{"id":130919,"date":"2021-03-09T15:29:12","date_gmt":"2021-03-09T12:29:12","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=130919"},"modified":"2021-03-10T16:16:43","modified_gmt":"2021-03-10T13:16:43","slug":"255-mw-kapasiteli-yeka-ges-3-icin-2-265-mwlik-teklif-verildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/255-mw-kapasiteli-yeka-ges-3-icin-2-265-mwlik-teklif-verildi\/","title":{"rendered":"(Turkish) 255 MW Kapasiteye Sahip &#8216;YEKA GES-3&#8217; \u0130\u00e7in 2.265 MW\u2019l\u0131k Teklif Verildi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/130919\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>36 farkl\u0131 \u015fehirde 74 g\u00fcne\u015f enerjisi projesine y\u00f6nelik toplamda 1.000 MW&#8217;l\u0131k kapasiteye sahip YEKA GES-3 yar\u0131\u015fmalar\u0131na ilk ba\u015fvurular yap\u0131ld\u0131. 17 farkl\u0131 \u015fehirde toplam olarak 255 MW kapasite hakk\u0131na sahip\u00a0YEKA GES-3&#8217;e 2.265 MW\u2019l\u0131k teklif <img loading=\"lazy\" class=\"alignright wp-image-130985\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/255-mw-kapasiteli-yeka-ges-3-icin-2-265-mwlik-teklif-verildi-1.jpg\" alt=\"\" width=\"320\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/255-mw-kapasiteli-yeka-ges-3-icin-2-265-mwlik-teklif-verildi-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/255-mw-kapasiteli-yeka-ges-3-icin-2-265-mwlik-teklif-verildi-1-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/255-mw-kapasiteli-yeka-ges-3-icin-2-265-mwlik-teklif-verildi-1-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/255-mw-kapasiteli-yeka-ges-3-icin-2-265-mwlik-teklif-verildi-1-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/255-mw-kapasiteli-yeka-ges-3-icin-2-265-mwlik-teklif-verildi-1-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>sunuldu<\/strong><em><strong>.<\/strong><\/em><\/h1>\n<p><strong>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131&#8217;nca (ETKB)<\/strong>\u00a0yay\u0131mlanan a\u00e7\u0131klamaya g\u00f6re <strong>8 Mart 2021&#8217;de<\/strong>\u00a0<strong>17<\/strong>\u00a0farkl\u0131 \u015fehirde toplam\u00a0<strong>255 MW&#8217;l\u0131k kapasite<\/strong> hakk\u0131na y\u00f6nelik ger\u00e7ekle\u015ftirilecek yar\u0131\u015fmalara\u00a0<strong>64 \u015firket<\/strong>\u00a0<strong>kapal\u0131 zarf usul\u00fcyle<\/strong>\u00a0toplam kurulu g\u00fc\u00e7leri <strong>2.265 MW<\/strong> olabilecek <strong>160 proje<\/strong> i\u00e7in tekliflerini sundu.<\/p>\n<h2><strong>YEKA GES-3 Yar\u0131\u015fmalar\u0131 i\u00e7in 08 Mart 2021&#8217;de ger\u00e7ekle\u015ftirilen ba\u015fvurular\u0131n evrak mevcudiyeti kontrollerine y\u00f6nelik duyuru da yay\u0131mland\u0131.<\/strong><\/h2>\n<p><strong>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131&#8217;nca (ETKB)<\/strong>\u00a0<strong>YEKA GES-3 yar\u0131\u015fmalar\u0131na y\u00f6nelik<\/strong>\u00a0<strong>08.03.2021&#8217;de yap\u0131lan<\/strong>\u00a0ba\u015fvurular\u0131n <strong>evrak kontrolleri<\/strong> hakk\u0131nda duyuruda yay\u0131mland\u0131.<\/p>\n<p>\u0130lgili Duyuru \u0130\u00e7in\u00a0<strong><a href=\"https:\/\/enerjiapi.enerji.gov.tr\/Media\/Dizin\/BHIM\/Duyurular\/\/08.03.2021%20TAR%C4%B0HL%C4%B0%20YEKA%20GES%20-%203%20BA%C5%9EVURULARI%20%C4%B0%C3%87%C4%B0N%20EVRAK%20MEVCUD%C4%B0YET%C4%B0KONTROLLER%C4%B0_202103081757.pdf\" target=\"_blank\" rel=\"nofollow noopener\">TIKLAYIN &gt;&gt;&gt;<\/a><\/strong><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. 36 farkl\u0131 \u015fehirde 74 g\u00fcne\u015f enerjisi projesine y\u00f6nelik toplamda 1.000 MW&#8217;l\u0131k kapasiteye sahip YEKA GES-3 yar\u0131\u015fmalar\u0131na ilk ba\u015fvurular yap\u0131ld\u0131. 17 farkl\u0131 \u015fehirde [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":130985,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[5070,52259,47584,35038,7781,53157,54979,61445,75066],"views":170,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/130919"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=130919"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/130919\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/130985"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=130919"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=130919"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=130919"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}