{"id":129042,"date":"2021-02-10T15:17:28","date_gmt":"2021-02-10T12:17:28","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=129042"},"modified":"2021-02-10T15:18:13","modified_gmt":"2021-02-10T12:18:13","slug":"asagi-kalekoy-hidroelektrik-santralini-tamamladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/asagi-kalekoy-hidroelektrik-santralini-tamamladi\/","title":{"rendered":"(Turkish) A\u015fa\u011f\u0131 Kalek\u00f6y &#8216;Hidroelektrik Santrali&#8217;ni Tamamlad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/129042\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>GE Yenilenebilir Enerji Hidroelektrik Enerji \u00c7\u00f6z\u00fcmleri, A\u015fa\u011f\u0131 Kalek\u00f6y projesine 155 MW kapasiteli 3 Francis t\u00fcrbini ve ilgili ekipman sa\u011flad\u0131. \u0130n\u015fas\u0131 tamamlanan hidroelektrik santrali, \u015febeke ba\u011flant\u0131s\u0131 yap\u0131ld\u0131ktan sonra resmi olarak ticari faaliyete ge\u00e7ti.<\/h1>\n<p><strong>GE Yenilenebilir Enerji<\/strong>, <strong>Bing\u00f6l<\/strong>\u2019deki <strong>A\u015fa\u011f\u0131 Kalek\u00f6y Baraj\u0131<\/strong> \u00fczerinde kurulan <strong>A\u015fa\u011f\u0131 Kalek\u00f6y Hidroelektrik Santrali<\/strong>&#8216;ni ba\u015far\u0131yla tamamlad\u0131. Santral, kalan<strong> son 3 \u00fcnitenin<\/strong> de \u015febekeye ba\u011flanmas\u0131yla tam kapasite faaliyete ge\u00e7ti. Konsorsiyumun ba\u015f\u0131nda bulunan <strong>GE Hidroelektrik Enerji \u00c7\u00f6z\u00fcmleri<\/strong> proje i\u00e7in, <strong>kontrol sistemi, destek santral sistemleri<\/strong> ve <strong>hidroelektrik santral \u015falt sahas\u0131<\/strong> dahil olmak \u00fczere,<strong> 155 MW<\/strong> kapasiteli toplam <strong>3 adet<\/strong> dikey Francis t\u00fcrbin temin <img loading=\"lazy\" class=\"alignright wp-image-129044\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/asagi-kalekoy-hidroelektrik-santralini-tamamladi.jpg\" alt=\"\" width=\"340\" height=\"227\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/asagi-kalekoy-hidroelektrik-santralini-tamamladi.jpg 600w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/asagi-kalekoy-hidroelektrik-santralini-tamamladi-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/asagi-kalekoy-hidroelektrik-santralini-tamamladi-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/asagi-kalekoy-hidroelektrik-santralini-tamamladi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/asagi-kalekoy-hidroelektrik-santralini-tamamladi-450x300.jpg 450w\" sizes=\"(max-width: 340px) 100vw, 340px\" \/>etti.\u00a0<strong>500 MW<\/strong>\u2019l\u0131k kurulu kapasitesiyle <strong>A\u015fa\u011f\u0131 Kalek\u00f6y Hidroelektrik Santrali<\/strong>, T\u00fcrkiye\u2019de \u00f6zel sekt\u00f6r taraf\u0131ndan yap\u0131lan santraller aras\u0131nda kurulu kapasite a\u00e7\u0131s\u0131ndan <strong>6&#8217;\u0131nc\u0131 s\u0131rada<\/strong> olacak.\u00a0Santral sayesinde yakla\u015f\u0131k <strong>bir milyon ki\u015fiye<\/strong> temiz enerji sa\u011flanacak.<\/p>\n<p><strong>Kalehan Enerji Grubu<\/strong> Genel M\u00fcd\u00fcr\u00fc <strong>G\u00fcltekin Kele\u015f<\/strong> konuyla ilgili olarak <span style=\"text-decoration: underline;\">\u015funlar\u0131 s\u00f6yledi:<\/span> &#8220;<em>T\u00fcrkiye bug\u00fcn hidroelektrikteki ekonomik potansiyelinin yaln\u0131zca <strong>%60<\/strong>&#8216;\u0131n\u0131 kullan\u0131yor. Kalehan Enerji olarak, ulusal hidroelektrik potansiyelini en verimli \u015fekilde kullanarak enerji talebini <strong>\u00e7evreye duyarl\u0131, temiz<\/strong> ve<strong> s\u00fcrd\u00fcr\u00fclebilir \u015fekilde<\/strong> kar\u015f\u0131layan <strong>A\u015fa\u011f\u0131 Kalek\u00f6y Hidroelektrik Santrali<\/strong>ni T\u00fcrkiye vizyonumuzu ger\u00e7e\u011fe d\u00f6n\u00fc\u015ft\u00fcrebilmek yolunda \u00e7ok \u00f6nemli bir kilometre ta\u015f\u0131 olarak g\u00f6r\u00fcyoruz. Hem <strong>beton baraj g\u00f6vdesi<\/strong>ne hem de<strong> asfalt \u00e7ekirdekli dolgu baraj<\/strong> yap\u0131s\u0131na sahip<strong> A\u015fa\u011f\u0131 Kalek\u00f6y Baraj\u0131, T\u00fcrkiye&#8217;<\/strong>nin kompozit baraj g\u00f6vdesine sahip ilk hidroelektrik santrali olma \u00f6zelli\u011fi ta\u015f\u0131yor. Ayr\u0131ca, ayn\u0131 lisans alt\u0131nda <strong>500 MW<\/strong> kapasiteli bir hidroelektrik ve<strong> 80 MW<\/strong> kapasiteli bir g\u00fcne\u015f enerjisi santrali bar\u0131nd\u0131ran A\u015fa\u011f\u0131 Kalek\u00f6y Santrali, T\u00fcrkiye&#8217;nin ilk hibrit santrali oldu.&#8221;<\/em><\/p>\n<p>GE Hidroelektrik Enerji \u00c7\u00f6z\u00fcmleri, santralde kullan\u0131lan t\u00fcrbinleri <strong>Brezilya<\/strong>&#8216;n\u0131n <strong>Taubate<\/strong> \u015fehrindeki \u00fcretim tesislerinde \u00fcretti. \u0130lk \u00fcnite <strong>May\u0131s 2020&#8217;de<\/strong> tamamland\u0131. <strong>2&#8217;inci<\/strong> ve <strong>3&#8217;\u00fcnc\u00fc<\/strong> \u00fcnitelerin ge\u00e7ti\u011fimiz y\u0131l\u0131n kas\u0131m ve aral\u0131k aylar\u0131nda tamamlanmas\u0131yla <strong>Kalehan Enerji<\/strong>, elektrik santralinin ticari faaliyetini ba\u015flatt\u0131. GE Yenilenebilir Enerji Hidroelektrik Enerji \u00c7\u00f6z\u00fcmleri CEO&#8217;su <strong>Pascal Radue<\/strong> <span style=\"text-decoration: underline;\">\u015funlar\u0131 belirtti:<\/span> <em>&#8220;<strong>A\u015fa\u011f\u0131 Kalek\u00f6y Hidroelektrik Santrali<\/strong>&#8216;nin ticari faaliyete ba\u015far\u0131yla ba\u015flamas\u0131n\u0131 sa\u011flayan Kalehan Enerji&#8217;yi ve katk\u0131da bulunan t\u00fcm taraflar\u0131 tebrik ediyorum. Santralin \u015fu anda \u00e7al\u0131\u015f\u0131r hale gelmesi, pandemiye ve getirdi\u011fi zorluklara ra\u011fmen projeyi tamamlayan t\u00fcm ekibin g\u00f6sterdi\u011fi ba\u011fl\u0131l\u0131\u011f\u0131n ve \u00f6zverinin a\u00e7\u0131k bir kan\u0131t\u0131d\u0131r.\u00a0T\u00fcrkiye&#8217;nin hidroelektrikte kaydetti\u011fi geli\u015fmelerin \u00f6n saflar\u0131nda <strong>GE Hidroelektrik Enerji \u00c7\u00f6z\u00fcmleri<\/strong>\u2019ni g\u00f6rmekten gurur duyuyorum. <strong>GE Yenilenebilir Enerji<\/strong> olarak, T\u00fcrkiye&#8217;de<strong> 20&#8217;inci y\u00fczy\u0131l\u0131n<\/strong> ba\u015flar\u0131ndan beri hizmete sunulan her be\u015f t\u00fcrbinden birini ve <strong>her 3 jenerat\u00f6rden<\/strong> birini biz temin ettik.&#8221;<\/em><\/p>\n<p><strong>A\u015fa\u011f\u0131 Kalek\u00f6y Santrali<\/strong>, <strong>GE<\/strong>&#8216;nin ayn\u0131 b\u00f6lgede <strong>Kalehan Enerji Grubu<\/strong> ile ger\u00e7ekle\u015ftirdi\u011fi \u00fc\u00e7\u00fcnc\u00fc proje olarak \u00f6ne \u00e7\u0131k\u0131yor. Daha \u00f6nce <strong>GE Hidroelektrik Enerji \u00c7\u00f6z\u00fcmleri, Beyhan-1<\/strong> ve <strong>Yukar\u0131 Kalek\u00f6y hidroelektrik santralleri<\/strong>ni tamamlad\u0131. T\u00fcrkiye hidroelektrik kaynaklar\u0131 bak\u0131m\u0131ndan son derece zengin bir \u00fclke. T\u00fcrkiye&#8217;nin kurulu hidroelektrik kapasitesi <strong>28,8 GW<\/strong> (8 GW nehir tipi, 20,8 rezervuar tipi) gibi \u00f6nemli bir seviyede ancak bu alan <strong>50 GW<\/strong>&#8216;a kadar \u00e7\u0131kabilecek bir ekonomik potansiyel ta\u015f\u0131yor. T\u00fcrkiye\u2019nin enerji ihtiyac\u0131 son <strong>15 y\u0131ll\u0131k d\u00f6nemde<\/strong> y\u0131lda ortalama <strong>%6<\/strong> oran\u0131nda artt\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. GE Yenilenebilir Enerji Hidroelektrik Enerji \u00c7\u00f6z\u00fcmleri, A\u015fa\u011f\u0131 Kalek\u00f6y projesine 155 MW kapasiteli 3 Francis t\u00fcrbini ve ilgili ekipman sa\u011flad\u0131. \u0130n\u015fas\u0131 tamamlanan hidroelektrik [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":129044,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[86289,85949,86288,86287,85950,19897,26043,1090,26044,7935,85951],"views":74,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/129042"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=129042"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/129042\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/129044"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=129042"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=129042"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=129042"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}