{"id":133926,"date":"2021-04-27T11:17:12","date_gmt":"2021-04-27T08:17:12","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=133926"},"modified":"2021-04-27T11:18:21","modified_gmt":"2021-04-27T08:18:21","slug":"mini-yeka-yarismalari-26-nisanda-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/mini-yeka-yarismalari-26-nisanda-basladi\/","title":{"rendered":"Mini YEKA Competitions Started on April 26!"},"content":{"rendered":"<p><\/p>\n<h1><strong>While the first part of the Mini YEKA competition for solar energy in 36 provinces starts with the tenders held on April 26, 2021, the 1000 MW Mini YEKA competitions also play an important role in spreading renewable energy investments to the base.<\/strong><\/h1>\n<h2><strong>YEKA GES-3 Ad\u0131yaman-1 15 MW competition results:<img loading=\"lazy\" class=\"alignright wp-image-133928\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/mini-yeka-yarismalari-26-nisanda-basladi.jpg\" alt=\"\" width=\"340\" height=\"202\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/mini-yeka-yarismalari-26-nisanda-basladi.jpg 850w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/mini-yeka-yarismalari-26-nisanda-basladi-300x179.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/mini-yeka-yarismalari-26-nisanda-basladi-768x457.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/mini-yeka-yarismalari-26-nisanda-basladi-500x298.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/mini-yeka-yarismalari-26-nisanda-basladi-80x48.jpg 80w\" sizes=\"(max-width: 340px) 100vw, 340px\" \/><\/strong><\/h2>\n<p>Murel 28,7 Kr\/kwh,<br \/>\nEksim 29.8,<br \/>\n\u00c7imya 20.9,<br \/>\n\u00d6zg\u00fc\u00e7l\u00fc 34.7,<br \/>\nHMN 27.0,<br \/>\nEgesa 30.8,<br \/>\nEVO 32.2,<br \/>\nY\u0131lvet 30.0,<br \/>\nMira\u00e7 30.1,<br \/>\nG\u00fcn G\u00fcne\u015f 30.8<\/p>\n<h3><strong><br \/>\n\u00c7imya won the competition with an offer of 20.9 kuru\u015f \/ kwh. (today&#8217;s exchange rate is 2.48 USDcent \/ kWh)<\/strong><\/h3>\n<h2><strong>YEKA GES-3 Ad\u0131yaman-2 15 MW competition results:<\/strong><\/h2>\n<p>Murel 28,7<br \/>\nNivak 31,5<br \/>\nKarahan 31,0<br \/>\nEksim 29,8<br \/>\n\u0130bik 27,0<br \/>\nKon-tek 23,9<br \/>\nHMN 31,0<br \/>\nMira\u00e7 Yol 29,2<br \/>\nAca Enerji 31,4<br \/>\nAldo 33,0<br \/>\nG\u00fcn G\u00fcne\u015f 29,9<\/p>\n<h3><strong>As a result of the auction, Kontek won the competition with 22 kr\u015f \/ kwh. (2.6 cent \/ kWh)<br \/>\n<\/strong><\/h3>\n<h2><strong>YEKA GES-3 A\u011fr\u0131-1 15 MW competition results:<br \/>\n<\/strong><\/h2>\n<p>Cihanal 34.8<br \/>\nAk\u00e7ada\u011f 33.7<br \/>\nPYS 32.5<br \/>\nHMN 29.5<\/p>\n<h3><strong>As a result of the auction, PYS won the competition with 28.9 kr\u015f \/ kwh. (3.44 cent \/ kWh)<br \/>\n<\/strong><\/h3>\n<h3><strong>YEKA GES-3 A\u011fr\u0131-2 15 MW Competition envelope results:<br \/>\n<\/strong><\/h3>\n<p>Binres 32.4<br \/>\nKonelsis 34.0<br \/>\nCihanal 34.0<br \/>\nHMN 33.5<br \/>\nSolako\u011flu 29.8<br \/>\nFYS 33.5<br \/>\nAk\u00e7ada\u011f 33.9<\/p>\n<h2><strong>As a result of the auction, he won the second competition in A\u011fr\u0131 with the FYS 28.2 kr\u015f \/ kWh. (3.35 cent \/ kWh)<br \/>\n<\/strong><\/h2>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>While the first part of the Mini YEKA competition for solar energy in 36 provinces starts with the tenders held on April 26, 2021, the 1000 MW Mini YEKA competitions also play an important role in spreading renewable energy investments to the base. YEKA GES-3 Ad\u0131yaman-1 15 MW competition results: Murel 28,7 Kr\/kwh, Eksim 29.8, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":133928,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[66250,43219,5070,79148,23311,53157,89744,89745,48949,72259,51211,54979],"views":245,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/133926"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=133926"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/133926\/revisions"}],"predecessor-version":[{"id":133930,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/133926\/revisions\/133930"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/133928"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=133926"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=133926"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=133926"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}