{"id":131290,"date":"2021-03-15T14:35:45","date_gmt":"2021-03-15T11:35:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=131290"},"modified":"2021-03-15T14:36:09","modified_gmt":"2021-03-15T11:36:09","slug":"margun-enerji-den-yeka-ges-3-ihalesi-icin-toplamda-160-mw-lik-basvuru","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/margun-enerji-den-yeka-ges-3-ihalesi-icin-toplamda-160-mw-lik-basvuru\/","title":{"rendered":"(Turkish) Marg\u00fcn Enerji&#8217;den YEKA GES-3 \u0130halesi i\u00e7in Toplamda 160 MW&#8217;l\u0131k Ba\u015fvuru!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/131290\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Esenbo\u011fa Elektrik\u2019in ba\u011fl\u0131 ortakl\u0131\u011f\u0131 Marg\u00fcn Enerji, YEKA GES-3 ihalesine y\u00f6nelik toplam da 160 MW ba\u015fvuru yaparken KAP&#8217;a<em><img loading=\"lazy\" class=\"alignright wp-image-131293\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/margun-enerji-den-yeka-ges-3-ihalesi-icin-toplamda-160-mw-lik-basvuru.jpg\" alt=\"\" width=\"320\" height=\"198\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/margun-enerji-den-yeka-ges-3-ihalesi-icin-toplamda-160-mw-lik-basvuru.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/margun-enerji-den-yeka-ges-3-ihalesi-icin-toplamda-160-mw-lik-basvuru-300x186.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/margun-enerji-den-yeka-ges-3-ihalesi-icin-toplamda-160-mw-lik-basvuru-500x310.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/margun-enerji-den-yeka-ges-3-ihalesi-icin-toplamda-160-mw-lik-basvuru-80x50.jpg 80w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/><\/em> yap\u0131lan a\u00e7\u0131klama ise <span style=\"text-decoration: underline;\">\u015fu \u015fekildedir:<\/span><\/strong><\/h1>\n<p><em><strong>T.C. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131-Enerji \u0130\u015fleri Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc<\/strong> taraf\u0131ndan <strong>03.07.2020<\/strong> tarihli, <strong>31174<\/strong> say\u0131l\u0131 <strong>Resmi Gazete<\/strong>\u2019de yay\u0131mlanan, <strong>g\u00fcne\u015f enerjisine dayal\u0131<\/strong> <strong>yenilenebilir enerji kaynak alanlar\u0131<\/strong> ve ba\u011flant\u0131 kapasitelerinin tahsisine ili\u015fkin <strong>YEKA GES-3 ihalesi<\/strong> <strong>36<\/strong> ilde <strong>74 yar\u0131\u015fma<\/strong>da 08-12 Mart 2021 tarihlerinde <strong>illere<\/strong> ve <strong>yar\u0131\u015fmalara<\/strong> g\u00f6re <strong>farkl\u0131 tarihlerde<\/strong> a\u00e7\u0131lan <strong>ba\u015fvuru al\u0131mlar\u0131<\/strong> bug\u00fcn tamamlanm\u0131\u015ft\u0131r. <\/em><\/p>\n<p><em>Bu kapsamda \u015firketimizin <strong>% 100<\/strong> ba\u011fl\u0131 orta\u011f\u0131 olan <strong>Marg\u00fcn Enerji<\/strong> \u00dcretim Sanayi Ve Ticaret A.\u015e. bug\u00fcn <strong>Antalya<\/strong> \u2013 3 (10 MW), <strong>Kahramanmara\u015f<\/strong> \u2013 1 (10 MW),<strong> U\u015fak<\/strong> \u2013 2 (15 MW) ve<strong> Gaziantep<\/strong> \u2013 3 (10 MW) yar\u0131\u015fmalar\u0131na yapt\u0131\u011f\u0131 <strong>45 MW<\/strong> l\u0131k ba\u015fvuru ile <strong>12 Mart 2021<\/strong> tarihi itibariyle <strong>ba\u015fvuru s\u00fcreci<\/strong> sona ermi\u015f olup toplamda<strong> 160 MW<\/strong> ba\u015fvuru ger\u00e7ekle\u015ftirmi\u015ftir. \u0130hale s\u00fcrecine ili\u015fkin geli\u015fmeler kamuoyuna duyurulacakt\u0131r.<\/em><\/p>\n<p>Kaynak: <a href=\"https:\/\/www.kap.org.tr\/Bildirim\/918085\" target=\"_blank\" rel=\"nofollow noopener\">KAP<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Esenbo\u011fa Elektrik\u2019in ba\u011fl\u0131 ortakl\u0131\u011f\u0131 Marg\u00fcn Enerji, YEKA GES-3 ihalesine y\u00f6nelik toplam da 160 MW ba\u015fvuru yaparken KAP&#8217;a yap\u0131lan a\u00e7\u0131klama ise \u015fu \u015fekildedir: [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":131293,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[5070,87957,53157,86383,88005,1388,54979,61450],"views":158,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/131290"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=131290"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/131290\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/131293"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=131290"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=131290"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=131290"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}