{"id":130977,"date":"2021-03-10T13:57:07","date_gmt":"2021-03-10T10:57:07","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=130977"},"modified":"2021-03-10T14:00:29","modified_gmt":"2021-03-10T11:00:29","slug":"subat2021-sonu-itibariyle-turkiye-nin-kurulu-gucunun-6-869-mwi-gunesten","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/subat2021-sonu-itibariyle-turkiye-nin-kurulu-gucunun-6-869-mwi-gunesten\/","title":{"rendered":"(Turkish) \u015eubat 2021 Sonu \u0130tibariyle T\u00fcrkiye&#8217;nin Kurulu G\u00fcc\u00fcn\u00fcn 6.869 MW\u2019\u0131 G\u00fcne\u015ften!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/130977\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>T\u00fcrkiye Elektrik \u0130letim A.\u015e. (TE\u0130A\u015e) taraf\u0131ndan \u015eubat 2021 Kurulu G\u00fc\u00e7 Raporu Yay\u0131mland\u0131. Raporda yer alan verilere g\u00f6re, <img loading=\"lazy\" class=\"alignright wp-image-130981\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/subat-sonu-itibariyle-turkiyenin-kurulu-gucunun-6-869-mwi-gunesten.jpg\" alt=\"\" width=\"320\" height=\"240\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/subat-sonu-itibariyle-turkiyenin-kurulu-gucunun-6-869-mwi-gunesten.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/subat-sonu-itibariyle-turkiyenin-kurulu-gucunun-6-869-mwi-gunesten-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/subat-sonu-itibariyle-turkiyenin-kurulu-gucunun-6-869-mwi-gunesten-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/subat-sonu-itibariyle-turkiyenin-kurulu-gucunun-6-869-mwi-gunesten-67x50.jpg 67w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>toplam kurulu g\u00fc\u00e7 96 bin 709 MW olurken 2021 \u015eubat ay\u0131 sonunda kurulu g\u00fcc\u00fcn 6 bin 869 MW\u2019l\u0131k k\u0131sm\u0131 g\u00fcne\u015f santrallerinden kar\u015f\u0131land\u0131. G\u00fcne\u015f enerjisindeki kurulu g\u00fc\u00e7 bir \u00f6nceki aya g\u00f6re 63 MW art\u0131\u015f kaydetti. TE\u0130A\u015e\u2019\u0131n verilerine g\u00f6re, kurulu g\u00fc\u00e7 i\u00e7erisindeki en b\u00fcy\u00fck pay 25 bin 693 MW ile do\u011fal gaz santrallerinin, sonras\u0131nda ise 23 bin 99 MW ile barajl\u0131 kaynaklar\u0131ndan meydana geldi. Akarsu tipi hidroelektrik santrallerin kurulu g\u00fcc\u00fc 8.078 MW, linyitin 10.120 MW, ithal k\u00f6m\u00fcr\u00fcn 8.986 MW, r\u00fczgar\u0131n 9.192 MW,\u00a0 jeotermalin 1.623 MW ve biyok\u00fctlenin 1.146 MW olarak ger\u00e7ekle\u015fti.<\/strong><\/h1>\n<p><strong>TE\u0130A\u015e<\/strong>\u2019\u0131n ayl\u0131k olarak yay\u0131nlad\u0131\u011f\u0131 <strong>kurulu g\u00fc\u00e7 raporu<\/strong>nda, \u015fubat ay\u0131nda <strong>elektrik \u00fcretiminde<\/strong> kurulu g\u00fc\u00e7 bir \u00f6nceki aya g\u00f6re <strong>438 MW<\/strong> art\u0131\u015f ile<strong> 96.709 MW<\/strong>\u00a0de\u011ferini y\u00fckseldi.<\/p>\n<p>T\u00fcrkiye\u2019deki <strong>lisanss\u0131z GES say\u0131s\u0131<\/strong> ise bir \u00f6nceki aya g\u00f6re <strong>62 adet<\/strong> artarak <strong>7.665\u2019e<\/strong> ula\u015f\u0131rken <strong>lisansl\u0131 santral<\/strong> dahil olmak \u00fczere toplam <strong>GES<\/strong> adedi <strong>7.702\u2019ye<\/strong> \u00e7\u0131kt\u0131.<\/p>\n<p><strong>2021 Y\u0131l\u0131 \u015eubat Ay\u0131 Kurulu G\u00fc\u00e7 Raporu\u2019na\u00a0<a href=\"https:\/\/www.solar.ist\/wp-content\/uploads\/2021\/03\/%C5%9Eubat-2021-Kurulu-G%C3%BC%C3%A7-Raporu-2.pdf\" target=\"_blank\" rel=\"nofollow noopener\">Ula\u015fmak \u0130\u00e7in TIKLAYIN &gt;&gt;&gt;<\/a><\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye Elektrik \u0130letim A.\u015e. (TE\u0130A\u015e) taraf\u0131ndan \u015eubat 2021 Kurulu G\u00fc\u00e7 Raporu Yay\u0131mland\u0131. Raporda yer alan verilere g\u00f6re, toplam kurulu g\u00fc\u00e7 96 bin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":130981,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[53114,5070,52259,53157,26361,87768,54431,54979,47585],"views":137,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/130977"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=130977"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/130977\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/130981"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=130977"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=130977"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=130977"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}