{"id":130601,"date":"2021-03-04T15:27:00","date_gmt":"2021-03-04T12:27:00","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=130601"},"modified":"2021-03-04T15:27:15","modified_gmt":"2021-03-04T12:27:15","slug":"sepas-enerji-nin-gebze-de-yeni-musteri-hizmetleri-merkezi-hizmete-girdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sepas-enerji-nin-gebze-de-yeni-musteri-hizmetleri-merkezi-hizmete-girdi\/","title":{"rendered":"(Turkish) &#8217;Sepa\u015f Enerji\u2019nin Gebze\u2019de Yeni M\u00fc\u015fteri Hizmetleri Merkezi Hizmete Girdi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/130601\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>T\u00fcrkiye\u2019nin \u00f6nde gelen enerji tedarik \u015firketlerinden olan Sepa\u015f Enerji\u2019nin Gebze\u2019deki M\u00fc\u015fteri Hizmetleri Merkezi yeni adresine ge\u00e7ti. \u00d6nceki g\u00fcn a\u00e7\u0131l\u0131\u015f\u0131 yap\u0131lan <img loading=\"lazy\" class=\"alignright wp-image-130603\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/sepas-enerji-nin-gebze-de-yeni-musteri-hizmetleri-merkezi-hizmete-girdi.jpg\" alt=\"\" width=\"320\" height=\"219\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/sepas-enerji-nin-gebze-de-yeni-musteri-hizmetleri-merkezi-hizmete-girdi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/sepas-enerji-nin-gebze-de-yeni-musteri-hizmetleri-merkezi-hizmete-girdi-300x205.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/sepas-enerji-nin-gebze-de-yeni-musteri-hizmetleri-merkezi-hizmete-girdi-500x342.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/sepas-enerji-nin-gebze-de-yeni-musteri-hizmetleri-merkezi-hizmete-girdi-73x50.jpg 73w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>yeni MHM, \u00fcst d\u00fczey sa\u011fl\u0131k \u00f6nlemleri ve h\u0131zl\u0131 i\u015flem olanaklar\u0131yla hizmet verecek.<\/strong><\/h1>\n<p><strong>Sepa\u015f Enerji<\/strong>\u2019nin <strong>Gebze<\/strong>\u2019deki <strong>M\u00fc\u015fteri Hizmetleri Merkezi<\/strong> yeni binas\u0131na ta\u015f\u0131nd\u0131. <strong>G\u00fczeller Mahallesi<\/strong>\u2019ndeki <strong>Gen\u00e7lik Caddesi<\/strong>\u2019nde bulunan eski merkezin ekonomik \u00f6mr\u00fcn\u00fc tamamlamas\u0131 \u00fczerine kapat\u0131l\u0131p, yeni MHM devreye al\u0131nd\u0131. <strong>Sepa\u015f Enerji Gebze M\u00fc\u015fteri Hizmetleri Merkezi<\/strong>\u2019nin yeni adresi, il\u00e7enin i\u015flek noktalar\u0131ndan <strong>Hac\u0131halil Mahallesi<\/strong>\u2019ne ba\u011fl\u0131 <strong>\u0130stanbul Caddesi<\/strong>\u2019ndeki <strong>143 B<\/strong> numaral\u0131 <strong>bina<\/strong> oldu.<\/p>\n<p><strong>Yeni M\u00fc\u015fteri Hizmetleri Merkezi<\/strong>, <strong>normalle\u015fme uygulamalar\u0131<\/strong> kapsam\u0131nda bug\u00fcnden itibaren <strong>08:30-12:00<\/strong> ile <strong>13:00-17:30<\/strong> saatleri aras\u0131nda hizmet verecek ve <strong>HES Kodu sorgulamas\u0131<\/strong> ile giri\u015f yap\u0131lacak. Gebzelilerin h\u0131zl\u0131 ve konforlu bi\u00e7imde hizmet alabilecekleri yeni <strong>MHM<\/strong>\u2019de, <strong>koronavir\u00fcs salg\u0131n\u0131<\/strong>na kar\u015f\u0131 <strong>sosyal mesafe<\/strong> ve<strong> t\u00fcm temizlik tedbirleri<\/strong> eksiksizce uygulanacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye\u2019nin \u00f6nde gelen enerji tedarik \u015firketlerinden olan Sepa\u015f Enerji\u2019nin Gebze\u2019deki M\u00fc\u015fteri Hizmetleri Merkezi yeni adresine ge\u00e7ti. \u00d6nceki g\u00fcn a\u00e7\u0131l\u0131\u015f\u0131 yap\u0131lan yeni MHM, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":130603,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[53114,52259,21827,87504,79353,87508,69696,87506,87505,87510,87507,87509,74875,82233],"views":117,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/130601"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=130601"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/130601\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/130603"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=130601"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=130601"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=130601"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}