{"id":132617,"date":"2021-04-06T12:09:23","date_gmt":"2021-04-06T09:09:23","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=132617"},"modified":"2021-04-06T12:09:23","modified_gmt":"2021-04-06T09:09:23","slug":"akkuyu-ngs-nin-1inci-unitesi-icin-uretilen-bir-ekipman-daha-sahada","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngs-nin-1inci-unitesi-icin-uretilen-bir-ekipman-daha-sahada\/","title":{"rendered":"(Turkish) Akkuyu NGS&#8217;nin 1&#8217;inci \u00dcnitesi \u0130\u00e7in \u00dcretilen Bir Ekipman Daha Sahada!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/132617\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Akkuyu NGS\u2019nin buhar t\u00fcrbin \u00fcnitesinin ilk b\u00fcy\u00fck boyutlu bile\u015feni sahaya teslim edildi. 107 tondan fazla a\u011f\u0131rl\u0131\u011fa ve 12 metreden fazla uzunlu\u011fa sahip olan y\u00fcksek ve orta bas\u0131n\u00e7l\u0131 silindir rotoru, 20 Mart 2012\u2019de sahaya ula\u015ft\u0131.<\/h1>\n<p>Modern y\u00fcksek ve orta bas\u0131n\u00e7l\u0131 silindir kullan\u0131m\u0131, <strong>Akkuyu NGS&#8217;<\/strong>nin <strong>4 g\u00fc\u00e7 \u00fcnitesi<\/strong>ne de monte <img loading=\"lazy\" class=\"alignright wp-image-132621\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/akkuyu-ngs-nin-1inci-unitesi-icin-uretilen-bir-ekipman-daha-sahada-2.jpg\" alt=\"\" width=\"340\" height=\"255\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/akkuyu-ngs-nin-1inci-unitesi-icin-uretilen-bir-ekipman-daha-sahada-2.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/akkuyu-ngs-nin-1inci-unitesi-icin-uretilen-bir-ekipman-daha-sahada-2-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/akkuyu-ngs-nin-1inci-unitesi-icin-uretilen-bir-ekipman-daha-sahada-2-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/04\/akkuyu-ngs-nin-1inci-unitesi-icin-uretilen-bir-ekipman-daha-sahada-2-67x50.jpg 67w\" sizes=\"(max-width: 340px) 100vw, 340px\" \/>edilecek Arabelle buhar t\u00fcrbinlerinin konstr\u00fcksiyonunun benzersiz \u00f6zelliklerinden biri olarak \u00f6ne \u00e7\u0131k\u0131yor. Bu yap\u0131, t\u00fcrbin odas\u0131 ekipmanlar\u0131n\u0131n en y\u00fcksek tasarrufla i\u015fletilmesini sa\u011flamas\u0131n\u0131n yan\u0131 s\u0131ra, <strong>verim katsay\u0131s\u0131<\/strong>n\u0131n <strong>% 38<\/strong>\u2019e kadar ula\u015fmas\u0131n\u0131 da garantiliyor. Bu de\u011fer ise,<strong> n\u00fckleer santral t\u00fcrbin tesisi<\/strong>nin verim katsay\u0131s\u0131 bak\u0131m\u0131ndan<strong> d\u00fcnya n\u00fckleer enerji sekt\u00f6r\u00fcnde<\/strong> rekor bir de\u011fer olarak kabul ediliyor.<\/p>\n<p>N\u00fckleer g\u00fc\u00e7 santrali t\u00fcrbin \u00fcnitesi, <strong>\u201cb\u00fcy\u00fck g\u00fc\u00e7l\u00fc \u0131s\u0131 d\u00f6ner motoru\u201d<\/strong> olarak tan\u0131mlan\u0131yor. Silindir rotoru ise, bu motorun ana bile\u015fenlerinden biri. <strong>Silindir rotoru<\/strong>, reakt\u00f6r odas\u0131ndaki buhar \u00fcrete\u00e7lerinde meydana gelen <strong>y\u00fcksek bas\u0131n\u00e7l\u0131 buhar ak\u0131m\u0131n\u0131n rotor yapraklar\u0131na gelmesi<\/strong> yoluyla \u00e7al\u0131\u015f\u0131yor. Burada, <strong>s\u0131k\u0131\u015ft\u0131r\u0131lm\u0131\u015f<\/strong> ve<strong> \u0131s\u0131t\u0131lm\u0131\u015f su buhar\u0131<\/strong>n\u0131n potansiyel enerjisi rotoru d\u00f6nd\u00fcrerek elektrik ak\u0131m\u0131n\u0131 \u00fcreten t\u00fcrbojenerat\u00f6re iletilen <strong>mekanik enerjiye<\/strong> d\u00f6n\u00fc\u015ft\u00fcr\u00fcyor.<\/p>\n<p>Y\u00fcksek ve orta bas\u0131n\u00e7l\u0131 silindir\u00a0rotoru, Belfort\u2019taki (Fransa) GE Steam Power (ABD merkezli General Electric \u015firketinin \u015fubesi) \u015firketinde \u00fcretildi. \u00dcretim, N\u00fckleer D\u00fczenleme Kurumu\u2019ndan (NDK) \u00fcretime ba\u015flama izni al\u0131nd\u0131ktan sonra ba\u015flayarak yakla\u015f\u0131k<strong> 1 y\u0131l 4 ay<\/strong> s\u00fcrd\u00fc. Ocak 2021\u2019de, ekipman tedarik\u00e7isi <strong>AAEM LLC (Atomenergomash A.\u015e. ve GE Steam Power\u2019\u0131n ortak giri\u015fimi)<\/strong> ve <strong>AKKUYU N\u00dcKLEER A.\u015e.<\/strong>\u2019nin temsilcileri, ekipman\u0131n kabul\u00fcn\u00fc \u00fcretici fabrikada ger\u00e7ekle\u015ftirerek y\u00fcksek kalite standartlar\u0131na uygun \u00fcretim teknolojisinin g\u00f6zetildi\u011fini onaylam\u0131\u015ft\u0131. Rotor, kabulden sonra 2 ay boyunca fabrikada depolad\u0131. Ard\u0131ndan ise, gemiye y\u00fcklenerek deniz yoluyla <strong>Akkuyu NGS in\u015faat sahas\u0131<\/strong>na sevk edildi.<\/p>\n<p>AKKUYU N\u00dcKLEER A.\u015e. Genel M\u00fcd\u00fcr Birinci Yard\u0131mc\u0131s\u0131 ve NGS Yap\u0131 \u0130\u015fleri Direkt\u00f6r\u00fc <strong>Sergei Butckikh<\/strong> konuya y\u00f6nelik, <em>\u201cArabelle buhar t\u00fcrbini i\u00e7in silindir rotorunun Akkuyu NGS in\u015faat sahas\u0131na teslimi, projemizin<strong> Rusya<\/strong> ve<strong> T\u00fcrkiye<\/strong> ile s\u0131n\u0131rl\u0131 kalmad\u0131\u011f\u0131n\u0131, geni\u015f uluslararas\u0131 eri\u015fimini a\u00e7\u0131k\u00e7a g\u00f6steren bir olayd\u0131r. <strong>Buhar t\u00fcrbini tesisinin<\/strong> ana ekipman\u0131, <strong>Amerikan<\/strong> bir \u015firketin <strong>Fransa&#8217;daki \u015fubesi<\/strong> taraf\u0131ndan \u00fcretilmektedir. Projenin \u00fcreticileri, <strong>ekipman tedarik\u00e7ileri<\/strong> ve genel olarak projemizin kat\u0131l\u0131mc\u0131 listesi, bir\u00e7ok \u00fclkeden firmalar\u0131 i\u00e7ermektedir. <strong>Macaristan, \u00c7ek Cumhuriyeti, \u0130talya, \u0130spanya, Polonya <\/strong>ve<strong> Japonya<\/strong>&#8216;dan <strong>pompalama, \u0131s\u0131 de\u011fi\u015ftirici, elektrik-teknik<\/strong> ve <strong>di\u011fer yard\u0131mc\u0131 ekipmanlar\u0131n<\/strong> \u00fcretimi i\u00e7in <strong>sipari\u015fler<\/strong> verilmi\u015ftir. Sahadaki in\u015faat \u00e7al\u0131\u015fmalar\u0131n\u0131n ba\u011f\u0131ms\u0131z teknik denetimi, Avrupa, Orta Do\u011fu ve Asya&#8217;n\u0131n 17 \u00fclkesinde faaliyet g\u00f6steren uluslararas\u0131 m\u00fchendislik grubu <strong>Assystem<\/strong> taraf\u0131ndan ger\u00e7ekle\u015ftiriliyor\u201d<\/em> ifadelerini kulland\u0131.<\/p>\n<p>D\u00fc\u015f\u00fck h\u0131zl\u0131 <strong>Arabelle t\u00fcrbini<\/strong>, bug\u00fcn itibar\u0131yla k<strong>endi s\u0131n\u0131f\u0131nda<\/strong> piyasadaki <strong>en g\u00fc\u00e7l\u00fc t\u00fcrbin<\/strong> olarak kabul ediliyor. G\u00fcc\u00fc <strong>1900 MW<\/strong>\u2019a ula\u015fabilen <strong>t\u00fcrbin, rotorlar\u0131n kaynakl\u0131 tasar\u0131m\u0131, y\u00fcksek korozyon direnci<\/strong> ve <strong>ana bile\u015fenlerin<\/strong> uzun \u00f6m\u00fcrl\u00fc olmas\u0131n\u0131 (en az 60 y\u0131l),<strong> planl\u0131 bak\u0131m<\/strong> ve <strong>onar\u0131m<\/strong> aras\u0131ndaki s\u00fcrelerin uzamas\u0131n\u0131 da sa\u011fl\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Akkuyu NGS\u2019nin buhar t\u00fcrbin \u00fcnitesinin ilk b\u00fcy\u00fck boyutlu bile\u015feni sahaya teslim edildi. 107 tondan fazla a\u011f\u0131rl\u0131\u011fa ve 12 metreden fazla uzunlu\u011fa sahip [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":132622,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[3019,42302,64575,88816,88813,67,35992,88814,72483,88815],"views":242,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/132617"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=132617"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/132617\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/132622"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=132617"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=132617"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=132617"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}