{"id":134062,"date":"2021-04-29T12:28:54","date_gmt":"2021-04-29T09:28:54","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=134062"},"modified":"2021-04-29T12:29:13","modified_gmt":"2021-04-29T09:29:13","slug":"yeka-ges-3-mini-yeka-yarismalarinin-1inci-bolumu-tamamlandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yeka-ges-3-mini-yeka-yarismalarinin-1inci-bolumu-tamamlandi\/","title":{"rendered":"(Turkish) YEKA GES 3 (Mini YEKA) Yar\u0131\u015fmalar\u0131&#8217;n\u0131n 1&#8217;inci B\u00f6l\u00fcm\u00fc Tamamland\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/134062\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>36 ilde g\u00fcne\u015f enerjisinden elektrik \u00fcretimine y\u00f6nelik 74 yar\u0131\u015fman\u0131n 1&#8217;inci <img loading=\"lazy\" class=\"alignright wp-image-134064\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/yeka-ges-3-mini-yeka-yarismalarinin-1inci-bolumu-tamamlandi.jpg\" alt=\"\" width=\"320\" height=\"189\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/yeka-ges-3-mini-yeka-yarismalarinin-1inci-bolumu-tamamlandi.jpg 856w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/yeka-ges-3-mini-yeka-yarismalarinin-1inci-bolumu-tamamlandi-300x177.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/yeka-ges-3-mini-yeka-yarismalarinin-1inci-bolumu-tamamlandi-768x454.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/yeka-ges-3-mini-yeka-yarismalarinin-1inci-bolumu-tamamlandi-500x296.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/yeka-ges-3-mini-yeka-yarismalarinin-1inci-bolumu-tamamlandi-80x47.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>b\u00f6l\u00fcm\u00fc 26 Nisan 2021\u2019de yap\u0131lan ihalelerle tamamland\u0131.<\/strong><\/h1>\n<p><strong>1000 MW<\/strong>\u2019l\u0131k <strong>Mini YEKA yar\u0131\u015fmalar\u0131<\/strong> ile <strong>yenilenebilir enerji yat\u0131r\u0131mlar\u0131<\/strong> hayata ge\u00e7mi\u015f olacak.<\/p>\n<p><strong>G\u00fcne\u015f Enerjisine Dayal\u0131 Yenilenebilir Enerji Kaynak Alanlar\u0131<\/strong> ve <strong>Ba\u011flant\u0131 Kapasiteleri<\/strong>nin <strong>Tahsisine \u0130li\u015fkin Yar\u0131\u015fma \u0130lan\u0131na<\/strong> y\u00f6nelik <strong>29 Nisan 2021<\/strong> sonras\u0131ndaki yar\u0131\u015fmalar, tam kapanmayla birlikte <strong>17 May\u0131s 2021\u2019den<\/strong> sonraya ertelendi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. 36 ilde g\u00fcne\u015f enerjisinden elektrik \u00fcretimine y\u00f6nelik 74 yar\u0131\u015fman\u0131n 1&#8217;inci b\u00f6l\u00fcm\u00fc 26 Nisan 2021\u2019de yap\u0131lan ihalelerle tamamland\u0131. 1000 MW\u2019l\u0131k Mini YEKA yar\u0131\u015fmalar\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":134064,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[53157,12474,72259,54979,1245],"views":97,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/134062"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=134062"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/134062\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/134064"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=134062"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=134062"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=134062"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}