{"id":134412,"date":"2021-05-05T10:50:49","date_gmt":"2021-05-05T07:50:49","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=134412"},"modified":"2021-05-05T10:51:17","modified_gmt":"2021-05-05T07:51:17","slug":"tuv-austria-turk-akkuyu-nukleer-santralindeki-calismalarini-surduruyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tuv-austria-turk-akkuyu-nukleer-santralindeki-calismalarini-surduruyor\/","title":{"rendered":"(Turkish) &#8217;T\u00dcV Austria Turk&#8217; Akkuyu N\u00fckleer Santralindeki \u00c7al\u0131\u015fmalar\u0131n\u0131 S\u00fcrd\u00fcr\u00fcyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/134412\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Akkuyu N\u00fckleer Santrali&#8217;nin \u00e7al\u0131\u015fmalar\u0131na devam ediyor. Yap\u0131m\u0131na 2017 y\u0131l\u0131nda Mersin G\u00fclnar Akkuyu b\u00f6lgesinde ba\u015flanan projede kullan\u0131lan ekipmanlar\u0131n; \u00fcretim, montaj ve kurulum s\u00fcre\u00e7lerinde ve in\u015faat yaz\u0131 denetimlerinde, N\u00fckleer D\u00fczenleme Kurumu (NDK) ve resmi teknik destek kurulu\u015fu N\u00dcTED A.\u015e.&#8217;ye veren \u015firket, di\u011fer n\u00fckleer santraller projelerinde elde edilmi\u015f tecr\u00fcbe, bilgi ve hizmet becerileri T\u00fcrkiye&#8217;ye aktar\u0131yor. <\/strong><\/h1>\n<p>T\u00fcrkiye&#8217;de <strong>g\u00f6zetim, denetim, e\u011fitim <\/strong>ve<strong> sertifikaland\u0131rma<\/strong> alan\u0131nda faaliyet g\u00f6steren <strong>T\u00dcV Avusturya T\u00fcrk<\/strong>, 30 ki\u015filik <strong>m\u00fchendis<\/strong> ve <strong>teknik<\/strong> ekibiyle Akkuyu N\u00fckleer Santrali&#8217;nde <strong>NDK<\/strong> ve <strong>N\u00dcTED<\/strong> ad\u0131na;<strong> TSE<\/strong> ve<strong> TecnaTom<\/strong> ile birlikte kontroller <img loading=\"lazy\" class=\"alignright wp-image-134415\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/tuv-austria-turk-akkuyu-nukleer-santralindeki-calismalarini-surduruyor-1.jpg\" alt=\"\" width=\"300\" height=\"450\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/tuv-austria-turk-akkuyu-nukleer-santralindeki-calismalarini-surduruyor-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/tuv-austria-turk-akkuyu-nukleer-santralindeki-calismalarini-surduruyor-1-200x300.jpg 200w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/tuv-austria-turk-akkuyu-nukleer-santralindeki-calismalarini-surduruyor-1-267x400.jpg 267w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/tuv-austria-turk-akkuyu-nukleer-santralindeki-calismalarini-surduruyor-1-33x50.jpg 33w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/05\/tuv-austria-turk-akkuyu-nukleer-santralindeki-calismalarini-surduruyor-1-500x750.jpg 500w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>ger\u00e7ekle\u015ftiriyor.<\/p>\n<h2><strong>Sekt\u00f6re \u00f6zel e\u011fitimler de veriyor<\/strong><\/h2>\n<p>Y\u0131lda <strong>35 milyar kilovatsaat elektrik<\/strong> \u00fcretecek, T\u00fcrkiye&#8217;nin ilk n\u00fckleer santrali \u00e7al\u0131\u015fanlar\u0131na e\u011fitim hizmetleri de veren \u015firket, n\u00fckleer sekt\u00f6rde <strong>proje y\u00f6neticileri, uzman<\/strong> ve<strong> denet\u00e7iler<\/strong> ile <strong>proje ekipleri<\/strong> kurarak, know-how transferi ger\u00e7ekle\u015ftiriyor. \u015eirket ayr\u0131ca,<strong> N\u00fckleer D\u00fczenleme Kurumu (NDK)<\/strong> ve ilgili payda\u015flara n\u00fckleer teknoloji ve <strong>sekt\u00f6re \u00f6zel e\u011fitimler<\/strong> de veriyor. <strong>20 milyar dolarl\u0131k<\/strong> maliyet,<strong> 4 bin 800 megavatl\u0131k<\/strong> tam kapasite ile hizmet verdi\u011finde \u0130stanbul&#8217;un enerji ihtiyac\u0131n\u0131n odas\u0131, T\u00fcrkiye&#8217;nin ise <strong>% 10<\/strong>&#8216;unu kar\u015f\u0131layacak santralin<strong> 2023 y\u0131l\u0131nda<\/strong> ilk reakt\u00f6r\u00fcn\u00fcn a\u00e7\u0131lmas\u0131 planlan\u0131yor.<\/p>\n<h2><strong>&#8220;N\u00fckleer g\u00fcvenli\u011fin kapsam\u0131nda ve s\u00fcreklili\u011fine katk\u0131 sa\u011fl\u0131yoruz&#8221;<\/strong><\/h2>\n<p><strong>T\u00dcV AUSTRIA<\/strong> olarak <strong>Romanya<\/strong> ve <strong>\u0130spanya&#8217;da<\/strong> n\u00fckleer enerji tesislerinin in\u015faat ve i\u015fletme d\u00f6nemlerinin \u00e7e\u015fitli a\u015famalar\u0131nda geni\u015f bir yelpazede hizmet verdiklerini belirten\u00a0 <strong>T\u00dcV Avusturya T\u00fcrk \u00dclke M\u00fcd\u00fcr\u00fc Yank\u0131 \u00dcnal,\u00a0<\/strong> <em>\u201c<strong>Akkuyu N\u00fckleer Santrali<\/strong>, \u00fclkemizin enerji ihtiyac\u0131n\u0131n kar\u015f\u0131l\u0131\u011f\u0131ndaki olduk\u00e7a \u00f6nemli bir proje olacak. \u00dclkemizin ilk n\u00fckleeri olmas\u0131 <strong>n\u00fckleer g\u00fcvenlik<\/strong> ve <strong>s\u00fcreklili\u011finin<\/strong> 3&#8217;\u00fcnc\u00fc hususunda ayr\u0131ca hassasiyet g\u00f6stermekteyiz. Projeye, pandemi d\u00f6neminde\u00a0 <strong>T\u00fcrk Standartlar\u0131 Enstit\u00fcs\u00fc (TSE)<\/strong> ve<strong> Tecnatom firmas\u0131<\/strong> ile i\u015f birli\u011fi yapmak i\u00e7in girmi\u015f bulunmakta olup bu \u015fartlar alt\u0131nda t\u00fcm \u00fcretim, in\u015faat, kurulum ve montaj s\u00fcre\u00e7lerinin kontrollerini, teknolojinin \u00fcreticisi\u00a0<strong>Rusya standartlar\u0131na<\/strong> g\u00f6re ger\u00e7ekle\u015ftirmekteyiz. N\u00fckleere \u00f6zel olmayan siteler i\u00e7in \u00fclkemizde kullan\u0131lan ya da kabul edilen ulusal ve <strong>uluslararas\u0131 standartlarda denetimler<\/strong> ger\u00e7ekle\u015ftirilmektedir. Projede bug\u00fcne kadar Rusya Federasyonu Dava olmak \u00fczere <strong>Fransa, Fransa<\/strong> gibi ta\u015f\u0131tlar ger\u00e7ekle\u015ftirdik \u201d\u00a0<\/em>\u015feklinde konu\u015ftu.<\/p>\n<h2><strong>&#8220;G\u00fc\u00e7l\u00fc bir know-how transferi ger\u00e7ekle\u015ftiriyoruz&#8221;<\/strong><\/h2>\n<p>Projede, Rusya&#8217;daki <strong>Novovoronezh NPP santrali<\/strong>nin referans al\u0131nt\u0131s\u0131 vurgulayan\u00a0<strong>\u00dcnal,<\/strong>\u00a0<em>\u201c\u00dclkemiz i\u00e7in b\u00f6ylesine \u00f6nemli bir projede yer almaktan b\u00fcy\u00fck bir mutluluk ve gurur duyuyoruz. Projede kullan\u0131lan ekipmanlar\u0131n; <strong>\u00fcretiminden montaj\u0131na, kurulum s\u00fcre\u00e7lerinden e\u011fitimlere<\/strong> kadar geni\u015f hizmet \u00e7e\u015fitlili\u011fiyle yer al\u0131yoruz. Bug\u00fcne kadar <strong>N\u00fckleer G\u00fcvenlik<\/strong> ve <strong>G\u00fcvenlik K\u00fclt\u00fcr\u00fc<\/strong> olmak \u00fczere ki\u015fisel e\u011fitimleri ger\u00e7ekle\u015ftirilmi\u015f olup bir\u00e7ok <strong>teknik alt ba\u015fl\u0131kta<\/strong> da <strong>e\u011fitimler planlanan<\/strong> takvim \u00e7er\u00e7evesinde devam etmektedir. <strong>N\u00fckleer D\u00fczenleme Kurumu<\/strong> ve <strong>N\u00dcTED<\/strong> ad\u0131na ger\u00e7ekle\u015ftirdi\u011fimiz denetimlerde ayr\u0131ca talip <strong>TUV Avusturya Grubu<\/strong>&#8216;nda ilgili di\u011fer \u015firketlerimizin tecr\u00fcbesinde de destek al\u0131yoruz. Bunun i\u00e7in T\u00fcrkiye i\u00e7in ilk olan \u00f6nemli bir projede g\u00fc\u00e7l\u00fc bir <strong>know-how transferi<\/strong> ger\u00e7ekle\u015ftiriyoruz.\u201d<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Akkuyu N\u00fckleer Santrali&#8217;nin \u00e7al\u0131\u015fmalar\u0131na devam ediyor. Yap\u0131m\u0131na 2017 y\u0131l\u0131nda Mersin G\u00fclnar Akkuyu b\u00f6lgesinde ba\u015flanan projede kullan\u0131lan ekipmanlar\u0131n; \u00fcretim, montaj ve kurulum s\u00fcre\u00e7lerinde [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":134417,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[40552,5070,90104,90108,64574,53348,90105,90106,54722,68469,90107,90109],"views":248,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/134412"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=134412"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/134412\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/134417"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=134412"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=134412"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=134412"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}