{"id":127737,"date":"2021-01-22T16:04:42","date_gmt":"2021-01-22T13:04:42","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=127737"},"modified":"2021-01-22T16:04:42","modified_gmt":"2021-01-22T13:04:42","slug":"dinar-belediyesi-enerjisini-gunesten-alacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/dinar-belediyesi-enerjisini-gunesten-alacak\/","title":{"rendered":"(Turkish) &#8217;Dinar Belediyesi&#8217; Enerjisini G\u00fcne\u015f&#8217;ten Alacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/127737\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h1><strong>Afyon&#8217;un Dinar Belediyesi kurulumunu yapaca\u011f\u0131 G\u00fcne\u015f Enerji Santrali&#8217;nin (GES) proje a\u015famas\u0131 s\u00fcrerken Belediye, 1.2 MW <img loading=\"lazy\" class=\"alignright wp-image-127739\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/01\/dinar-belediyesi-enerjisini-gunesten-alacak.jpg\" alt=\"\" width=\"320\" height=\"205\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/01\/dinar-belediyesi-enerjisini-gunesten-alacak.jpg 679w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/01\/dinar-belediyesi-enerjisini-gunesten-alacak-300x192.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/01\/dinar-belediyesi-enerjisini-gunesten-alacak-500x320.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2021\/01\/dinar-belediyesi-enerjisini-gunesten-alacak-78x50.jpg 78w\" sizes=\"(max-width: 320px) 100vw, 320px\" \/>g\u00fcce sahip santralle enerji \u00fcretimi ger\u00e7ekle\u015ftirecek.<\/strong><\/h1>\n<p><strong>Dinar Belediyesi<\/strong>\u2019nin kuraca\u011f\u0131 <strong>g\u00fcne\u015f enerji santralinde (GES)<\/strong>\u00a0proje a\u015famas\u0131na ge\u00e7ilirken <strong>Dinar Belediyesi Ar\u0131tma Tesisi<\/strong>&#8216;nin yan\u0131nda konumlanacak olan alanda yer alacak olan <strong>g\u00fcne\u015f enerji panelleri<\/strong>ne sahip tesisle belediye, kendi enerjisini \u00fcretecek olup <strong>elektrik tasarrufu noktas\u0131nda<\/strong> \u00f6nemli bir katk\u0131da sa\u011flanacak.<\/p>\n<p>B\u00f6ylece Belediye, enerji alan\u0131nda yapaca\u011f\u0131 <strong>katk\u0131<\/strong>\u00a0ve tasarruf ile birlikte <strong>elektrik da\u011f\u0131t\u0131m \u015firketi<\/strong> ile mahsupla\u015fma yaparak artan<strong> enerji \u00fcretim bedeli<\/strong> maliyetini de belediye b\u00fct\u00e7esine kazand\u0131racak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Afyon&#8217;un Dinar Belediyesi kurulumunu yapaca\u011f\u0131 G\u00fcne\u015f Enerji Santrali&#8217;nin (GES) proje a\u015famas\u0131 s\u00fcrerken Belediye, 1.2 MW g\u00fcce sahip santralle enerji \u00fcretimi ger\u00e7ekle\u015ftirecek. Dinar [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":127739,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[79956,85272,85271,85273,5070,52259,85274,52435,53157,54979],"views":162,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/127737"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=127737"}],"version-history":[{"count":0,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/127737\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/127739"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=127737"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=127737"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=127737"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}