{"id":13148,"date":"2013-07-18T05:49:31","date_gmt":"2013-07-18T02:49:31","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=13148"},"modified":"2013-07-18T05:49:31","modified_gmt":"2013-07-18T02:49:31","slug":"cin-gunes-elektriginde-2015-hedefini-acikladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/cin-gunes-elektriginde-2015-hedefini-acikladi\/","title":{"rendered":"(Turkish) \u00c7in G\u00fcne\u015f Elektri\u011finde 2015 Hedefini A\u00e7\u0131klad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/13148\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u00c7in h\u00fck\u00fcmeti daha \u00f6nce \u00fclke medyas\u0131na yans\u0131yan fakat resmi a\u00e7\u0131klaman\u0131n\u00a0 yap\u0131lmad\u0131\u011f\u0131, \u00c7in&#8217;in 2015 y\u0131l\u0131 kurulu g\u00fcne\u015f elektri\u011fi g\u00fcc\u00fc hedefi konusundaki\u00a0 a\u00e7\u0131klamas\u0131n\u0131 yapt\u0131.<\/strong><\/p>\n<p>\u00c7in Devlet Konseyi taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamada 2015 y\u0131l\u0131 sonuna kadar\u00a0 \u00fclkenin g\u00fcne\u015f elektri\u011findeki kurulu g\u00fcc\u00fcn\u00fcn 35 GW&#8217;\u0131 a\u015fmas\u0131n\u0131n hedeflendi\u011fi\u00a0 bildirildi. 2012 sonu itibari ile g\u00fcne\u015f enerjisinin \u00c7in&#8217;in elektrik \u00fcretim\u00a0 kapasitesindeki pay\u0131 8.3 GW iken a\u00e7\u0131klamada bu d\u00f6nemde \u00fclkenin g\u00fcne\u015f elektri\u011fi\u00a0 kurulu g\u00fcc\u00fcn\u00fcn y\u0131ll\u0131k 10 GW seviyesinde artmas\u0131n\u0131n beklendi\u011fi bildirildi. \u00c7in\u00a0 y\u00f6netimi ge\u00e7en y\u0131l\u0131n A\u011fustos ay\u0131nda ayn\u0131 d\u00f6nem i\u00e7in 21 GW&#8217;l\u0131k art\u0131\u015f hedefledi\u011fini a\u00e7\u0131klam\u0131\u015ft\u0131.<\/p>\n<p>Analistlere g\u00f6re \u00c7in y\u00f6netiminin bu karar\u0131nda ABD ve Avrupa Birli\u011fi&#8217;nde \u00c7inli\u00a0 g\u00fcne\u015f enerjisi ekipmanlar\u0131 \u00fcreticileri aleyhine ba\u015flatt\u0131\u011f\u0131 anti-damping\u00a0 soru\u015fturmalar\u0131 ve getirilen ek g\u00fcmr\u00fck vergileri nedeni ile s\u0131k\u0131nt\u0131l\u0131 g\u00fcnler\u00a0 ge\u00e7iren yerli \u00fcreticilere destek olma amac\u0131 etkili oldu.<\/p>\n<p><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/yenilenebilir-enerji-cin-gunes-elektriginde-2015-hedefini-acikladi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-13149\" title=\"yenilenebilir-enerji-cin-gunes-elektriginde-2015-hedefini-acikladi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/yenilenebilir-enerji-cin-gunes-elektriginde-2015-hedefini-acikladi-300x191.jpg\" alt=\"\" width=\"300\" height=\"191\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/yenilenebilir-enerji-cin-gunes-elektriginde-2015-hedefini-acikladi-300x191.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/yenilenebilir-enerji-cin-gunes-elektriginde-2015-hedefini-acikladi-78x50.jpg 78w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/yenilenebilir-enerji-cin-gunes-elektriginde-2015-hedefini-acikladi.jpg 392w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\u00c7in y\u00f6netimi son olarak ge\u00e7en ay \u00fclkedeki g\u00fcne\u015f enerjisi sekt\u00f6r\u00fcn\u00fc\u00a0 destekleyecek ve \u015fekillendirecek kapsaml\u0131 kararlar a\u00e7\u0131klam\u0131\u015ft\u0131.<\/p>\n<p>Bununla birlikte bu hedefin ula\u015f\u0131labilirli\u011fi konusunda ise farkl\u0131 g\u00f6r\u00fc\u015fler\u00a0 bulunuyor. Baz\u0131 analistlere g\u00f6re 2013&#8217;teki \u00c7in&#8217;deki b\u00fcy\u00fcme 6 ila 9 GW aras\u0131nda\u00a0 kalabilecek iken, sonraki y\u0131llarda g\u00f6r\u00fclecek h\u0131zl\u0131 b\u00fcy\u00fcme bu hedefe ula\u015f\u0131lmas\u0131n\u0131 sa\u011flayabilecek. Fakat baz\u0131 analistler ise tamamlanan santrallerin \u015febeke\u00a0 ba\u011flant\u0131lar\u0131n\u0131n sa\u011flanmas\u0131ndaki gecikmeler gibi altyap\u0131 eksiklikleri ve\u00a0 yat\u0131r\u0131mc\u0131lara sa\u011flanan al\u0131m garantilerinin \u00f6denmesindeki gecikmeler gibi\u00a0 nedenler ile bu b\u00fcy\u00fcmenin 20 GW d\u00fczeyinde kalabilece\u011fi g\u00f6r\u00fc\u015f\u00fcn\u00fc dile\u00a0 getiriyorlar.<\/p>\n<p>\u00c7in 2012 sonu itibari ile g\u00fcne\u015f elektri\u011finde 8.3 GW&#8217;l\u0131k kurulu g\u00fcce sahipti.\u00a0 K\u00fcresel \u00f6l\u00e7ekte ise g\u00fcne\u015f elektri\u011fi kurulumlar\u0131 2012 sonunda 100 GW&#8217;l\u0131k seviyeye\u00a0 yakla\u015fm\u0131\u015f iken, Almanya 32.4 GW, \u0130talya 16.3 GW ABD ise 7.7 GW&#8217;l\u0131k kurulu\u00a0 g\u00fc\u00e7lere sahipti.<\/p>\n<p>ABD ge\u00e7en y\u0131l, Avrupa Birli\u011fi ise bu y\u0131l\u0131n Haziran ay\u0131nda \u00c7inli g\u00fcne\u015f enerjisi ekipmanlar\u0131 \u00fcreticilerine \u00fclkelerinde sa\u011flad\u0131klar\u0131 haks\u0131z te\u015fvikler\u00a0 sayesinde \u00fcr\u00fcnlerini uluslararas\u0131 ticaret kurallar\u0131na ihlal edecek d\u00fczeyde ucuza\u00a0 satt\u0131klar\u0131 gerek\u00e7esi ile y\u00fczde 11.8 oran\u0131nda ge\u00e7ici ek-g\u00fcmr\u00fck vergileri getirmi\u015fti.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.yesilekonomi.com\/yenilenebilir-enerji\/cin-gunes-elektriginde-2015-hedefini-acikladi\" target=\"_blank\">Ye\u015fil Ekonomi<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u00c7in h\u00fck\u00fcmeti daha \u00f6nce \u00fclke medyas\u0131na yans\u0131yan fakat resmi a\u00e7\u0131klaman\u0131n\u00a0 yap\u0131lmad\u0131\u011f\u0131, \u00c7in&#8217;in 2015 y\u0131l\u0131 kurulu g\u00fcne\u015f elektri\u011fi g\u00fcc\u00fc hedefi konusundaki\u00a0 a\u00e7\u0131klamas\u0131n\u0131 yapt\u0131. \u00c7in [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":13149,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[6998,886,6999,63,67,165,227,1169,13,2206,105],"views":613,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13148"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=13148"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13148\/revisions"}],"predecessor-version":[{"id":13151,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/13148\/revisions\/13151"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/13149"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=13148"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=13148"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=13148"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}