{"id":12778,"date":"2013-07-06T11:36:43","date_gmt":"2013-07-06T08:36:43","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=12778"},"modified":"2013-07-06T11:36:50","modified_gmt":"2013-07-06T08:36:50","slug":"isiksu-enerji-cakmakli-dogalgaz-santralina-ced-raporu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/isiksu-enerji-cakmakli-dogalgaz-santralina-ced-raporu\/","title":{"rendered":"(Turkish) I\u015f\u0131ksu Enerji \u00c7akmakl\u0131 Do\u011falgaz Santral\u0131\u2019na \u00c7ED Raporu"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/12778\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Kolin Grubu\u2019na ba\u011fl\u0131 I\u015f\u0131ksu Enerji firmas\u0131n\u0131n \u0130zmir Alia\u011fa\u2019da kuraca\u011f\u0131 \u00c7akm<\/strong><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/isiksu-enerji-cakmakli-dogalgaz-santralina-ced-raporu.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-12779\" title=\"isiksu-enerji-cakmakli-dogalgaz-santralina-ced-raporu\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/isiksu-enerji-cakmakli-dogalgaz-santralina-ced-raporu-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/isiksu-enerji-cakmakli-dogalgaz-santralina-ced-raporu-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/isiksu-enerji-cakmakli-dogalgaz-santralina-ced-raporu-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/isiksu-enerji-cakmakli-dogalgaz-santralina-ced-raporu-66x50.jpg 66w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/07\/isiksu-enerji-cakmakli-dogalgaz-santralina-ced-raporu.jpg 900w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><strong>akl\u0131 Do\u011falgaz Santral\u0131\u2019na \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) Raporu verildi.<\/strong><\/p>\n<p>\u00c7ED Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc\u2019n\u00fcn ge\u00e7ti\u011fimiz g\u00fcnlerde ald\u0131\u011f\u0131 karar ile 420 MW\u2019l\u0131k Do\u011falgaz Kombine \u00c7evrim Santral\u0131\u2019n\u0131n Armada Dan\u0131\u015fmanl\u0131k firmas\u0131nca haz\u0131rlanan \u00c7ED ba\u015fvurusu i\u00e7in \u00c7ED olumlu karar\u0131 al\u0131nd\u0131.<\/p>\n<p>Enerji Piyasas\u0131 D\u00fczenleme Kurumu (EPDK) taraf\u0131ndan da lisans verilmesi i\u00e7in \u00e7al\u0131\u015fmalar\u0131n devam etti\u011fi ve \u00c7ED olumlu karar\u0131 ile birlikte di\u011fer gerekli belgelerini sunmas\u0131 ile EPDK taraf\u0131ndan \u00fcretim lisans\u0131n\u0131n verilmesinin beklendi\u011fi bildiriliyor.<\/p>\n<p>Santral i\u00e7in gerekli t\u00fcm belgelerin haz\u0131r olmas\u0131 halinde lisans\u0131n\u0131 alacak olup, imar izni, proje onay\u0131 gibi konularda s\u00fcreye ihtiya\u00e7 duymas\u0131 halinde firmaya ilk etapta \u00f6nlisans\u0131 verilecek.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/isiksu-enerji-cakmakli-dogalgaz-santralina-ced-rap_4094.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Kolin Grubu\u2019na ba\u011fl\u0131 I\u015f\u0131ksu Enerji firmas\u0131n\u0131n \u0130zmir Alia\u011fa\u2019da kuraca\u011f\u0131 \u00c7akmakl\u0131 Do\u011falgaz Santral\u0131\u2019na \u00c7evresel Etki De\u011ferlendirme (\u00c7ED) Raporu verildi. \u00c7ED Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc\u2019n\u00fcn ge\u00e7ti\u011fimiz g\u00fcnlerde [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":12779,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[5465,92,226,4725,63,67,1046,165,750,6658,6659,6660],"views":973,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12778"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=12778"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12778\/revisions"}],"predecessor-version":[{"id":12782,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12778\/revisions\/12782"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/12779"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=12778"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=12778"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=12778"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}