{"id":12794,"date":"2013-07-07T21:15:53","date_gmt":"2013-07-07T18:15:53","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=12794"},"modified":"2013-07-07T21:15:53","modified_gmt":"2013-07-07T18:15:53","slug":"turkiye-kurulu-enerji-gucu-60-bin-mw","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiye-kurulu-enerji-gucu-60-bin-mw\/","title":{"rendered":"(Turkish) T\u00fcrkiye Kurulu Enerji G\u00fcc\u00fc 60 Bin MW!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/12794\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>TE\u0130A\u015e taraf\u0131ndan yay\u0131nlanan verilere g\u00f6re 30 Haziran 2013 sonu itibari ile T\u00fcrkiye kurulu elektrik g\u00fcc\u00fc 60.121 MW kapasiteye ula\u015ft\u0131. Bu de\u011fer 2012 sonunda 57.059 MW idi. 2013 y\u0131l\u0131nda devreye giren 3.061 MW\u2019l\u0131k yeni kapasitenin b\u00fcy\u00fck b\u00f6l\u00fcm\u00fcn\u00fc toplam\u00a01.924 MW kapasiteye sahip do\u011falgaz santralleri olu\u015fturuyor.<\/strong><\/p>\n<p>Do\u011falgaz santrallerinde ciddi art\u0131\u015f\u0131n sebebi ge\u00e7en ay devreye giren RWE&amp;TURCAS ve OMV Samsun do\u011falgaz kombine \u00e7evrim santralleri oldu. Ayr\u0131ca 543 MW hidrolik akarsu ve 294 MW hidrolik barajl\u0131 santral devreye girdi. Son durum itibari ile kurulu g\u00fcc\u00fcn kurulu\u015flara ve yak\u0131t cinslerine g\u00f6re da\u011f\u0131l\u0131mlar\u0131 \u015f\u00f6yle;<\/p>\n<p><a href=\"http:\/\/enerjienstitusu.com\/medya\/turkiye-kurulu-elektrik-gucu-2013.jpg\"><img loading=\"lazy\" class=\"aligncenter\" src=\"http:\/\/enerjienstitusu.com\/medya\/turkiye-kurulu-elektrik-gucu-2013.jpg\" alt=\"turkiye kurulu elektrik gucu 2013\" width=\"458\" height=\"267\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p><a href=\"http:\/\/enerjienstitusu.com\/medya\/turkiye-kurulu-enerji-gucu-toplam-2013.jpg\"><img loading=\"lazy\" class=\"aligncenter\" src=\"http:\/\/enerjienstitusu.com\/medya\/turkiye-kurulu-enerji-gucu-toplam-2013.jpg\" alt=\"turkiye kurulu enerji gucu toplam 2013\" width=\"459\" height=\"350\" \/><\/a><\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2013\/07\/07\/turkiye-kurulu-elektrik-gucu-60-bin-mw\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.TE\u0130A\u015e taraf\u0131ndan yay\u0131nlanan verilere g\u00f6re 30 Haziran 2013 sonu itibari ile T\u00fcrkiye kurulu elektrik g\u00fcc\u00fc 60.121 MW kapasiteye ula\u015ft\u0131. Bu de\u011fer 2012 sonunda [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":12795,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,51,53,49,47,48,43,44,50],"tags":[92,2555,63,67,165,35370,1090,58,1675,6674,2012,69,1582,846,105],"views":970,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12794"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=12794"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12794\/revisions"}],"predecessor-version":[{"id":12797,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12794\/revisions\/12797"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/12795"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=12794"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=12794"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=12794"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}