{"id":13423,"date":"2013-07-26T09:30:42","date_gmt":"2013-07-26T06:30:42","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=13423"},"modified":"2013-07-26T09:30:42","modified_gmt":"2013-07-26T06:30:42","slug":"kiroba-enerjinin-20mw-gucundeki-resi-devreye-giriyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kiroba-enerjinin-20mw-gucundeki-resi-devreye-giriyor\/","title":{"rendered":"(Turkish) K\u0131roba Enerji\u2019nin 20MW G\u00fcc\u00fcndeki RES\u2019i Devreye Giriyor&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/13423\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>K\u0131roba Enerji\u2019nin Ayd\u0131n ilindeki M<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/turkiye-ruzgar-enerji-si-santrali-res-kurulu-gucu.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-9220\" title=\"kiroba-enerjinin-20mwlik-madranbaba-resi-devreye-giriyor\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/turkiye-ruzgar-enerji-si-santrali-res-kurulu-gucu-300x205.jpg\" alt=\"\" width=\"300\" height=\"205\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/turkiye-ruzgar-enerji-si-santrali-res-kurulu-gucu-300x205.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/turkiye-ruzgar-enerji-si-santrali-res-kurulu-gucu-72x50.jpg 72w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/04\/turkiye-ruzgar-enerji-si-santrali-res-kurulu-gucu.jpg 430w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>adranbaba r\u00fczgar santrali \u00f6n\u00fcm\u00fczde ki hafta faaliyete ba\u015flayacak.\u00a0<\/strong><\/p>\n<div>GAMESA G90 modeli 2MW kapasitede 10 adet t\u00fcrbinden olu\u015fan tesis, Ayd\u0131n \u00c7ine il\u00e7esinin 1600 metre rak\u0131ml\u0131 Madran da\u011f\u0131na kuruldu.<\/div>\n<div><\/div>\n<div>Santralin y\u0131lda yakla\u015f\u0131k 60 Milyon kW \u00fcretim ger\u00e7ekle\u015ftirmesi ve yakla\u015f\u0131k 38.000 ton\/y\u0131l karbon emisyonu azalt\u0131m\u0131 sa\u011flamas\u0131 hedefleniyor.<\/div>\n<div><\/div>\n<div>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/07\/25\/kiroba-enerjinin-20mwlik-madranbaba-resi-devreye-giriyor\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.K\u0131roba Enerji\u2019nin Ayd\u0131n ilindeki Madranbaba r\u00fczgar santrali \u00f6n\u00fcm\u00fczde ki hafta faaliyete ba\u015flayacak.\u00a0 GAMESA G90 modeli 2MW kapasitede 10 adet t\u00fcrbinden olu\u015fan tesis, Ayd\u0131n [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":9220,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[7179,63,67,165,7181,7178,7180,474,69,16,231],"views":1224,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13423"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=13423"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13423\/revisions"}],"predecessor-version":[{"id":13424,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13423\/revisions\/13424"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/9220"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=13423"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=13423"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=13423"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}