{"id":12805,"date":"2013-07-08T10:43:59","date_gmt":"2013-07-08T07:43:59","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=12805"},"modified":"2013-07-08T10:44:14","modified_gmt":"2013-07-08T07:44:14","slug":"4-hes-projesi-daha-ced-raporu-aldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/4-hes-projesi-daha-ced-raporu-aldi\/","title":{"rendered":"(Turkish) 4 HES Projesi Daha \u00c7ED Raporu Ald\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/12805\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>K\u00fcbra, F\u0131nd\u0131kl\u0131, \u00dclk\u00fcn ve Ta\u015fl\u0131te<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/Kurtun-HES-HI-986198.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-12806\" title=\"Kurtun-HES--HI-986198\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/Kurtun-HES-HI-986198-300x198.jpg\" alt=\"\" width=\"300\" height=\"198\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/Kurtun-HES-HI-986198-300x198.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/Kurtun-HES-HI-986198-500x330.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/Kurtun-HES-HI-986198-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/Kurtun-HES-HI-986198.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>pe hidroelektrik santrali projelerinin \u00e7evresel etki de\u011ferlendirme (\u00c7ED) raporlar\u0131 onayland\u0131.\u00a0<\/strong><\/p>\n<p>\u00c7evresel Etki De\u011ferlendirme (\u00c7ED) Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc, 4 adet Hidroelektrik Santral\u0131 (HES) Projesi\u2019ne daha \u00c7ED olumlu karar\u0131 verdi. Projeler hakk\u0131nda nihai hale getirilen \u00c7ED raporlar\u0131n\u0131n onaylanm\u0131\u015f oldu\u011fu belirlendi. HES\u2019ler i\u00e7in yat\u0131r\u0131mc\u0131lar\u0131n di\u011fer y\u00fck\u00fcml\u00fcl\u00fcklerini yerine getirmesi ard\u0131ndan lisanslar\u0131n\u0131 almalar\u0131 bekleniyor.<\/p>\n<div><\/div>\n<div><\/div>\n<div>\u00c7ED Raporu verilen s\u00f6z konusu HES\u2019ler ve proje sahibi \u015firketler \u015f\u00f6yle;<\/div>\n<div>&#8211; K\u00fcbra Enerji, 34,17 MW\u2019l\u0131k Erzurum K\u00fcbra Reg. ve HES<\/div>\n<div>&#8211; Y\u0131lbatu Elektrik, 30,9 MW\u2019l\u0131k Erzincan F\u0131nd\u0131kl\u0131 Baraj\u0131 ve HES<\/div>\n<div>&#8211; D\u00fcnya Enerji, 16,2 MW\u2019l\u0131k \u00dclk\u00fcn HES Projesi<\/div>\n<div>&#8211; Enerjiksu Enerji, 17,6 MW\u2019l\u0131k Ta\u015fl\u0131tepe Reg. ve HES Projesi<\/div>\n<div><\/div>\n<div>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/4-hes-projesi-daha-ced-raporu-aldi_4123.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.K\u00fcbra, F\u0131nd\u0131kl\u0131, \u00dclk\u00fcn ve Ta\u015fl\u0131tepe hidroelektrik santrali projelerinin \u00e7evresel etki de\u011ferlendirme (\u00c7ED) raporlar\u0131 onayland\u0131.\u00a0 \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc, 4 adet Hidroelektrik [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":12806,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[6680,4275,63,67,165,6676,35370,6679,6675,6678,6677],"views":1141,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12805"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=12805"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12805\/revisions"}],"predecessor-version":[{"id":12808,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12805\/revisions\/12808"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/12806"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=12805"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=12805"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=12805"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}