{"id":133627,"date":"2021-04-22T09:30:15","date_gmt":"2021-04-22T06:30:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=133627"},"modified":"2021-04-22T09:30:53","modified_gmt":"2021-04-22T06:30:53","slug":"yeka-ges-3e-yonelik-yarisma-takvimi-aciklandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yeka-ges-3e-yonelik-yarisma-takvimi-aciklandi\/","title":{"rendered":"(Turkish) &#8217;YEKA GES-3&#8217;e Y\u00f6nelik Yar\u0131\u015fma Takvimi A\u00e7\u0131kland\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/133627\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 taraf\u0131ndan \u201cG\u00fcne\u015f Enerjisine Dayal\u0131 Yenilenebilir Enerji Kaynak Alanlar\u0131 ve Ba\u011flant\u0131 Kapasitelerinin Tahsisine \u0130li\u015fkin Yar\u0131\u015fma \u0130lan\u0131\u201d kapsam\u0131nda 26\/04\/2021-07\/05\/2021 tarihleri aras\u0131nda yap\u0131lacak 46 adet YEKA GES-3 Yar\u0131\u015fmas\u0131na ili\u015fkin duyuru yay\u0131mland\u0131.<\/strong><\/h1>\n<h2><strong>YEKA GES-3 YARI\u015eMALARINA \u0130L\u0130\u015eK\u0130N DUYURU<\/strong><\/h2>\n<p><strong>03\/07\/2020<\/strong> tarih ve <strong>31174<\/strong> say\u0131l\u0131 <strong>Resmi Gazete\u2019de<\/strong> yay\u0131mlanan <strong>G\u00fcne\u015f Enerjisine Dayal\u0131 <img loading=\"lazy\" class=\"alignright wp-image-133629\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/46-adet-yeka-ges-3-icin-yarisma-takvimi-aciklandi.jpg\" alt=\"\" width=\"320\" height=\"231\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/46-adet-yeka-ges-3-icin-yarisma-takvimi-aciklandi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/46-adet-yeka-ges-3-icin-yarisma-takvimi-aciklandi-300x217.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/46-adet-yeka-ges-3-icin-yarisma-takvimi-aciklandi-500x361.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/46-adet-yeka-ges-3-icin-yarisma-takvimi-aciklandi-69x50.jpg 69w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Yenilenebilir Enerji Kaynak Alanlar\u0131<\/strong> ve <strong>Ba\u011flant\u0131 Kapasitelerinin Tahsisine \u0130li\u015fkin Yar\u0131\u015fma \u0130lan\u0131<\/strong> kapsam\u0131nda<strong> 26\/04\/2021-07\/05\/2021<\/strong> tarihleri aras\u0131nda ger\u00e7ekle\u015ftirilecek <strong>46 adet<\/strong> <strong>YEKA GES-3 Yar\u0131\u015fmas\u0131na<\/strong> ili\u015fkin takvim a\u015fa\u011f\u0131da yer almaktad\u0131r.<\/p>\n<p>S\u00f6z konusu <strong>yar\u0131\u015fmalara<\/strong>, <strong>ba\u015fvuru sahiplerinin<\/strong> sadece ilgili<strong> yetkili temsilcileri<\/strong>nin (en fazla 2 ki\u015fi olmak kayd\u0131yla) kat\u0131labilece\u011fi hususunun bilinmesi, yetkili temsilcilerin <strong>imza sirk\u00fcleri<\/strong> ve<strong> yetki belgesi<\/strong> \/ <strong>vek\u00e2letnameleri<\/strong> ile <strong>\u015firket ka\u015felerini <\/strong>haz\u0131r bulundurmalar\u0131, <strong>Covid-19 tedbirleri<\/strong> kapsam\u0131nda kamp\u00fcse giri\u015fte <strong>HES kodlar\u0131n\u0131n<\/strong> haz\u0131r bulundurulmas\u0131 ve <strong>Maske-Mesafe<\/strong> ve <strong>Hijyen<\/strong> ba\u015fta olmak \u00fczere <strong>tedbirlere uyum<\/strong> konusunda <strong>gerekli hassasiyetin g\u00f6sterilmesi<\/strong> \u00f6nem arz etmektedir.<\/p>\n<p>Di\u011fer\u00a0<strong>28 adet<\/strong>\u00a0yar\u0131\u015fmaya ili\u015fkin <strong>takvim<\/strong> ise <strong>bilahare<\/strong> duyurulacakt\u0131r.<\/p>\n<h3 style=\"text-align: center;\"><strong>Yar\u0131\u015fma Komisyonu<\/strong><\/h3>\n<p style=\"text-align: center;\"><strong>21\/04\/2021<\/strong><\/p>\n<p style=\"text-align: center;\"><strong>YARI\u015eMA YER\u0130: <\/strong>T.C. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 E-Blok \/ Konferans Salonu Nasuh Akar Mahallesi, T\u00fcrkoca\u011f\u0131 Caddesi No: 2 06500 \u00c7ankaya\/ANKARA<\/p>\n<p><strong>Duyurunun Tam Metni ve Yar\u0131\u015fma Detaylar\u0131 \u0130\u00e7in\u00a0<a href=\"https:\/\/enerjiapi.enerji.gov.tr\/Media\/Dizin\/BHIM\/tr\/Duyurular\/\/Yar%C4%B1%C5%9Fma%20Duyurusu-1_202104211524.pdf\" target=\"_blank\" rel=\"nofollow noopener\">TIKLAYIN &gt;&gt;&gt;<\/a><\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 taraf\u0131ndan \u201cG\u00fcne\u015f Enerjisine Dayal\u0131 Yenilenebilir Enerji Kaynak Alanlar\u0131 ve Ba\u011flant\u0131 Kapasitelerinin Tahsisine \u0130li\u015fkin Yar\u0131\u015fma \u0130lan\u0131\u201d kapsam\u0131nda 26\/04\/2021-07\/05\/2021 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":133629,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[79563,5070,80711,89526,53157,54979,61203,75066,61363],"views":117,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/133627"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=133627"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/133627\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/133629"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=133627"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=133627"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=133627"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}