{"id":132965,"date":"2021-04-11T12:22:27","date_gmt":"2021-04-11T09:22:27","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=132965"},"modified":"2021-04-11T12:23:26","modified_gmt":"2021-04-11T09:23:26","slug":"nordex-group-istanbul-resin-turbin-siparisini-aldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/nordex-group-istanbul-resin-turbin-siparisini-aldi\/","title":{"rendered":"(Turkish) &#8217;Nordex Group&#8217; \u0130stanbul RES\u2019in T\u00fcrbin Sipari\u015fini Ald\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/132965\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Caba Grup taraf\u0131ndan \u0130stanbul\u2019da kurulacak \u0130stanbul RES\u2019in 2&#8217;inci a\u015famas\u0131na y\u00f6nelik 187 MW r\u00fczgar t\u00fcrbini Nordex Group&#8217;a sipari\u015f <img loading=\"lazy\" class=\"alignright wp-image-132968\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/nordex-group-istanbul-resin-turbin-siparisini-aldi.jpg\" alt=\"\" width=\"320\" height=\"174\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/nordex-group-istanbul-resin-turbin-siparisini-aldi.jpg 460w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/nordex-group-istanbul-resin-turbin-siparisini-aldi-300x163.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/nordex-group-istanbul-resin-turbin-siparisini-aldi-80x43.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>verildi.<\/h1>\n<p>B\u00f6ylece <strong>Nordex Group<\/strong>, T\u00fcrkiye&#8217;den <strong>187 MW<\/strong> <em>r\u00fczgar t\u00fcrbini sipari\u015fi<\/em> al\u0131rken yap\u0131lan a\u00e7\u0131klamada ise, toplam <strong>211 MW<\/strong> kapasiteli <strong>\u0130stanbul R\u00fczgar Enerjisi Santrali<\/strong>\u2019nin<strong> 2&#8217;inci faz\u0131<\/strong>na y\u00f6nelik\u00a0<strong>Caba Grup<\/strong> taraf\u0131ndan verilen sipari\u015f<strong> Delta 400 serisi<\/strong>nden <strong>39<\/strong> adet<strong> N133\/4800 t\u00fcrbini<\/strong> ve <strong>15 y\u0131ll\u0131k bak\u0131m anla\u015fmas\u0131<\/strong>n\u0131 kapsad\u0131\u011f\u0131 ifadelerine yer verildi.<\/p>\n<p><strong>\u0130stanbul RES<\/strong>\u2019de kurulum bitti\u011finde <strong>44 r\u00fczgar t\u00fcrbini<\/strong>ne sahip <strong>211 MW<\/strong>&#8216;l\u0131k kapasiteye sahip T\u00fcrkiye&#8217;de yer alan <strong>lisansland\u0131r\u0131lm\u0131\u015f<\/strong> en b\u00fcy\u00fck proje konumunda yer alacak olup<strong> r\u00fczgar santralinin<\/strong> y\u0131lda yakla\u015f\u0131k <strong>850 GWh&#8217;<\/strong>lik enerji \u00fcretece\u011fi \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Caba Grup taraf\u0131ndan \u0130stanbul\u2019da kurulacak \u0130stanbul RES\u2019in 2&#8217;inci a\u015famas\u0131na y\u00f6nelik 187 MW r\u00fczgar t\u00fcrbini Nordex Group&#8217;a sipari\u015f verildi. B\u00f6ylece Nordex Group, T\u00fcrkiye&#8217;den [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":132968,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,52,50],"tags":[89065,89066,89064,12091,35002,53282,28483,13025],"views":244,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/132965"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=132965"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/132965\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/132968"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=132965"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=132965"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=132965"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}