{"id":133190,"date":"2021-04-14T15:14:46","date_gmt":"2021-04-14T12:14:46","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=133190"},"modified":"2021-04-14T15:21:08","modified_gmt":"2021-04-14T12:21:08","slug":"3k-demir-celik-sanayinin-fabrika-catisina-gunes-santrali-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/3k-demir-celik-sanayinin-fabrika-catisina-gunes-santrali-kurulacak\/","title":{"rendered":"(Turkish) 3K Demir \u00c7elik Sanayi\u2019nin Fabrika \u00c7at\u0131s\u0131na G\u00fcne\u015f Santrali Kurulacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/133190\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Kayseri Organize Sanayi B\u00f6lgesinde yer alan, T\u00fcrkiye\u2019nin \u00f6nemli kurulu\u015flar\u0131ndan <img loading=\"lazy\" class=\"alignright wp-image-133192\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/3k-demir-celik-sanayinin-fabrikasina-catisina-gunes-santrali-kurulacak.jpg\" alt=\"\" width=\"320\" height=\"257\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/3k-demir-celik-sanayinin-fabrikasina-catisina-gunes-santrali-kurulacak.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/3k-demir-celik-sanayinin-fabrikasina-catisina-gunes-santrali-kurulacak-300x241.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/3k-demir-celik-sanayinin-fabrikasina-catisina-gunes-santrali-kurulacak-498x400.jpg 498w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/3k-demir-celik-sanayinin-fabrikasina-catisina-gunes-santrali-kurulacak-62x50.jpg 62w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/3k-demir-celik-sanayinin-fabrikasina-catisina-gunes-santrali-kurulacak-500x402.jpg 500w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>3K Demir \u00c7elik Sanayi Ticaret Ltd.&#8217;nin fabrikas\u0131na 1.650kWp g\u00fcc\u00fcnde \u00e7at\u0131 \u00fczeri GES,\u00a0<\/strong><strong>ASUN\u0130M T\u00fcrkiye taraf\u0131ndan\u00a0<\/strong><strong>kurulacak.<\/strong><\/h1>\n<p>Yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, t\u00fcm <strong>projelendirme<\/strong> ve <strong>m\u00fchendislik<\/strong> hizmetleri, <strong>g\u00f6lge analizleri<\/strong>, <strong>\u00fcretim sim\u00fclasyonlar\u0131, optimizasyonlar<\/strong> ASUN\u0130M\u2019in Avrupa\u2019daki m\u00fchendislik departman\u0131 taraf\u0131ndan en g\u00fcncel teknikler ve ASUN\u0130M\u2019e<strong> \u00f6zel yaz\u0131l\u0131mlar<\/strong> kullan\u0131larak yap\u0131l\u0131rken <strong>fabrikan\u0131n \u00e7at\u0131 yap\u0131s\u0131<\/strong>ndan dolay\u0131 <strong>yatay panel dizilimi<\/strong> yap\u0131larak, \u00e7at\u0131da <strong>daha fazla panel yerle\u015fimi<\/strong> yap\u0131lmas\u0131 planlan\u0131yor.<\/p>\n<p>Santralde; <strong>3710<\/strong> adet<strong> Phono Solar g\u00fcne\u015f panelleri<\/strong>, <strong>SMA marka inverterlar, Studer<\/strong> marka \u00f6zel solar kablolar kullan\u0131lacak olup santralin bak\u0131m onar\u0131m faaliyetleri ASUN\u0130M\u2019in i\u015ftirak firmas\u0131 olan <strong>MAXIMA Enerji<\/strong> taraf\u0131ndan y\u00fcr\u00fct\u00fclecek.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Kayseri Organize Sanayi B\u00f6lgesinde yer alan, T\u00fcrkiye\u2019nin \u00f6nemli kurulu\u015flar\u0131ndan 3K Demir \u00c7elik Sanayi Ticaret Ltd.&#8217;nin fabrikas\u0131na 1.650kWp g\u00fcc\u00fcnde \u00e7at\u0131 \u00fczeri GES,\u00a0ASUN\u0130M T\u00fcrkiye [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":133192,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[89211,89210,58009,5070,23311,89209,21886,53157,36099,54979],"views":177,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/133190"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=133190"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/133190\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/133192"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=133190"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=133190"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=133190"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}