{"id":128430,"date":"2021-02-01T16:25:13","date_gmt":"2021-02-01T13:25:13","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=128430"},"modified":"2021-02-01T16:26:49","modified_gmt":"2021-02-01T13:26:49","slug":"guyad-yeni-yekdem-beklentileri-karsilamaktan-uzak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/guyad-yeni-yekdem-beklentileri-karsilamaktan-uzak\/","title":{"rendered":"(Turkish) G\u00fcyad: \u201cYeni YEKDEM Beklentileri Kar\u015f\u0131lamaktan Uzak\u201d"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/128430\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1>G\u00dcYAD, 30 Ocak 2021 tarihli Resmi Gazete\u2019de yay\u0131mlanarak y\u00fcr\u00fcrl\u00fc\u011fe giren yeni YEKDEM mekanizmas\u0131n\u0131n \u2018a\u00e7\u0131klamay\u0131 heyecanla bekleyen yat\u0131r\u0131mc\u0131lar\u0131n beklentilerini kar\u015f\u0131lamaktan uzak\u2019 oldu\u011fu de\u011ferlendirmesinde bulundu.<\/h1>\n<p><strong>Yenilenebilir enerji yat\u0131r\u0131mlar\u0131<\/strong>n\u0131n sermaye yo\u011fun yat\u0131r\u0131mlar oldu\u011funu hat\u0131rlatan G\u00dcYAD Ba\u015fkan\u0131 <strong>Cem \u00d6zk\u00f6k<\/strong>, yeni mekanizma ile ilgili olarak <em>\u201cYat\u0131r\u0131mc\u0131lar\u0131m\u0131z\u0131n beklentileri \u00f6zellikle daha y\u00fcksek bir <img loading=\"lazy\" class=\"alignright wp-image-128433\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/guyad-yeni-yekdem-beklentileri-karsilamaktan-uzak.jpg\" alt=\"\" width=\"340\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/guyad-yeni-yekdem-beklentileri-karsilamaktan-uzak.jpg 550w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/guyad-yeni-yekdem-beklentileri-karsilamaktan-uzak-300x177.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/guyad-yeni-yekdem-beklentileri-karsilamaktan-uzak-500x295.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/02\/guyad-yeni-yekdem-beklentileri-karsilamaktan-uzak-80x47.jpg 80w\" sizes=\"(max-width: 340px) 100vw, 340px\" \/>ba\u015flang\u0131\u00e7 fiyat\u0131 idi. <strong>Yeni YEKDEM<\/strong>\u2019de uygulanacak eskalasyonun<strong> % 48<\/strong> d\u00f6vize dayal\u0131 olacak olmas\u0131 projelerin finanse edilebilirli\u011fi y\u00f6n\u00fcnden \u00f6nemli bir katk\u0131 ancak yeterli de\u011fil. A\u00e7\u0131klanan rakamlar yeni yat\u0131r\u0131m yapma kararlar\u0131n\u0131 te\u015fvik edici olmaktan uzak kald\u0131\u201d \u015feklinde konu\u015ftu. <\/em>Global ekonomik belirsizlikler <strong>g\u00fcnden g\u00fcne artar<\/strong> ve <strong>hammadde fiyatlar\u0131<\/strong> y\u00fckselirken desteklerin <strong>% 60<\/strong>\u2019tan fazla d\u00fc\u015f\u00fcr\u00fclmesinin yat\u0131r\u0131mc\u0131y\u0131 zorda b\u0131rakt\u0131\u011f\u0131n\u0131 belirten \u00d6zk\u00f6k,<em> \u201cPandemi \u00f6ncesinde bile finansman bulmakta zorlanan sekt\u00f6r, finansman maliyetinin eskiye nazaran \u00f6nemli \u00f6l\u00e7\u00fcde artt\u0131\u011f\u0131 bu d\u00f6nemde yat\u0131r\u0131m kararlar\u0131n\u0131 yeniden g\u00f6zden ge\u00e7irmek zorunda kalacak\u201d<\/em> \u015feklinde konu\u015ftu.<\/p>\n<h2><strong>\u201c\u00d6zellikle JES\u2019lerde yap\u0131labilirlik kalmad\u0131\u201d<\/strong><\/h2>\n<p>\u201cA\u00e7\u0131klanan fiyatlarla ne yaz\u0131k ki <strong>jeotermal santrallerde yat\u0131r\u0131m<\/strong> yapma imkan\u0131 kalmam\u0131\u015ft\u0131r\u201d diyen \u00d6zk\u00f6k, bu ba\u015flang\u0131\u00e7 rakamlar\u0131 ile <strong>JES yat\u0131r\u0131mlar\u0131n\u0131n<\/strong> ger\u00e7ekle\u015ftirilmesinin m\u00fcmk\u00fcn olmad\u0131\u011f\u0131n\u0131 belirterek <strong>jeotermal alan\u0131ndaki<\/strong> b\u00fct\u00fcn yat\u0131r\u0131mc\u0131lar\u0131n <strong>projeksiyonlar\u0131n\u0131<\/strong> ve <strong>fizibilite raporlar\u0131n\u0131<\/strong> <strong>yeniden g\u00f6zden ge\u00e7irdi\u011finin<\/strong> alt\u0131n\u0131 \u00e7izdi.<\/p>\n<h2><strong>\u201cRES ve GES\u2019ler i\u00e7in kapasite fakt\u00f6r\u00fc \u00e7ok \u00f6nemli hale geldi\u201d<\/strong><\/h2>\n<p><strong>Destek rakamlar\u0131n\u0131n d\u00fc\u015fmesi<\/strong> ile birlikte <strong>RES<\/strong> ve <strong>GES<\/strong>\u2019lerde kapasite fakt\u00f6r\u00fcn\u00fcn o\u0308n plana c\u0327\u0131kt\u0131\u011f\u0131n\u0131 vurgulayan <strong>Cem \u00d6zk\u00f6k<\/strong>, <em>\u201cBu santrallerin yap\u0131labilirli\u011fi kapasite fakto\u0308ru\u0308ne bag\u0306l\u0131 hale geldi. Bunun sonucu <strong>yenilenebilir enerji santrallerinin<\/strong> belirli b\u00f6lgelere toplanmas\u0131 olacakt\u0131r. <strong>TEI\u0307AS\u0327 kapasite<\/strong> haritas\u0131na bakacak olursak o\u0308zellikle <strong>RES\u2019lerde<\/strong> kapasite fakto\u0308ru\u0308 yu\u0308ksek olan alanlara daha fazla santral yap\u0131lma imkan\u0131n\u0131n olmad\u0131g\u0306\u0131n\u0131 go\u0308ru\u0308ru\u0308z\u201d<\/em> uyar\u0131s\u0131nda bulundu.<\/p>\n<p>\u00d6zk\u00f6k, bu kos\u0327ullar alt\u0131nda <strong>yenilenebilir enerji<\/strong> ic\u0327in belirlenmis\u0327 hedeflere ulas\u0327\u0131lmas\u0131n\u0131n oldukc\u0327a zorla\u015ft\u0131\u011f\u0131na dikkat \u00e7ekti.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. G\u00dcYAD, 30 Ocak 2021 tarihli Resmi Gazete\u2019de yay\u0131mlanarak y\u00fcr\u00fcrl\u00fc\u011fe giren yeni YEKDEM mekanizmas\u0131n\u0131n \u2018a\u00e7\u0131klamay\u0131 heyecanla bekleyen yat\u0131r\u0131mc\u0131lar\u0131n beklentilerini kar\u015f\u0131lamaktan uzak\u2019 oldu\u011fu de\u011ferlendirmesinde [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":128433,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[44797,1009,35038,53157,85839,83074,35002,53282,85840,54979,85838,1245],"views":158,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/128430"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=128430"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/128430\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/128433"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=128430"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=128430"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=128430"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}