{"id":128609,"date":"2021-02-04T13:50:08","date_gmt":"2021-02-04T10:50:08","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=128609"},"modified":"2021-02-04T13:53:01","modified_gmt":"2021-02-04T10:53:01","slug":"500-mw-asagi-kalekoy-hidroelektrik-santrali-tam-kapasiteyle-faaliyete-gecti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/500-mw-asagi-kalekoy-hidroelektrik-santrali-tam-kapasiteyle-faaliyete-gecti\/","title":{"rendered":"(Turkish) 500 MW &#8216;A\u015fa\u011f\u0131 Kalek\u00f6y Hidroelektrik Santrali&#8217; Tam Kapasiteyle Faaliyette!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/128609\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>GE Yenilenebilir Enerji, Bing\u00f6l\u2019deki A\u015fa\u011f\u0131 Kalek\u00f6y Baraj\u0131 \u00fczerinde kurulan A\u015fa\u011f\u0131 Kalek\u00f6y Hidroelektrik Santrali&#8217;ni ba\u015far\u0131yla tamamlad\u0131. Santral, kalan son 3 \u00fcnitenin de \u015febekeye ba\u011flanmas\u0131yla tam kapasite faaliyete ge\u00e7ti.<\/h1>\n<p>Konsorsiyumun ba\u015f\u0131nda bulunan <strong>GE Hidroelektrik Enerji \u00c7\u00f6z\u00fcmleri<\/strong> proje i\u00e7in, kontrol sistemi, destek santral sistemleri ve hidroelektrik santral \u015falt sahas\u0131 dahil olmak \u00fczere, <strong>155 MW<\/strong> kapasiteli toplam <strong>3 adet<\/strong> dikey Francis t\u00fcrbin temin etti.<strong> 500 MW<\/strong>\u2019l\u0131k kurulu kapasitesiyle <strong>A\u015fa\u011f\u0131 Kalek\u00f6y Hidroelektrik Santrali<\/strong>, T\u00fcrkiye\u2019de \u00f6zel sekt\u00f6r taraf\u0131ndan yap\u0131lan santraller aras\u0131nda kurulu kapasite a\u00e7\u0131s\u0131ndan <strong>6&#8217;\u0131nc\u0131 s\u0131rada<\/strong> olacak. Santral sayesinde yakla\u015f\u0131k <strong>bir milyon ki\u015fiye<\/strong> temiz enerji sa\u011flanacak.<\/p>\n<p><strong><img loading=\"lazy\" class=\"alignright wp-image-128613\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/500-mw-asagi-kalekoy-hidroelektrik-santrali-tam-kapasiteyle-faaliyete-gecti.jpg\" alt=\"\" width=\"340\" height=\"255\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/500-mw-asagi-kalekoy-hidroelektrik-santrali-tam-kapasiteyle-faaliyete-gecti.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/500-mw-asagi-kalekoy-hidroelektrik-santrali-tam-kapasiteyle-faaliyete-gecti-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/500-mw-asagi-kalekoy-hidroelektrik-santrali-tam-kapasiteyle-faaliyete-gecti-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/500-mw-asagi-kalekoy-hidroelektrik-santrali-tam-kapasiteyle-faaliyete-gecti-67x50.jpg 67w\" sizes=\"(max-width: 340px) 100vw, 340px\" \/>Kalehan Enerji Grubu<\/strong> Genel M\u00fcd\u00fcr\u00fc <strong>G\u00fcltekin Kele\u015f<\/strong> konuyla ilgili olarak <span style=\"text-decoration: underline;\">\u015funlar\u0131 s\u00f6yledi:<\/span> &#8220;<em>T\u00fcrkiye bug\u00fcn hidroelektrikteki ekonomik potansiyelinin yaln\u0131zca <strong>%60<\/strong>&#8216;\u0131n\u0131 kullan\u0131yor. <strong>Kalehan Enerji<\/strong> olarak, ulusal hidroelektrik potansiyelini <strong>en verimli \u015fekilde kullanarak<\/strong> enerji talebini \u00e7evreye duyarl\u0131, temiz ve s\u00fcrd\u00fcr\u00fclebilir \u015fekilde kar\u015f\u0131layan <strong>A\u015fa\u011f\u0131 Kalek\u00f6y Hidroelektrik Santrali&#8217;<\/strong>ni T\u00fcrkiye vizyonumuzu ger\u00e7e\u011fe d\u00f6n\u00fc\u015ft\u00fcrebilmek yolunda \u00e7ok \u00f6nemli bir kilometre ta\u015f\u0131 olarak g\u00f6r\u00fcyoruz.. Hem beton baraj g\u00f6vdesine hem de <strong>asfalt \u00e7ekirdekli dolgu baraj yap\u0131s\u0131na<\/strong> sahip A\u015fa\u011f\u0131 Kalek\u00f6y Baraj\u0131, T\u00fcrkiye&#8217;nin kompozit baraj g\u00f6vdesine sahip ilk hidroelektrik santrali olma \u00f6zelli\u011fi ta\u015f\u0131yor. Ayr\u0131ca, ayn\u0131 lisans alt\u0131nda <strong>500 MW<\/strong> kapasiteli bir hidroelektrik ve<strong> 80 MW<\/strong> kapasiteli bir <strong>g\u00fcne\u015f enerjisi santrali<\/strong> bar\u0131nd\u0131ran <strong>A\u015fa\u011f\u0131 Kalek\u00f6y Santrali,<\/strong> T\u00fcrkiye&#8217;nin<strong> ilk hibrit santrali<\/strong> oldu.&#8221;<\/em><\/p>\n<p>GE Hidroelektrik Enerji \u00c7\u00f6z\u00fcmleri, santralde kullan\u0131lan t\u00fcrbinleri <strong>Brezilya<\/strong>&#8216;n\u0131n <strong>Taubate \u015fehri<\/strong>ndeki \u00fcretim tesislerinde \u00fcretti. \u0130lk \u00fcnite <strong>May\u0131s 2020<\/strong>&#8216;de tamamland\u0131. <strong>2&#8217;inci<\/strong> ve <strong>3&#8217;\u00fcnc\u00fc \u00fcnitelerin<\/strong> ge\u00e7ti\u011fimiz y\u0131l\u0131n kas\u0131m ve aral\u0131k aylar\u0131nda tamamlanmas\u0131yla <strong>Kalehan Enerji<\/strong>, elektrik santralinin ticari faaliyetini ba\u015flatt\u0131. <strong>GE Yenilenebilir Enerji Hidroelektrik Enerji \u00c7\u00f6z\u00fcmleri<\/strong> CEO&#8217;su <strong>Pascal Radue<\/strong> \u015funlar\u0131 belirtti: &#8220;<em>A\u015fa\u011f\u0131 Kalek\u00f6y Hidroelektrik Santrali&#8217;nin ticari faaliyete ba\u015far\u0131yla ba\u015flamas\u0131n\u0131 sa\u011flayan Kalehan Enerji&#8217;yi ve katk\u0131da bulunan t\u00fcm taraflar\u0131 tebrik ediyorum. Santralin \u015fu anda \u00e7al\u0131\u015f\u0131r hale gelmesi, pandemiye ve getirdi\u011fi zorluklara ra\u011fmen projeyi tamamlayan t\u00fcm ekibin g\u00f6sterdi\u011fi ba\u011fl\u0131l\u0131\u011f\u0131n ve \u00f6zverinin a\u00e7\u0131k bir kan\u0131t\u0131d\u0131r.<\/em> <em>T\u00fcrkiye&#8217;nin hidroelektrikte kaydetti\u011fi geli\u015fmelerin \u00f6n saflar\u0131nda <strong>GE Hidroelektrik Enerji \u00c7\u00f6z\u00fcmleri<\/strong>\u2019ni g\u00f6rmekten gurur duyuyorum. GE Yenilenebilir Enerji olarak, T\u00fcrkiye&#8217;de<strong> 20&#8217;inci y\u00fczy\u0131l\u0131n<\/strong> ba\u015flar\u0131ndan beri hizmete sunulan her<strong> 5 t\u00fcrbinden<\/strong> birini ve her <strong>3 jenerat\u00f6rden<\/strong> birini biz temin ettik.&#8221;<\/em><\/p>\n<p>A\u015fa\u011f\u0131 Kalek\u00f6y Santrali, GE&#8217;nin ayn\u0131 b\u00f6lgede <strong>Kalehan Enerji Grubu<\/strong> ile ger\u00e7ekle\u015ftirdi\u011fi <strong>3&#8217;\u00fcnc\u00fc proje<\/strong> olarak \u00f6ne \u00e7\u0131k\u0131yor. Daha \u00f6nce GE Hidroelektrik Enerji \u00c7\u00f6z\u00fcmleri, <strong>Beyhan-1 ve Yukar\u0131 Kalek\u00f6y hidroelektrik santralleri<\/strong>ni tamamlad\u0131. T\u00fcrkiye hidroelektrik kaynaklar\u0131 bak\u0131m\u0131ndan son derece zengin bir \u00fclke. T\u00fcrkiye&#8217;nin kurulu hidroelektrik kapasitesi <strong>28,8 GW<\/strong> (8 GW nehir tipi, 20,8 rezervuar tipi) gibi \u00f6nemli bir seviyede ancak bu alan <strong>50 GW&#8217;a<\/strong> kadar \u00e7\u0131kabilecek bir ekonomik potansiyel ta\u015f\u0131yor. T\u00fcrkiye\u2019nin enerji ihtiyac\u0131 <strong>son 15 y\u0131ll\u0131k d\u00f6nemde<\/strong> y\u0131lda ortalama <strong>%6<\/strong> oran\u0131nda artt\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. GE Yenilenebilir Enerji, Bing\u00f6l\u2019deki A\u015fa\u011f\u0131 Kalek\u00f6y Baraj\u0131 \u00fczerinde kurulan A\u015fa\u011f\u0131 Kalek\u00f6y Hidroelektrik Santrali&#8217;ni ba\u015far\u0131yla tamamlad\u0131. Santral, kalan son 3 \u00fcnitenin de \u015febekeye [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":128613,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[85957,85949,85958,52259,85950,19897,85955,85956,26043,26044,85953,85951,85952,85954,54979],"views":145,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/128609"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=128609"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/128609\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/128613"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=128609"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=128609"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=128609"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}