0130l\u00e7elerinde tesis edilecek Efe Jeotermal Elektrik Santrali, Karab\u00fck&#8217;\u00fcn Eskipazar \u0130l\u00e7esi&#8217;nde tesis edilecek \u0130kiler Hidroelektrik Santrali, Kastamonu&#8217;nun Seydiler \u0130l\u00e7esi&#8217;nde Tesis Edilecek Do\u011falgaz Da\u011f\u0131t\u0131m Sistemi&#8217;nin yap\u0131m\u0131 amac\u0131yla baz\u0131 ta\u015f\u0131nmazlar kamula\u015ft\u0131r\u0131lacak .&#8221;<\/p>\n<p>Bakanlar Kurulu, K\u0131r\u0131kkale-Keskin Ceritm\u00fcminli G\u00f6leti Sulamas\u0131 \u0130n\u015faat\u0131&#8217;n\u0131n yap\u0131m\u0131 amac\u0131yla baz\u0131 ta\u015f\u0131nmazlar\u0131n Devlet Su \u0130\u015fleri Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc taraf\u0131ndan acele kamula\u015ft\u0131r\u0131lmas\u0131na karar verdi.<\/p>\n<p>Bakanlar Kurulu, Gaziantep&#8217;in, \u015eahinbey \u0130l\u00e7esi, Tepeba\u015f\u0131, Ey\u00fcpo\u011flu ve Bey Mahalleleri s\u0131n\u0131rlar\u0131 i\u00e7erisinde bulunan alan yenileme alan\u0131 olarak, Kahramanmara\u015f&#8217;\u0131n Merkez \u0130l\u00e7e Menderes Mahallesi s\u0131n\u0131rlar\u0131 i\u00e7erisinde bulunan alan\u0131 kentsel d\u00f6n\u00fc\u015f\u00fcm ve geli\u015fim proje alan\u0131, Ankara&#8217;n\u0131n Sincan \u0130l\u00e7esi Polatlar Mahallesi&#8217;nde bulunan alan\u0131 kentsel d\u00f6n\u00fc\u015f\u00fcm ve geli\u015fim proje alan\u0131, Gaziantep&#8217;in \u015eahinbey \u0130l\u00e7esi Tepeba\u015f\u0131 ve Kozanl\u0131 Mahalleleri s\u0131n\u0131rlar\u0131 i\u00e7erisinde bulunan alan\u0131 kentsel d\u00f6n\u00fc\u015f\u00fcm ve geli\u015fim proje alan\u0131 ilan etti.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.energyworld.com.tr\/root.vol?title=9-ilde-kamulastirma-yapilacak&amp;exec=page&amp;nid=560096\" target=\"_blank\">Energy World<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Enerji projeleri \u00e7er\u00e7evesinde Tekirda\u011f, Ardahan, Kastamonu, Giresun, Trabzon, Bal\u0131kesir, Karab\u00fck, Ayd\u0131n ve K\u0131r\u0131kkale&#8217;de kamula\u015ft\u0131rma yap\u0131lacak. Bakanlar Kurulu, enerji projeleri \u00e7er\u00e7evesinde Tekirda\u011f, Ardahan, Kastamonu, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":13479,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53,47,50],"tags":[92,7216,63,67,7215,1306,750,35370,1090,3860,474,69,16],"views":1166,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13478"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=13478"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13478\/revisions"}],"predecessor-version":[{"id":13480,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13478\/revisions\/13480"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/13479"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=13478"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=13478"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=13478"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}