{"id":132745,"date":"2021-04-07T14:37:01","date_gmt":"2021-04-07T11:37:01","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=132745"},"modified":"2021-04-07T14:39:33","modified_gmt":"2021-04-07T11:39:33","slug":"sanko-holdingin-fabrikalari-enerjisini-gunesten-alacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sanko-holdingin-fabrikalari-enerjisini-gunesten-alacak\/","title":{"rendered":"(Turkish) Sanko Holding&#8217;in Fabrikalar\u0131 Enerjisini G\u00fcne\u015f&#8217;ten Alacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/132745\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>SANKO Holding taraf\u0131ndan fabrikalar\u0131n enerjisinin kar\u015f\u0131lanmas\u0131na y\u00f6nelik \u00e7at\u0131 \u00fcst\u00fc g\u00fcne\u015f enerjisi kurulumlar\u0131na ba\u015flanacak olunup bu \u00e7er\u00e7evede Gaziantep\u2019teki g\u00fcne\u015f paneli <img loading=\"lazy\" class=\"alignright wp-image-132749\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/sanko-holding-in-fabrikalari-enerjisini-gunesten-alacak.jpg\" alt=\"\" width=\"320\" height=\"210\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/sanko-holding-in-fabrikalari-enerjisini-gunesten-alacak.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/sanko-holding-in-fabrikalari-enerjisini-gunesten-alacak-300x197.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/sanko-holding-in-fabrikalari-enerjisini-gunesten-alacak-500x328.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/sanko-holding-in-fabrikalari-enerjisini-gunesten-alacak-76x50.jpg 76w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>\u00fcreticilerinden olan SolarT\u00fcrk ile i\u015fbirli\u011fi anla\u015fmas\u0131 yap\u0131ld\u0131.<\/h1>\n<p>SANKO Holding&#8217;in\u00a0<strong>\u00e7at\u0131 GES<\/strong>\u2019lerinde; <strong>SolarT\u00fcrk<\/strong>\u2019\u00fcn g\u00fcne\u015f paneli, <strong>Huawei<\/strong> invert\u00f6r, <strong>Prysmian<\/strong> marka <strong>kablo<\/strong> kullan\u0131lacak olup <strong>g\u00fcne\u015f panellerin yerle\u015fece\u011fi<\/strong> altyap\u0131 ise\u00a0<strong>GAP Galvaniz&#8217;den <\/strong>temin edilecek.\u00a0<strong>\u00c7at\u0131 \u00fcst\u00fc GES<\/strong>&#8216;lerin kurulaca\u011f\u0131 <strong>ba\u015fl\u0131ca tesisler<\/strong> ise\u00a0<strong>Bursa \u0130neg\u00f6l OSB<\/strong>\u2019de yer alan\u00a0<strong>Denim Fabrikas\u0131<\/strong>, <strong>Gaziantep<\/strong>\u2019teki <strong>S\u00fcper Film Tekstil Tesisleri<\/strong> ve <strong>Ad\u0131yaman<\/strong>\u2019da yer alan\u00a0<strong>Sanko fabrikalar\u0131<\/strong> olarak s\u0131ralan\u0131yor.<\/p>\n<p>SANKO Holding, yay\u0131mlanan <strong><a href=\"https:\/\/www.enerjigunlugu.net\/d\/file\/mw100-tr-2021-rapor.pdf\" target=\"_blank\" rel=\"nofollow noopener\">MW100 T\u00fcrkiye\u2019nin 100 B\u00fcy\u00fck Elektrik \u00dcreticisi &gt;&gt;&gt;<\/a><\/strong> listesinde <strong>794 MW&#8217;l\u0131k<\/strong>\u00a0kurulu g\u00fc\u00e7 ile <strong>25\u2019inci<\/strong> s\u0131rada yer al\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. SANKO Holding taraf\u0131ndan fabrikalar\u0131n enerjisinin kar\u015f\u0131lanmas\u0131na y\u00f6nelik \u00e7at\u0131 \u00fcst\u00fc g\u00fcne\u015f enerjisi kurulumlar\u0131na ba\u015flanacak olunup bu \u00e7er\u00e7evede Gaziantep\u2019teki g\u00fcne\u015f paneli \u00fcreticilerinden olan SolarT\u00fcrk [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":132749,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[88918,24218,88920,88921,53114,5070,53157,88919,12983,4491],"views":274,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/132745"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=132745"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/132745\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/132749"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=132745"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=132745"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=132745"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}