{"id":128871,"date":"2021-02-07T20:58:34","date_gmt":"2021-02-07T17:58:34","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=128871"},"modified":"2021-02-07T21:00:09","modified_gmt":"2021-02-07T18:00:09","slug":"almanya-2020-yilinda-4-880-mw-gunes-enerjisi-kapasitesi-ilave-etti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/almanya-2020-yilinda-4-880-mw-gunes-enerjisi-kapasitesi-ilave-etti\/","title":{"rendered":"(Turkish) &#8217;Almanya&#8217; 2020 Y\u0131l\u0131nda 4.880 MW G\u00fcne\u015f Enerjisi Kapasitesi \u0130lave Etti"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/128871\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>Almanya Federal A\u011f Ajans\u0131 Bundesnetzagentur&#8217;\u0131n (BNetzA) verilerinden derlenen bilgiye g\u00f6re, Almanya 2020&#8217;de yeni g\u00fcne\u015f enerjisi kapasitesi ilaveleri 4880 MW&#8217;a ula\u015f\u0131rken 2019 y\u0131l\u0131na g\u00f6re ise yakla\u015f\u0131k olarak 1 GW daha fazla art\u0131\u015f g\u00f6sterip 2020 <img loading=\"lazy\" class=\"alignright wp-image-128873\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/almanya-2020-de-4-880-mw-gunes-kapasitesi-ilave-etti.jpg\" alt=\"\" width=\"320\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/almanya-2020-de-4-880-mw-gunes-kapasitesi-ilave-etti.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/almanya-2020-de-4-880-mw-gunes-kapasitesi-ilave-etti-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/almanya-2020-de-4-880-mw-gunes-kapasitesi-ilave-etti-500x334.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/almanya-2020-de-4-880-mw-gunes-kapasitesi-ilave-etti-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/almanya-2020-de-4-880-mw-gunes-kapasitesi-ilave-etti-450x300.jpg 450w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>y\u0131l\u0131 ilave g\u00fcne\u015f enerjisi kapasiteleri ise 2012&#8217;den g\u00fcn\u00fcm\u00fcze en y\u00fcksek seviyeyi g\u00f6rm\u00fc\u015ft\u00fcr.<\/h1>\n<p>Derlenen veriler \u0131\u015f\u0131\u011f\u0131nda ise<strong> Almanya\u2019n\u0131n<\/strong> toplam \u015febekeye ba\u011fl\u0131<em> g\u00fcne\u015f enerjisi kapasitesi<\/em> <strong>2020<\/strong>&#8216;nin sonunda <strong>53,600 MW<\/strong>&#8216;a \u00e7\u0131km\u0131\u015ft\u0131r.<\/p>\n<p>2020 y\u0131l\u0131nda <strong>karasal (onshore) r\u00fczgar kapasitesi<\/strong>ndeki b\u00fcy\u00fcme <strong>1,500 MW<\/strong> olmu\u015f ve toplam kapasite <strong>54,900 MW<\/strong>&#8216;ye ula\u015fm\u0131\u015ft\u0131r. <strong>Deniz\u00fcst\u00fc (offshore) r\u00fczgar<\/strong> ise <strong>200 MW<\/strong> b\u00fcy\u00fcme ile toplam<strong> 7,700 MW<\/strong>&#8216;ye ula\u015ft\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Almanya Federal A\u011f Ajans\u0131 Bundesnetzagentur&#8217;\u0131n (BNetzA) verilerinden derlenen bilgiye g\u00f6re, Almanya 2020&#8217;de yeni g\u00fcne\u015f enerjisi kapasitesi ilaveleri 4880 MW&#8217;a ula\u015f\u0131rken 2019 y\u0131l\u0131na [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":128873,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[86143,86144,5070,52259,35038,28399,53157,35002,57125,54979],"views":93,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/128871"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=128871"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/128871\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/128873"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=128871"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=128871"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=128871"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}