{"id":128678,"date":"2021-02-05T14:13:08","date_gmt":"2021-02-05T11:13:08","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=128678"},"modified":"2021-02-05T14:13:08","modified_gmt":"2021-02-05T11:13:08","slug":"konya-nin-copleri-enerjiye-donusuyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/konya-nin-copleri-enerjiye-donusuyor\/","title":{"rendered":"(Turkish) Konya&#8217;n\u0131n \u00c7\u00f6pleri Enerjiye D\u00f6n\u00fc\u015f\u00fcyor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/128678\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Konya B\u00fcy\u00fck\u015fehir Belediyesi <\/strong>taraf\u0131ndanAsl\u0131m Kat\u0131 At\u0131k Sahas\u0131, Konya Entegre At\u0131k Bertaraf ve Enerji \u00dcretim Tesisi ile Ak\u015fehir Kat\u0131 At\u0131k D\u00fczenli Depolama Sahas\u0131nda yer alan \u00e7\u00f6plerden enerji \u00fcretiliyor.<\/h1>\n<p style=\"text-align: center;\"><img loading=\"lazy\" class=\"aligncenter wp-image-128680\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/konya-nin-copleri-enerjiye-donusuyor.jpg\" alt=\"\" width=\"550\" height=\"272\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/konya-nin-copleri-enerjiye-donusuyor.jpg 640w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/konya-nin-copleri-enerjiye-donusuyor-300x149.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/konya-nin-copleri-enerjiye-donusuyor-500x248.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/konya-nin-copleri-enerjiye-donusuyor-80x40.jpg 80w\" sizes=\"(max-width: 550px) 100vw, 550px\" \/><\/p>\n<p><strong>Konya B\u00fcy\u00fck\u015fehir Belediyesi<\/strong> Ba\u015fkan\u0131 <strong>U\u011fur \u0130brahim Altay<\/strong> konuya y\u00f6nelik yapt\u0131\u011f\u0131 a\u00e7\u0131klamada;\u00a0<em>Avrupa Birli\u011fi ile \u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131 deste\u011fiyle<strong> 1 milyon 720 bin metrekarelik<\/strong> alanda T\u00fcrkiye\u2019nin en b\u00fcy\u00fck<strong> \u00e7evre yat\u0131r\u0131mlar\u0131<\/strong>ndan birisi olan <strong>Konya Kat\u0131 At\u0131k Y\u00f6netimi Projesi<\/strong>\u2019ni hayata ge\u00e7irdik.\u00a0Tesislerimizde; <strong>kat\u0131 at\u0131k k\u00fctlesi<\/strong>nde olu\u015fan ve <strong>karbondioksite<\/strong> g\u00f6re <strong>21 kat<\/strong> daha fazla <strong>k\u00fcresel \u0131s\u0131nma potansiyeli<\/strong> olan <strong>metan gazlar\u0131,<\/strong> sahada <strong>a\u00e7\u0131lan gaz toplama kanallar\u0131ndan yatay<\/strong> ve <strong>dikey borulama sistemi<\/strong> ile toplan\u0131p<strong> gaz motorlar\u0131nda yak\u0131larak elektrik enerjisine<\/strong> d\u00f6n\u00fc\u015ft\u00fcr\u00fcl\u00fcyor.\u00a0<strong>2020<\/strong> y\u0131l\u0131nda <strong>78 milyon 294 bin 638 kilowatt elektrik \u00fcretimi<\/strong> ger\u00e7ekle\u015ftirdik. <strong>2011<\/strong>\u2019de <strong>Asl\u0131m<\/strong>\u2019da, <strong>2018<\/strong>\u2019de ise<strong> Ka\u015f\u0131nhan\u0131<\/strong> ve <strong>Ak\u015fehir<\/strong>\u2019de kurulan 3 tesisimizde bug\u00fcne kadar <strong>456 milyon 330 bin 518 kilowatt<\/strong> elektrik \u00fcretildi.&#8221; ifadelerini kulland\u0131.<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Konya B\u00fcy\u00fck\u015fehir Belediyesi taraf\u0131ndanAsl\u0131m Kat\u0131 At\u0131k Sahas\u0131, Konya Entegre At\u0131k Bertaraf ve Enerji \u00dcretim Tesisi ile Ak\u015fehir Kat\u0131 At\u0131k D\u00fczenli Depolama Sahas\u0131nda [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":128680,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[32530,52259,86004,86005,45106],"views":132,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/128678"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=128678"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/128678\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/128680"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=128678"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=128678"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=128678"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}