{"id":12830,"date":"2013-07-08T19:44:57","date_gmt":"2013-07-08T16:44:57","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=12830"},"modified":"2021-02-07T20:19:36","modified_gmt":"2021-02-07T17:19:36","slug":"boydak-enerji-1000-mw-kurulu-guc-hedefliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/boydak-enerji-1000-mw-kurulu-guc-hedefliyor\/","title":{"rendered":"(Turkish) Boydak Enerji, 1000 MW Kurulu G\u00fc\u00e7 Hedefliyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/12830\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Boydak Enerji, 400 MW`si proje halinde olmak \u00fczere 1000 MW`lik kurulu g\u00fc\u00e7 hedefliyor. Boydak Enerji Genel M\u00fcd\u00fcr\u00fc G\u00fcltekin Eran\u0131l, D\u00dcNYA`ya yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, grup i\u00e7inde en \u00e7ok yat\u0131r\u0131m yap\u0131lan sekt\u00f6r\u00fcn enerji oldu\u011funu belirterek &#8220;Enerji \u015firketimizin, grubumuzun gelecekteki lokomotif \u015firketlerinden birisi olmas\u0131n\u0131 \u00fcmit ediyoruz&#8221; dedi.<\/strong><\/h1>\n<p>Mehmet Kara&#8217;n\u0131n sorular\u0131n\u0131 cevaplayan Eran\u0131l, 2011 ve 2012`nin Boydak Enerji`nin katlanarak b\u00fcy\u00fcd\u00fc\u011f\u00fc y\u0131llar olarak ge\u00e7ti\u011fini belirtirken &#8220;1000 MW kurulu g\u00fc\u00e7 hedefiyle \u00e7\u0131kt\u0131\u011f\u0131m\u0131z yolda bug\u00fcn itibariyle ula\u015ft\u0131\u011f\u0131m\u0131z yakla\u015f\u0131k 400 MW proje portf\u00f6y, T\u00fcrkiye\u2019ye ve T\u00fcrkiye enerji sekt\u00f6r\u00fcn\u00fcn gelece\u011fine g\u00fcvenimizin en b\u00fcy\u00fck g\u00f6stergesidir&#8221; diye konu\u015ftu. Eran\u0131l, uzun vadeli planlar yap\u0131p, portf\u00f6y havuzunu her a\u015famada gelecekteki alternatif senaryolara g\u00f6re sim\u00fcle edip, elde ettikleri sonu\u00e7lara g\u00f6re hareket ettiklerini vurgulad\u0131.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/boydak-enerji-1000-mw-kurulu-guc-hedefliyor.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-12831\" title=\"boydak-enerji-1000-mw-kurulu-guc-hedefliyor\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/boydak-enerji-1000-mw-kurulu-guc-hedefliyor-300x193.jpg\" alt=\"\" width=\"300\" height=\"193\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/boydak-enerji-1000-mw-kurulu-guc-hedefliyor-300x193.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/boydak-enerji-1000-mw-kurulu-guc-hedefliyor-500x322.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/boydak-enerji-1000-mw-kurulu-guc-hedefliyor-77x50.jpg 77w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/boydak-enerji-1000-mw-kurulu-guc-hedefliyor.jpg 621w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<h2><strong>1000 MW KURULU G\u00dc\u00c7<\/strong><\/h2>\n<p>Sekt\u00f6rde bug\u00fcne kadar yakla\u015f\u0131k 500 milyon dolar yat\u0131r\u0131m yapt\u0131klar\u0131n\u0131 belirten G\u00fcltekin Eran\u0131l \u015funlar\u0131 s\u00f6yledi:<br \/>\n&#8220;Devrede olan 150 MW kurulu g\u00fcc\u00fcndeki hidroelektrik santrallerimiz, yap\u0131m ve projelendirme a\u015famalar\u0131 devam eden 225 MW kurulu g\u00fcc\u00fcndeki r\u00fczgar santrallerimizle \u00fcretim taraf\u0131nda elektrik piyasas\u0131n\u0131n \u00f6nemli oyuncular\u0131ndan biri haline gelmeyi hedefliyoruz. 1000 MW kurulu g\u00fc\u00e7 hedefimize giden yolda ilk olarak 500 MW b\u00fcy\u00fckl\u00fc\u011f\u00fcndeki bir portf\u00f6y\u00fc 2015 y\u0131l\u0131na kadar devreye almay\u0131 planl\u0131yoruz.&#8221;<\/p>\n<h2><strong>\u00c7ANTA RES SONBAHARDA DEVREDE<\/strong><\/h2>\n<p>Eran\u0131l, Boydak Enerji`nin devam eden yat\u0131r\u0131mlar\u0131n\u0131n faaliyete ge\u00e7i\u015f takvimlerini \u015f\u00f6yle a\u00e7\u0131klad\u0131:<br \/>\n&#8220;Yat\u0131r\u0131m\u0131 devam eden 45 MW \u00c7anta RES r\u00fczgar santralimizi bu y\u0131l\u0131n son \u00e7eyre\u011finde devreye almay\u0131 planl\u0131yoruz. \u0130zin s\u00fcre\u00e7leri devam eden 100 MW \u00d6merli RES ve 80 MW Sibel RES projelerimizi de 2014 y\u0131l\u0131 sonunda devreye almay\u0131 hedefliyoruz. Yine ayn\u0131 \u015fekilde in\u015faatlar\u0131nda son a\u015famaya gelinen 24 MW Umut II HES ve 5 MW Yayla HES projelerimizin de bu y\u0131l\u0131n \u00fc\u00e7\u00fcnc\u00fc \u00e7eyre\u011finde devreye al\u0131nmas\u0131 planlan\u0131yor.&#8221;<\/p>\n<h2><strong>\u00d6NEML\u0130 OYUNCULUK HEDEF\u0130<\/strong><\/h2>\n<p>G\u00fcltekin Eran\u0131l, Boydak Grubu`nun T\u00fcrkiye enerji pazar\u0131nda kendisine bi\u00e7ti\u011fi rol\u00fc ve hedefledi\u011fi konumu ise \u015f\u00f6yle \u00f6zetledi:<br \/>\n&#8220;A\u011f\u0131rl\u0131kl\u0131 yenilenebilir enerji kaynaklar\u0131ndan olu\u015fan \u015fimdilik 1000 MW\u2019l\u0131k bir portf\u00f6y ile esnek ve rekabet\u00e7i bir enerji \u00fcretim ve sat\u0131\u015f \u015firketi ile T\u00fcrkiye Elektrik Piyasas\u0131\u2019n\u0131n \u00f6nemli oyuncular\u0131ndan birisi olarak yerimizi almak istiyoruz.&#8221;<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/boydak-enerji-1000-mw-kurulu-guc-hedefliyor_4125.html\" target=\"_blank\" rel=\"nofollow noopener\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Boydak Enerji, 400 MW`si proje halinde olmak \u00fczere 1000 MW`lik kurulu g\u00fc\u00e7 hedefliyor. Boydak Enerji Genel M\u00fcd\u00fcr\u00fc G\u00fcltekin Eran\u0131l, D\u00dcNYA`ya yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":12831,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47,50],"tags":[6698,63,67,165,1011,6699,35370,1090,474,231,105],"views":1172,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12830"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=12830"}],"version-history":[{"count":4,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12830\/revisions"}],"predecessor-version":[{"id":12835,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12830\/revisions\/12835"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/12831"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=12830"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=12830"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=12830"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}