{"id":132949,"date":"2021-04-11T11:33:41","date_gmt":"2021-04-11T08:33:41","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=132949"},"modified":"2021-04-11T11:35:46","modified_gmt":"2021-04-11T08:35:46","slug":"bedas-aedas-ve-cedas-iftardan-imsak-saatine-kadar-planli-kesinti-yapmayacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bedas-aedas-ve-cedas-iftardan-imsak-saatine-kadar-planli-kesinti-yapmayacak\/","title":{"rendered":"(Turkish) Beda\u015f, Aeda\u015f ve \u00c7eda\u015f \u0130ftardan \u0130msak Saatine Planl\u0131 Kesinti Yapmayacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/132949\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>T\u00fcrkiye\u2019de 3 b\u00f6lgede 8.4 milyondan fazla aboneye elektrik da\u011f\u0131t\u0131m hizmeti veren BEDA\u015e, AEDA\u015e ve \u00c7EDA\u015e \u00e7al\u0131\u015fma saatlerinde Ramazan ay\u0131na \u00f6zel d\u00fczenlemeye gitti. Buna g\u00f6re Ramazan boyunca \u0130stanbul Avrupa Yakas\u0131, Antalya, Burdur, Isparta, Sivas, Tokat ve Yozgat\u2019ta iftardan imsak saatine kadar planl\u0131 bak\u0131m, yat\u0131r\u0131m ve ba\u011flant\u0131 \u00e7al\u0131\u015fmalar\u0131 kaynakl\u0131 kesinti yap\u0131lmayacak.<\/strong><\/h1>\n<p>T\u00fcrkiye\u2019de <strong>3<\/strong> da\u011f\u0131t\u0131m b\u00f6lgesinde <strong>8.4 milyondan fazla<\/strong> abonesine hizmet veren <strong>Bo\u011fazi\u00e7i Elektrik <img loading=\"lazy\" class=\"alignright wp-image-132951\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/bedas-aedas-ve-cedas-iftardan-imsak-saatine-kadar-planli-kesinti-yapmayacak-2.jpg\" alt=\"\" width=\"320\" height=\"240\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/bedas-aedas-ve-cedas-iftardan-imsak-saatine-kadar-planli-kesinti-yapmayacak-2.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/bedas-aedas-ve-cedas-iftardan-imsak-saatine-kadar-planli-kesinti-yapmayacak-2-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/bedas-aedas-ve-cedas-iftardan-imsak-saatine-kadar-planli-kesinti-yapmayacak-2-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/bedas-aedas-ve-cedas-iftardan-imsak-saatine-kadar-planli-kesinti-yapmayacak-2-67x50.jpg 67w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>Da\u011f\u0131t\u0131m A.\u015e. (BEDA\u015e)<\/strong>,<strong> Akdeniz Elektrik Da\u011f\u0131t\u0131m A.\u015e. (AEDA\u015e)<\/strong> ve <strong>\u00c7aml\u0131bel Elektrik Da\u011f\u0131t\u0131m A.\u015e. (\u00c7EDA\u015e)<\/strong>, t\u00fcketicilerin Ramazan ay\u0131 boyunca enerjide s\u0131k\u0131nt\u0131 ya\u015famamas\u0131 i\u00e7in planl\u0131 kesinti saatlerinde yeni d\u00fczenlemeye gitti. Pandemi s\u00fcrecinde <strong>da\u011f\u0131t\u0131m \u015febekelerindeki<\/strong> kullan\u0131c\u0131lar\u0131n planl\u0131 elektrik kesintilerinden asgari d\u00fczeyde etkilenmesi i\u00e7in \u00e7al\u0131\u015fmalar\u0131n\u0131n <strong>% 80<\/strong>\u2019ini gece <strong>00.00-06.00<\/strong> aras\u0131nda ger\u00e7ekle\u015ftiren<strong> 3<\/strong> \u015firket, <strong>iftar<\/strong> ile <strong>sahur<\/strong> aras\u0131nda t\u00fcketicilere<strong> kesintisiz enerji hizmeti<\/strong> sunmak hedefiyle 13 Nisan 2021\u2019de ba\u015flayan <strong>Ramazan ay\u0131 boyunca<\/strong> bu saatler aras\u0131ndaki <strong>planl\u0131 kesintileri iptal etme karar\u0131<\/strong> ald\u0131.<\/p>\n<h2><strong>G\u00dcN \u0130\u00c7\u0130NDE KA\u00c7INILMAZ OLAN KES\u0130NT\u0130LER 17.00\u2019YE KADAR SONA ERECEK<\/strong><\/h2>\n<p>Bu ad\u0131m ile birlikte <strong>\u0130stanbul Avrupa Yakas\u0131, Antalya, Burdur, Isparta, Sivas, Tokat <\/strong>ve<strong> Yozgat\u2019ta<\/strong> Ramazan ay\u0131nda iftardan imsak saatlerine kadar planl\u0131 <strong>bak\u0131m, yat\u0131r\u0131m<\/strong> ve<strong> ba\u011flant\u0131 \u00e7al\u0131\u015fmalar\u0131<\/strong>ndan kaynaklanan kesintiler yap\u0131lmayacak. <strong>Mesken a\u011f\u0131rl\u0131kl\u0131 b\u00f6lgelerde<\/strong> ger\u00e7ekle\u015ftirilecek uygulama kapsam\u0131nda<strong> enerjinin g\u00fcvenli sa\u011flanmas\u0131<\/strong> i\u00e7in ger\u00e7ekle\u015ftirilmesi zorunlu \u00e7al\u0131\u015fmalar ise en ge\u00e7 saat <strong>17.00\u2019ye kadar<\/strong> tamamlanacak.<\/p>\n<h2><strong>PLANLI KES\u0130NT\u0130LER NEDEN YAPILIYOR?<\/strong><\/h2>\n<p>\u0130stanbul Avrupa Yakas\u0131\u2019nda <strong>5.2 milyon aboneye<\/strong> hizmet veren <em>BEDA\u015e<\/em>, <strong>Antalya, Burdur<\/strong> ve <strong>Isparta<\/strong>\u2019da<strong> 2.2 milyon abonesi<\/strong> olan <em>AEDA\u015e<\/em> ile<strong> Sivas, Tokat ve Yozgat<\/strong>\u2019ta 1 milyondan fazla abonesi bulunan <em>\u00c7EDA\u015e<\/em>,<strong> kaliteli<\/strong> ve <strong>kesintisiz enerji<\/strong> i\u00e7in ihtiya\u00e7 duyulan noktalara d\u00fczenli olarak bak\u0131m ve yat\u0131r\u0131m \u00e7al\u0131\u015fmalar\u0131 yap\u0131yor. <strong>Planl\u0131 bak\u0131m<\/strong> ve<strong> yat\u0131r\u0131m \u00e7al\u0131\u015fmalar\u0131<\/strong> s\u0131ras\u0131nda ise gerek abonelerin gerekse \u00e7al\u0131\u015fanlar\u0131n g\u00fcvenli\u011fi i\u00e7in elektri\u011fin bir s\u00fcre kesilmesi gerekiyor. <strong>Planl\u0131 bak\u0131m<\/strong> ve <strong>yat\u0131r\u0131m \u00e7al\u0131\u015fmalar\u0131<\/strong> nedeniyle g\u00fcndeme gelen kesintiler asl\u0131nda ileride daha b\u00fcy\u00fck \u00e7apl\u0131 kesintilerin \u00f6n\u00fcn\u00fc ge\u00e7mek, <strong>mesken, ticarethane<\/strong> ve <strong>sanayi abonelerinin<\/strong> talep etti\u011fi enerjiyi kar\u015f\u0131lamak i\u00e7in zorunluluk olarak g\u00fcndeme geliyor. Kesintinin olaca\u011f\u0131 b\u00f6lgelerdeki <strong>abonelere \u00f6nceden bilgilendirme<\/strong> yap\u0131l\u0131rken \u015fartlara g\u00f6re \u00e7al\u0131\u015fmalar\u0131n t\u00fcketicilerin<strong> enerjiye en az ihtiya\u00e7 duyaca\u011f\u0131 saatlerde<\/strong> yap\u0131lmas\u0131na gayret g\u00f6steriliyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019de 3 b\u00f6lgede 8.4 milyondan fazla aboneye elektrik da\u011f\u0131t\u0131m hizmeti veren BEDA\u015e, AEDA\u015e ve \u00c7EDA\u015e \u00e7al\u0131\u015fma saatlerinde Ramazan ay\u0131na \u00f6zel d\u00fczenlemeye gitti. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":132952,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[31338,5201,1506,4100,5179,52566,53114,52259,14167,14023,89057,89056,2437,9468,1197],"views":134,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/132949"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=132949"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/132949\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/132952"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=132949"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=132949"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=132949"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}