{"id":130324,"date":"2021-03-01T11:23:23","date_gmt":"2021-03-01T08:23:23","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=130324"},"modified":"2021-03-01T11:23:23","modified_gmt":"2021-03-01T08:23:23","slug":"akkuyu-ngsnin-2inci-guc-unitesi-pompa-govdesi-montajina-baslandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-ngsnin-2inci-guc-unitesi-pompa-govdesi-montajina-baslandi\/","title":{"rendered":"(Turkish) Akkuyu NGS&#8217;nin 2&#8217;inci G\u00fc\u00e7 \u00dcnitesi Pompa G\u00f6vdesi Montaj\u0131na Ba\u015fland\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/130324\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Mersin\u2019de yap\u0131m\u0131 s\u00fcren Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin (NGS) 2&#8217;inci g\u00fc\u00e7 \u00fcnitesinde yer <img loading=\"lazy\" class=\"alignright wp-image-130326\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/akkuyu-ngs-nin-2inci-guc-unitesi-pompa-govdesi-montajina-baslandi-1.jpg\" alt=\"\" width=\"320\" height=\"289\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/akkuyu-ngs-nin-2inci-guc-unitesi-pompa-govdesi-montajina-baslandi-1.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/akkuyu-ngs-nin-2inci-guc-unitesi-pompa-govdesi-montajina-baslandi-1-300x271.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/akkuyu-ngs-nin-2inci-guc-unitesi-pompa-govdesi-montajina-baslandi-1-444x400.jpg 444w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/akkuyu-ngs-nin-2inci-guc-unitesi-pompa-govdesi-montajina-baslandi-1-55x50.jpg 55w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/03\/akkuyu-ngs-nin-2inci-guc-unitesi-pompa-govdesi-montajina-baslandi-1-500x451.jpg 500w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>alacak ana sirk\u00fclasyon pompa \u00fcnitelerinin k\u00fcresel g\u00f6vdelerinin montaj\u0131na ba\u015fland\u0131.<\/h1>\n<p>Montaj i\u015flemi, <em>Rusya Devlet Atom Enerjisi Kurumu<\/em><strong> Rosatom<\/strong>\u2019un makine yap\u0131m b\u00f6l\u00fcm\u00fc <strong>Atomenergomash<\/strong>&#8216;\u0131n bir par\u00e7as\u0131 olan <strong>AEM\u00a0Technologies\u00a0<\/strong>\u015firketinin <strong>Petrozavodsk \u015fubesi<\/strong>nde yap\u0131l\u0131yor.<\/p>\n<p>Petrozavodskmash, <strong>sirk\u00fclasyon pompas\u0131 teslimat seti<\/strong>nde bulunan g\u00f6vdelerin<strong> 4 y\u00f6nlendirme aparat\u0131<\/strong>n\u0131n da \u00fcretimini tamamlam\u0131\u015ft\u0131. \u015eirket bu i\u015flemden sonra imalat\u0131n bir sonraki a\u015famas\u0131na ge\u00e7erek montaj \u00e7al\u0131\u015fmalar\u0131na ba\u015flad\u0131. Bu i\u015flemle, <strong>ana sirk\u00fclasyon pompas\u0131 \u00fcnitesi<\/strong>nin g\u00f6vdelerinde kaynak \u00e7al\u0131\u015fmalar\u0131 yap\u0131lacak. <strong>\u00dcr\u00fcnler<\/strong> daha sonra<strong> mekanik i\u015fleme<\/strong> girecek.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Mersin\u2019de yap\u0131m\u0131 s\u00fcren Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali\u2019nin (NGS) 2&#8217;inci g\u00fc\u00e7 \u00fcnitesinde yer alacak ana sirk\u00fclasyon pompa \u00fcnitelerinin k\u00fcresel g\u00f6vdelerinin montaj\u0131na ba\u015fland\u0131. Montaj [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":130326,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[87280,42302,69230,87278,87281,5070,52259,53348,76557,87279],"views":123,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/130324"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=130324"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/130324\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/130326"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=130324"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=130324"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=130324"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}