{"id":131343,"date":"2021-03-16T14:29:48","date_gmt":"2021-03-16T11:29:48","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=131343"},"modified":"2021-03-16T14:30:13","modified_gmt":"2021-03-16T11:30:13","slug":"akkuyu-ngs-nin-3-uncu-guc-unitesi-icin-nukleer-reaktor-uretimine-baslandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngs-nin-3-uncu-guc-unitesi-icin-nukleer-reaktor-uretimine-baslandi\/","title":{"rendered":"(Turkish) Akkuyu NGS\u2019nin 3\u2019\u00fcnc\u00fc G\u00fc\u00e7 \u00dcnitesi \u0130\u00e7in N\u00fckleer Reakt\u00f6r \u00dcretimine Ba\u015fland\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/131343\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Rusya Devlet Atom Enerjisi Kurumu Rosatom\u2019un Volgodonsk\u2019ta\u00a0bulunan\u00a0M\u00fchendislik Birimi Atommash, Akkuyu NGS&#8217;nin 3\u2019\u00fcnc\u00fc g\u00fc\u00e7 \u00fcnitesi i\u00e7in n\u00fckleer reakt\u00f6r \u00fcretimi \u00e7al\u0131\u015fmalar\u0131na ba\u015flad\u0131. Atommash, bu kapsamda reakt\u00f6r bas\u0131n\u00e7 kab\u0131n\u0131n \u00fcretimine ge\u00e7ti. Ekipman \u00fcretiminde, 3D taray\u0131c\u0131 ile <img loading=\"lazy\" class=\"alignright wp-image-131345\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/akkuyu-ngs-nin-3-uncu-guc-unitesi-icin-nukleer-reaktor-uretimine-baslandi-2.jpg\" alt=\"\" width=\"320\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/akkuyu-ngs-nin-3-uncu-guc-unitesi-icin-nukleer-reaktor-uretimine-baslandi-2.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/akkuyu-ngs-nin-3-uncu-guc-unitesi-icin-nukleer-reaktor-uretimine-baslandi-2-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/akkuyu-ngs-nin-3-uncu-guc-unitesi-icin-nukleer-reaktor-uretimine-baslandi-2-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/akkuyu-ngs-nin-3-uncu-guc-unitesi-icin-nukleer-reaktor-uretimine-baslandi-2-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/akkuyu-ngs-nin-3-uncu-guc-unitesi-icin-nukleer-reaktor-uretimine-baslandi-2-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>yap\u0131lan \u00f6l\u00e7\u00fcmler dahil olmak \u00fczere muayene a\u015famalar\u0131 tamamland\u0131.<\/h1>\n<p>\u0130\u015fleme merkezlerinde, ilk koruyucu y\u00fczey i\u015flemi i\u00e7in <strong>boru<\/strong> ve <strong>flan\u015f b\u00f6lgesi \u00e7\u0131talar\u0131<\/strong>n\u0131n mekanik olarak i\u015flenmesi yap\u0131l\u0131yor. Uzmanlar ayr\u0131ca, <strong>\u00e7ekirdek acil so\u011futma sistemi<\/strong>nin borular\u0131n\u0131 da \u00fcretiyor. <strong>Kontrol \u00f6nlemleri, y\u00fczey kaplamas\u0131<\/strong> ve <strong>kaynak borular\u0131<\/strong> ise, daha sonra yap\u0131lacak.<\/p>\n<p>Konuyla ilgili a\u00e7\u0131klamalarda bulunan\u00a0<em>AEM Teknoloji Genel M\u00fcd\u00fcr\u00fc<\/em> <strong>Igor Kotov<\/strong>,<em> \u201cT\u00fcrkiye&#8217;nin ilk n\u00fckleer santrali Akkuyu NGS i\u00e7in <strong>ekipman \u00fcretmek<\/strong>, <strong>sipari\u015f portf\u00f6y\u00fcm\u00fczdeki<\/strong> en \u00f6nemli i\u015flerden biridir. Ekipman \u00fcretiminin t\u00fcm ana a\u015famalar\u0131 <strong>T\u00fcrkiye Cumhuriyeti N\u00fckleer D\u00fczenleme Kurumu<\/strong> taraf\u0131ndan yak\u0131ndan takip edilmektedir. Bu da, do\u011fal olarak bize \u00f6zel bir sorumluluk y\u00fcklemektedir. Ancak, yabanc\u0131 ortaklarla etkin i\u015fbirli\u011fi konusunda zaten \u00e7ok b\u00fcy\u00fck bir deneyime sahibiz ve en<strong> karma\u015f\u0131k teknolojik<\/strong> ve <strong>organizasyonel<\/strong> konularda her zaman diyalo\u011fa a\u00e7\u0131\u011f\u0131z. <strong>Akkuyu NGS<\/strong>\u2019nin ilk g\u00fc\u00e7 \u00fcnitesi i\u00e7in ekipman \u00fcrettik ve bu ekipmanlar \u015fu an <strong>in\u015faat sahas\u0131na<\/strong> ula\u015fm\u0131\u015f durumda. Bu da, di\u011fer <strong>3 \u00fcnite i\u00e7in<\/strong> \u00fcretimin planlanan programlara uyulaca\u011f\u0131na ve T\u00fcrk meslekta\u015flar\u0131m\u0131z ile yak\u0131n profesyonel etkile\u015fime g\u00f6re ilerleyece\u011fimize olan inanc\u0131m\u0131z\u0131 destekliyor\u201d<\/em> ifadelerini kulland\u0131.<\/p>\n<p>Reakt\u00f6r, i\u00e7ine \u00e7ekirdek ve i\u00e7 k\u0131s\u0131mlar\u0131n yerle\u015ftirildi\u011fi eliptik bir tabana sahip dikey silindirik bir g\u00f6vdeden olu\u015fuyor. <strong>VVER-1200 reakt\u00f6r bas\u0131n\u00e7 kab\u0131<\/strong> ise,\u00a0<strong>330<\/strong> tonluk a\u011f\u0131rl\u0131\u011fa, <strong>4,5<\/strong> metrelik \u00e7apa ve <strong>12<\/strong> metrelik bir y\u00fcksekli\u011fe sahip. Reakt\u00f6r\u00fcn tepesi, <strong>kurulu mekanizmalar, kontroller, reakt\u00f6r korumas\u0131<\/strong> ve <strong>reakt\u00f6r i\u00e7i kontrol<\/strong> i\u00e7in <strong>sens\u00f6r kablolar\u0131n\u0131n \u00e7\u0131k\u0131\u015f\u0131<\/strong>n\u0131 sa\u011flayan <strong>bran\u015fman borular\u0131n\u0131<\/strong> bar\u0131nd\u0131ran bir kapakla hava ge\u00e7irmez \u015fekilde kapat\u0131l\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Rusya Devlet Atom Enerjisi Kurumu Rosatom\u2019un Volgodonsk\u2019ta\u00a0bulunan\u00a0M\u00fchendislik Birimi Atommash, Akkuyu NGS&#8217;nin 3\u2019\u00fcnc\u00fc g\u00fc\u00e7 \u00fcnitesi i\u00e7in n\u00fckleer reakt\u00f6r \u00fcretimi \u00e7al\u0131\u015fmalar\u0131na ba\u015flad\u0131. Atommash, bu [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":131347,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[42302,88056,88055,52259,53348,88057,79029,42759],"views":132,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/131343"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=131343"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/131343\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/131347"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=131343"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=131343"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=131343"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}