{"id":129844,"date":"2021-02-22T07:07:48","date_gmt":"2021-02-22T04:07:48","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=129844"},"modified":"2021-02-22T07:09:27","modified_gmt":"2021-02-22T04:09:27","slug":"tortum-hidroelektrik-santrali-ozellestiriliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tortum-hidroelektrik-santrali-ozellestiriliyor\/","title":{"rendered":"(Turkish) Tortum Hidroelektrik Santrali (HES) \u00d6zelle\u015ftiriliyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/129844\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>\u00d6zelle\u015ftirme \u0130daresi Ba\u015fkanl\u0131\u011f\u0131 (\u00d6\u0130B) taraf\u0131ndan Tortum Hidroelektrik Santrali&#8217;nin i\u015fletme hakk\u0131 verilerek <img loading=\"lazy\" class=\"alignright wp-image-129846\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/tortum-hidroelektrik-santrali-ozellestiriliyor.jpg\" alt=\"\" width=\"340\" height=\"198\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/tortum-hidroelektrik-santrali-ozellestiriliyor.jpg 640w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/tortum-hidroelektrik-santrali-ozellestiriliyor-300x175.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/tortum-hidroelektrik-santrali-ozellestiriliyor-500x291.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/tortum-hidroelektrik-santrali-ozellestiriliyor-80x47.jpg 80w\" sizes=\"(max-width: 340px) 100vw, 340px\" \/>\u00f6zelle\u015ftirilecektir.<\/h1>\n<p><strong> \u00d6zelle\u015ftirme \u0130daresi Ba\u015fkanl\u0131\u011f\u0131 (\u00d6\u0130B)<\/strong>, <strong>Tortum Hidroelektrik Santrali<\/strong> ile <strong>Santral<\/strong> taraf\u0131ndan kullan\u0131lan <strong>ta\u015f\u0131nmazlar\u0131n i\u015fletme hakk\u0131n\u0131<\/strong>\u00a0vererek \u00f6zelle\u015ftirecektir.<\/p>\n<p>\u00d6zelle\u015ftirme i\u00e7in ilgili ihaleye y\u00f6nelik <strong>5.000.000 lira<\/strong> <strong>ge\u00e7ici teminat bedeli<\/strong>\u00a0belirlenirken\u00a0<strong>\u0130hale \u015fartnamesi<\/strong>, bankaya yat\u0131r\u0131lmas\u0131 gereken <strong>10.000 lira<\/strong> kar\u015f\u0131l\u0131\u011f\u0131nda <strong>T.C. Hazine ve Maliye Bakanl\u0131\u011f\u0131<\/strong>, <strong>\u00d6zelle\u015ftirme \u0130daresi Ba\u015fkanl\u0131\u011f\u0131<\/strong>, Ziya G\u00f6kalp Caddesi, <strong>No: 80<\/strong>, 06600, <strong>Kurtulu\u015f, Ankara<\/strong> adresinden al\u0131nabilir.<\/p>\n<p><strong>Tekliflerin ise<\/strong> en son tarih olan\u00a0<strong>27 Nisan 2021<\/strong> g\u00fcn\u00fc saat <strong>17.00<\/strong>\u2019ye kadar <strong>elden teslim edilmesi<\/strong> gerekiyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u00d6zelle\u015ftirme \u0130daresi Ba\u015fkanl\u0131\u011f\u0131 (\u00d6\u0130B) taraf\u0131ndan Tortum Hidroelektrik Santrali&#8217;nin i\u015fletme hakk\u0131 verilerek \u00f6zelle\u015ftirilecektir. \u00d6zelle\u015ftirme \u0130daresi Ba\u015fkanl\u0131\u011f\u0131 (\u00d6\u0130B), Tortum Hidroelektrik Santrali ile Santral taraf\u0131ndan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":129846,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[2674,52259,86894,26043,26044,60023,86895,86891,2998,86893,81241,63405,54979,86892],"views":172,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/129844"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=129844"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/129844\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/129846"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=129844"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=129844"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=129844"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}