{"id":130508,"date":"2021-03-03T13:50:37","date_gmt":"2021-03-03T10:50:37","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=130508"},"modified":"2021-03-03T13:51:11","modified_gmt":"2021-03-03T10:51:11","slug":"erzurum-un-aziziye-ilcesi-nde-1mw-guce-sahip-gunes-santrali-kuruldu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/erzurum-un-aziziye-ilcesi-nde-1mw-guce-sahip-gunes-santrali-kuruldu\/","title":{"rendered":"(Turkish) Erzurum\u2019un Aziziye \u0130l\u00e7esi&#8217;ne 1MW G\u00fcce Sahip G\u00fcne\u015f Santrali Kuruldu"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/130508\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Erzurum\u2019un Aziziye il\u00e7esinde 1 MW kurulu g\u00fcce sahip g\u00fcne\u015f enerji santrali (GES) kurulurken y\u0131lda yakla\u015f\u0131k 1 milyon 850 bin <img loading=\"lazy\" class=\"alignright wp-image-130511\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/erzurum-un-aziziye-ilcesi-nde-1mw-guce-sahip-gunes-santrali-kuruldu.jpg\" alt=\"\" width=\"320\" height=\"206\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/erzurum-un-aziziye-ilcesi-nde-1mw-guce-sahip-gunes-santrali-kuruldu.jpg 655w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/erzurum-un-aziziye-ilcesi-nde-1mw-guce-sahip-gunes-santrali-kuruldu-300x193.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/erzurum-un-aziziye-ilcesi-nde-1mw-guce-sahip-gunes-santrali-kuruldu-500x322.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/erzurum-un-aziziye-ilcesi-nde-1mw-guce-sahip-gunes-santrali-kuruldu-78x50.jpg 78w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>kilovatsaat elektrik \u00fcretecek olan g\u00fcne\u015f santraliyle 900 hanenin enerji ihtiyac\u0131na denk \u00fcretim yap\u0131laca\u011f\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/strong><\/h1>\n<p>Merkez <strong>Aziziye \u0130l\u00e7e Belediyesi<\/strong>, g\u00fcne\u015f enerjisinden enerji \u00fcretimi i\u00e7in\u00a0<strong>Ocak Mahallesi<\/strong>\u2019nde g\u00fcne\u015f enerji sistemi kurulumu yap\u0131l\u0131rken <strong>karla kapl\u0131 arazide<\/strong> i\u015f makineleriyle <strong>g\u00fcne\u015f panelleri<\/strong>nin tek tek yerle\u015fimi yap\u0131ld\u0131. Yap\u0131lan \u00e7al\u0131\u015fmalar sonras\u0131<strong> 1 MW<\/strong>\u00a0kurulu g\u00fcce sahip\u00a0<strong>G\u00fcne\u015f Santralinin<\/strong>\u00a0karla kapl\u0131 arazi \u00fczerinde kurulumu tamamlan\u0131rken y\u0131lda yakla\u015f\u0131k olarak<strong>\u00a01 milyon 850 bin kilovatsaat<\/strong> enerji \u00fcretecek olan <strong>GES<\/strong> ile\u00a0<strong>900 hanenin enerji ihtiyac\u0131<\/strong>n\u0131n kar\u015f\u0131lanmas\u0131 planlan\u0131yor.<\/p>\n<p><strong>Erzurum<\/strong>\u00a0ili\u00a0<strong>g\u00fcnl\u00fck<\/strong> ve <strong>y\u0131ll\u0131k g\u00fcne\u015flenme s\u00fcresi ve \u0131\u015f\u0131n\u0131m de\u011ferleri\u00a0<\/strong>a\u00e7\u0131s\u0131ndan\u00a0T\u00fcrkiye\u2019de <strong>\u00e7ok \u00f6nemli bir verim avantaj\u0131na da <\/strong>sahiptir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Erzurum\u2019un Aziziye il\u00e7esinde 1 MW kurulu g\u00fcce sahip g\u00fcne\u015f enerji santrali (GES) kurulurken y\u0131lda yakla\u015f\u0131k 1 milyon 850 bin kilovatsaat elektrik \u00fcretecek [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":130511,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[87406,5070,52259,53157,87407,54979],"views":89,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/130508"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=130508"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/130508\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/130511"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=130508"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=130508"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=130508"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}