{"id":133058,"date":"2021-04-12T14:54:10","date_gmt":"2021-04-12T11:54:10","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=133058"},"modified":"2021-04-12T14:54:57","modified_gmt":"2021-04-12T11:54:57","slug":"odasin-urfadaki-santrali-ozbekistan-a-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/odasin-urfadaki-santrali-ozbekistan-a-kurulacak\/","title":{"rendered":"(Turkish) &#8217;Oda\u015f&#8217;\u0131n Urfa&#8217;daki Santrali \u00d6zbekistan&#8217;a Kurulacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/133058\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Oda\u015f Elektrik \u00dcretim Sanayi Ticaret A.\u015e taraf\u0131ndan 174 MW do\u011fal gaz kombine \u00e7evirim santrali kurmaya y\u00f6nelik \u00d6zbekistan <img loading=\"lazy\" class=\"alignright wp-image-133060\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/odas-in-sanliurfadaki-santrali-ozbekistanda-kurulacak.jpg\" alt=\"\" width=\"320\" height=\"206\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/odas-in-sanliurfadaki-santrali-ozbekistanda-kurulacak.jpg 604w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/odas-in-sanliurfadaki-santrali-ozbekistanda-kurulacak-300x193.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/odas-in-sanliurfadaki-santrali-ozbekistanda-kurulacak-500x321.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/odas-in-sanliurfadaki-santrali-ozbekistanda-kurulacak-78x50.jpg 78w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>h\u00fck\u00fcmeti ile anla\u015fma imzaland\u0131.<\/h1>\n<p><strong>Kamuyu Ayd\u0131nlatma Platformu<\/strong>&#8216;na <strong>(KAP)<\/strong> yap\u0131lan a\u00e7\u0131klamada <span style=\"text-decoration: underline;\">\u015fu bilgilere yer verildi:<\/span><\/p>\n<p><em>&#8221;\u00d6zbekistan s\u0131n\u0131rlar\u0131 i\u00e7erisinde faaliyet g\u00f6stermesi i\u00e7in kurulan i\u015ftirakimiz <strong>ODAS ENERJI CA LLC<\/strong> ile \u00d6zbekistan Enerji Bakanl\u0131\u011f\u0131&#8217;na ba\u011fl\u0131 <strong>NEGU (National Electric Grid of Uzbekistan)<\/strong> aras\u0131nda \u00d6zbekistan&#8217;da toplam <strong>174 MW<\/strong> kurulu g\u00fcce sahip bir <strong>do\u011fal gaz kombine \u00e7evrim santrali<\/strong> kurulmas\u0131 ve santralden \u00fcretilen elektri\u011fin <strong>dolara endeksli garantili sat\u0131\u015f fiyat\u0131<\/strong> ile <strong>25 y\u0131l<\/strong> s\u00fcresince sat\u0131\u015f\u0131n\u0131 i\u00e7eren bir anla\u015fma imzalanm\u0131\u015ft\u0131r. <strong>174 MW kurulu g\u00fcce<\/strong> sahip olacak santral yat\u0131r\u0131m\u0131n\u0131n <strong>140 MW<\/strong>&#8216;\u0131 Urfa&#8217;da yer alan <strong>do\u011fal gaz \u00e7evirim santrali<\/strong>mizin<strong> relokasyonu yap\u0131larak<\/strong> sa\u011flanacakt\u0131r. Bu sayede de <strong>enerji<\/strong> ve <strong>maden<\/strong> alan\u0131ndaki faaliyetlerimizden elde etti\u011fimiz gelirlerin tamam\u0131na yak\u0131n\u0131 <strong>dolara endeksli hale<\/strong> gelecektir. Santralin <strong>2021 y\u0131l\u0131 Kas\u0131m ay\u0131nda<\/strong> devreye girmesi hedeflenmekte olup, yeni i\u015fletmenin grubun<strong> 2021 y\u0131l\u0131 4. \u00e7eyrek FAV\u00d6K&#8217;\u00fcne<\/strong> de etkisini g\u00f6stermesi beklenmektedir.&#8221;<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Oda\u015f Elektrik \u00dcretim Sanayi Ticaret A.\u015e taraf\u0131ndan 174 MW do\u011fal gaz kombine \u00e7evirim santrali kurmaya y\u00f6nelik \u00d6zbekistan h\u00fck\u00fcmeti ile anla\u015fma imzaland\u0131. Kamuyu [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":133060,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[5287,54036,35376,60520,89118,89117],"views":340,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/133058"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=133058"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/133058\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/133060"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=133058"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=133058"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=133058"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}