{"id":133209,"date":"2021-04-14T16:52:07","date_gmt":"2021-04-14T13:52:07","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=133209"},"modified":"2021-04-15T19:36:09","modified_gmt":"2021-04-15T16:36:09","slug":"guyad-yenilenebilir-enerji-de-mevcut-durumunu-degerlendirdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/guyad-yenilenebilir-enerji-de-mevcut-durumunu-degerlendirdi\/","title":{"rendered":"(Turkish) &#8217;G\u00dcYAD&#8217; Yenilenebilir Enerji&#8217;nin Mevcut Durumunu De\u011ferlendirdi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/133209\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Y<strong>enilenebilir Enerji Yat\u0131r\u0131mc\u0131lar\u0131 Derne\u011fi G\u00dcYAD, yenilenebilir enerji sekt\u00f6r\u00fcn\u00fcn mevcut g\u00fcndemini \u00e7evrimi\u00e7i bas\u0131n sohbet toplant\u0131s\u0131nda enerji edit\u00f6rlerine de\u011ferlendirdi.<\/strong><\/h1>\n<p>G\u00dcYAD Ba\u015fkan\u0131<strong> Cem \u00d6zk\u00f6k<\/strong>\u2019\u00fcn yapt\u0131\u011f\u0131 \u00f6ne \u00e7\u0131kan <span style=\"text-decoration: underline;\">a\u00e7\u0131klamalar \u015fu \u015fekildedir:<\/span><\/p>\n<p><em><strong>&#8220;1000 MW g\u00fcne\u015f YEKA<\/strong>\u2019s\u0131 ihale edildi. Bunlar\u0131n Nisan ay\u0131 i\u00e7inde tekliflerin a\u00e7\u0131lmas\u0131 bekleniyor, en<img loading=\"lazy\" class=\"size-medium wp-image-133216 alignright\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/unnamed-1-300x185.jpg\" alt=\"\" width=\"300\" height=\"185\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/unnamed-1-300x185.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/unnamed-1-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/unnamed-1.jpg 320w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> d\u00fc\u015f\u00fck 5 teklif kendi i\u00e7inde yar\u0131\u015facak. <strong>1.000 MW&#8217;a 9.400 MW <\/strong>teklif geldi, \u00e7ok ciddi rekabet olacak demek. Bu esnada T\u00fcrkiye\u2019de ciddi bir d\u00f6viz art\u0131\u015f\u0131 oldu \u00e7e\u015fitli sebeplerden dolay\u0131. <strong>Faizler<\/strong> de artt\u0131. Bakanl\u0131\u011fa \u00f6nerimiz \u201c\u015fartnamedeki <strong>eskalasyon oran\u0131n\u0131n<\/strong> ba\u015flang\u0131\u00e7 tarihini teklif verdi\u011fimiz tarih olarak alal\u0131m; a\u00e7\u0131k eksiltme yapaca\u011f\u0131m\u0131z <strong>fiyat eskalasyonlu fiyat<\/strong> olsun\u201d \u015feklinde. Bu y\u00f6nde dilek\u00e7emizi Bakanl\u0131\u011fa sunduk. De\u011ferlendirmelerini bekliyoruz.<\/em><\/p>\n<p><em>Daha \u00f6nce g\u00f6rd\u00fck ki <strong>r\u00fczgarda teklifler<\/strong> topland\u0131, yar\u0131\u015fmalar yap\u0131ld\u0131 ve bu<\/em><em>nlar\u0131n neticesinde bir\u00e7ok firman\u0131n verdi\u011fi teklif y\u00fcz\u00fcnden fizib\u0131l olmad\u0131 projeleri<\/em><em>\u00a0ve yapamad\u0131lar. Bu sebeple bu <strong>projelerin kapasitesi birka\u00e7 sene at\u0131l<\/strong> olarak kald\u0131 ve \u015fu anda bu<strong> 1.000 MW r\u00fczgar YEKA<\/strong> ihalesi g\u00fcndemde. Bu da muhtemelen <strong>Nisan ay\u0131 i\u00e7inde<\/strong> ilan edilecek. Sekt\u00f6r bunu bekliyor. San\u0131yorum buna <strong>6-7<\/strong> ay s\u00fcre verilip teklif toplanacakt\u0131r&#8221;<\/em><\/p>\n<h2><strong>G\u00fcne\u015f YEKA&#8217;lar\u0131 Hakk\u0131nda Bilgilendirme<\/strong><\/h2>\n<p>G\u00fcne\u015f YEKA ihalesi i\u00e7in verilmi\u015f olan<strong> 9.440 MW<\/strong>\u2019l\u0131k teklifin i\u00e7inde t\u00fcm teklifler <strong>35 kuru\u015fun<\/strong> alt\u0131nda \u00e7\u00fcnk\u00fc tavan fiyat <strong>35 kuru\u015f<\/strong>. Ekonomik dalgalanmalar ve hem kurdaki hem de faizdeki art\u0131\u015flar nedeniyle <strong>bizim yat\u0131r\u0131mc\u0131lar<\/strong> olarak bu konudaki talebimiz <strong>zarf\u0131 verdi\u011fimiz tarihten<\/strong> itibaren <strong>eskalasyon<\/strong> uygulamam\u0131zd\u0131r. Bu <strong>YEKA ihalesi<\/strong>nden sonra<strong> 2&#8217;inci bir ihale<\/strong> daha yap\u0131labilmesi i\u00e7in daha stabil bir ortamda olmam\u0131z gerekti\u011fine y\u00f6nelik a\u00e7\u0131klamalarda bulundu.<\/p>\n<p>Yay\u0131na Alan: Ferhat AKBABA \u2013 Enerji Sistemleri M\u00fchendisi \u2013\u00a0<a href=\"mailto:akbabaferhat749@gmail.com\" target=\"_blank\" rel=\"nofollow noopener\">ferhat.akbaba@enerjigazetesi.ist<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Yenilenebilir Enerji Yat\u0131r\u0131mc\u0131lar\u0131 Derne\u011fi G\u00dcYAD, yenilenebilir enerji sekt\u00f6r\u00fcn\u00fcn mevcut g\u00fcndemini \u00e7evrimi\u00e7i bas\u0131n sohbet toplant\u0131s\u0131nda enerji edit\u00f6rlerine de\u011ferlendirdi. G\u00dcYAD Ba\u015fkan\u0131 Cem \u00d6zk\u00f6k\u2019\u00fcn yapt\u0131\u011f\u0131 [&hellip;]<\/p>\n","protected":false},"author":17,"featured_media":133214,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[13,53157,44351,40914,89226,16,78094,34798,33219,105],"views":99,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/133209"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=133209"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/133209\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/133214"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=133209"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=133209"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=133209"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}