{"id":133273,"date":"2021-04-15T13:04:55","date_gmt":"2021-04-15T10:04:55","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=133273"},"modified":"2021-04-15T13:05:22","modified_gmt":"2021-04-15T10:05:22","slug":"petrol-zengini-suudi-arabistanda-yuzunu-gunese-dondu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/petrol-zengini-suudi-arabistanda-yuzunu-gunese-dondu\/","title":{"rendered":"(Turkish) Petrol Zengini Suudi Arabistan&#8217;da Y\u00fcz\u00fcn\u00fc \u2018G\u00fcne\u015fe\u2019 D\u00f6nd\u00fc!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/133273\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Ulusal Yenilenebilir Enerji Plan\u0131 \u00e7er\u00e7evesinde, 2023&#8217;e kadar yenilenebilir enerjide 10.000 MW kapasite meydana <img loading=\"lazy\" class=\"alignright wp-image-133275\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/petrol-zengini-suudi-arabistanda-yuzunu-gunese-cevirdi-2.jpg\" alt=\"\" width=\"320\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/petrol-zengini-suudi-arabistanda-yuzunu-gunese-cevirdi-2.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/petrol-zengini-suudi-arabistanda-yuzunu-gunese-cevirdi-2-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/petrol-zengini-suudi-arabistanda-yuzunu-gunese-cevirdi-2-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/petrol-zengini-suudi-arabistanda-yuzunu-gunese-cevirdi-2-80x45.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>getirme hedefi olan Suudi Arabistan taraf\u0131ndan yenilenebilir enerji sekt\u00f6r\u00fcn\u00fcn geli\u015fimine y\u00f6nelik 30 &#8211; 50 milyar dolar aras\u0131nda yat\u0131r\u0131m yap\u0131lmas\u0131 planlan\u0131yor.<\/h1>\n<p><strong>Suudi Arabistan, ABD<\/strong> ve <strong>Rusya\u2019yla<\/strong> birlikte k\u00fcresel petrol \u00fcretimi miktar\u0131 s\u0131ralamas\u0131nda<strong> ilk 3\u2019te<\/strong> yer al\u0131rken \u00fclkede, ge\u00e7en hafta ger\u00e7ekle\u015ftirilen\u00a0<strong>600 MW<\/strong> kapasiteye sahip\u00a0<strong>g\u00fcne\u015f santrali projesi<\/strong>ne y\u00f6nelik kilovatsaat ba\u015f\u0131na <strong>0,0104 sent\/dolar<\/strong> ile d\u00fcnyan\u0131n <strong>en d\u00fc\u015f\u00fck fiyat teklifi<\/strong> verilmi\u015f olundu.<\/p>\n<p>Ge\u00e7ti\u011fimiz hafta, Suudi Arabistan\u2019\u0131n <strong>300 MW<\/strong> kapasiteli b\u00fcy\u00fck \u00f6l\u00e7ekli ilk <strong>g\u00fcne\u015f enerjisi santrali (GES)<\/strong> projesi <strong>Sakaka GES<\/strong> tam kapasite ile devreye al\u0131n\u0131rken\u00a0toplam da kurulu g\u00fcc\u00fc\u00a0<strong>2 bin 970 megavat<\/strong> olan <strong>7<\/strong> <em>g\u00fcne\u015f enerjisi santrali projesine<\/em> y\u00f6nelikte <strong>20<\/strong> ve <strong>25 y\u0131l<\/strong> de\u011fi\u015fen s\u00fcreler i\u00e7in <strong>al\u0131m anla\u015fmalar\u0131 da<\/strong> imzaland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Ulusal Yenilenebilir Enerji Plan\u0131 \u00e7er\u00e7evesinde, 2023&#8217;e kadar yenilenebilir enerjide 10.000 MW kapasite meydana getirme hedefi olan Suudi Arabistan taraf\u0131ndan yenilenebilir enerji sekt\u00f6r\u00fcn\u00fcn [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":133275,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[5070,23311,53157,89264,57125,82263,54979,89265],"views":99,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/133273"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=133273"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/133273\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/133275"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=133273"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=133273"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=133273"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}