{"id":130290,"date":"2021-02-28T21:36:43","date_gmt":"2021-02-28T18:36:43","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=130290"},"modified":"2021-02-28T21:40:20","modified_gmt":"2021-02-28T18:40:20","slug":"spk-pamukova-yenilenebilir-in-tortum-elektrigi-devralinmasina-onay-verdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/spk-pamukova-yenilenebilir-in-tortum-elektrigi-devralinmasina-onay-verdi\/","title":{"rendered":"(Turkish) Pamukova Yenilenebilir\u2019in Tortum Elektri\u011fi Devralmas\u0131na Onay Verildi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/130290\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><img loading=\"lazy\" class=\"alignright wp-image-130294\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/spk-pamukova-yenilenebilir-in-tortum-elektrigi-devralinmasina-onay-verdi.jpg\" alt=\"\" width=\"340\" height=\"239\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/spk-pamukova-yenilenebilir-in-tortum-elektrigi-devralinmasina-onay-verdi.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/spk-pamukova-yenilenebilir-in-tortum-elektrigi-devralinmasina-onay-verdi-300x211.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/spk-pamukova-yenilenebilir-in-tortum-elektrigi-devralinmasina-onay-verdi-500x352.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/spk-pamukova-yenilenebilir-in-tortum-elektrigi-devralinmasina-onay-verdi-71x50.jpg 71w\" sizes=\"(max-width: 340px) 100vw, 340px\" \/>SPK taraf\u0131ndan Pamukova Yenilenebilir A.\u015e.\u2019nin Tortum Elektrik A.\u015e.\u2019yi devral\u0131nmas\u0131 i\u015flemi onayland\u0131.<\/h1>\n<p>Sermaye Piyasas\u0131 Kurulu (SPK), <strong>Pamukova Yenilenebilir Elektrik \u00dcretim A\u015e<\/strong>\u2019nin, <strong>Tortum Elektrik \u00dcretim A\u015e<\/strong>&#8216;yi t\u00fcm<strong> aktif<\/strong> ve <strong>pasifleriyle<\/strong> birlikte bir b\u00fct\u00fcn olarak<strong> tasfiyesiz infisah yoluyla<\/strong> devralmas\u0131 i\u015flemine y\u00f6nelik onay verdi.<\/p>\n<p>Birle\u015fme sonras\u0131nda <strong>Pamukova Yenilenebilir Elektrik \u00dcretim A.\u015e.<\/strong>\u2019nin sermayesi, <strong>17.000.000<\/strong> liradan <strong>31.095.331<\/strong> liraya y\u00fckselecek olup <strong>her 2 \u015firket<\/strong> de<strong> Verusa Holding<\/strong>\u2019e ba\u011fl\u0131 olan ve k\u0131sa s\u00fcre \u00f6nce <strong>halka arz\u0131na<\/strong> karar verilen <strong>Pamukova Elektrik A.\u015e.<\/strong>\u2019nin ba\u011fl\u0131 ortakl\u0131klar\u0131 aras\u0131na girecektir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. SPK taraf\u0131ndan Pamukova Yenilenebilir A.\u015e.\u2019nin Tortum Elektrik A.\u015e.\u2019yi devral\u0131nmas\u0131 i\u015flemi onayland\u0131. Sermaye Piyasas\u0131 Kurulu (SPK), Pamukova Yenilenebilir Elektrik \u00dcretim A\u015e\u2019nin, Tortum Elektrik [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":130294,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[53114,52259,87266,87269,87264,77634,87267,87270,87268,87265],"views":110,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/130290"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=130290"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/130290\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/130294"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=130290"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=130290"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=130290"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}