{"id":13436,"date":"2013-07-26T10:14:48","date_gmt":"2013-07-26T07:14:48","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=13436"},"modified":"2013-07-26T10:14:48","modified_gmt":"2013-07-26T07:14:48","slug":"zorlu-enerji-pakistanda-elektrik-satisina-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/zorlu-enerji-pakistanda-elektrik-satisina-basladi\/","title":{"rendered":"(Turkish) Zorlu Enerji, Pakistan`da Elektrik Sat\u0131\u015f\u0131na Ba\u015flad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/13436\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/zorlu-enerji-avrupa-komisyonu-odul.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-9508\" title=\"zorlu-enerji-pakistanda-elektrik-satisina-basladi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/zorlu-enerji-avrupa-komisyonu-odul-300x183.jpg\" alt=\"\" width=\"300\" height=\"183\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/zorlu-enerji-avrupa-komisyonu-odul-300x183.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/zorlu-enerji-avrupa-komisyonu-odul-80x48.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/zorlu-enerji-avrupa-komisyonu-odul.jpg 490w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>Zorlu Enerji Grubu`nun Pakistan`daki r\u00fczgar enerjisi santrali, testleri tamamlad\u0131 ve elektrik sat\u0131\u015f\u0131na ba\u015flad\u0131.\u00a0<\/strong><\/p>\n<p>Zorlu Enerji`den yap\u0131lan duyuruya g\u00f6re, \u015eirket`in y\u00fczde 100 ba\u011fl\u0131 ortakl\u0131\u011f\u0131 olan Zorlu Enerji Pakistan Limited \u015eirketi`nin Pakistan`\u0131n Jhimpir b\u00f6lgesinde in\u015fa etti\u011fi 56.4 MW kurulu g\u00fcce sahip r\u00fczgar enerjisi santralinin g\u00fcvenilirlik testleri ba\u015far\u0131yla tamamland\u0131. Santral bug\u00fcn itibariyle Pakistan Ulusal \u0130letim ve Da\u011f\u0131t\u0131m \u015eirketi`ne (NTDC) ticari elektrik sat\u0131\u015f\u0131na ba\u015flad\u0131.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/zorlu-enerji-pakistanda-elektrik-satisina-basladi_4351.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Zorlu Enerji Grubu`nun Pakistan`daki r\u00fczgar enerjisi santrali, testleri tamamlad\u0131 ve elektrik sat\u0131\u015f\u0131na ba\u015flad\u0131.\u00a0 Zorlu Enerji`den yap\u0131lan duyuruya g\u00f6re, \u015eirket`in y\u00fczde 100 ba\u011fl\u0131 ortakl\u0131\u011f\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":9508,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[1462,63,67,165,7195,1315,7194,474,231,344],"views":506,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13436"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=13436"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13436\/revisions"}],"predecessor-version":[{"id":13438,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13436\/revisions\/13438"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/9508"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=13436"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=13436"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=13436"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}