{"id":12704,"date":"2013-07-04T10:19:50","date_gmt":"2013-07-04T07:19:50","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=12704"},"modified":"2013-07-04T10:20:50","modified_gmt":"2013-07-04T07:20:50","slug":"trakyaya-hes-yapimi-icin-ilk-adim-atildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/trakyaya-hes-yapimi-icin-ilk-adim-atildi\/","title":{"rendered":"(Turkish) Trakya\u2019ya HES Yap\u0131m\u0131 \u0130\u00e7in \u0130lk Ad\u0131m At\u0131ld\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/12704\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Ergene havzas\u0131n\u0131n kurtar\u0131lmas\u0131 ve hidroelektrik santrali kurulmas\u0131 amac\u0131yla yap\u0131lacak \u00e7al\u0131<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/HES-firsat-esitligi.jpg\"><img loading=\"lazy\" class=\"alignright  wp-image-7783\" title=\"HES-yap\u0131m\u0131-i\u00e7in-trakya-da-ilk-ad\u0131m\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/HES-firsat-esitligi-300x219.jpg\" alt=\"\" width=\"300\" height=\"178\" \/><\/a>\u015fmalar \u00e7er\u00e7evesinde b\u00f6lgedeki baz\u0131 ta\u015f\u0131nmazlar\u0131n kamula\u015ft\u0131r\u0131lmas\u0131 kararla\u015ft\u0131r\u0131ld\u0131.\u00a0<\/strong><\/p>\n<p>Trakya\u2019ya Hidroelektrik Santrali (HES) yap\u0131lmas\u0131 i\u00e7in ilk resmi ad\u0131m at\u0131ld\u0131. Bakanlar Kurulu, Trakya\u2019da Ergene Havzas\u0131 olarak bilinen b\u00f6lgeye Ergene Havzas\u0131 Ar\u0131tma Sistemi Projesi kapsam\u0131nda Marmara Denizi Derin De\u015farj Hatt\u0131, At\u0131ksu Ar\u0131tma Tesisleri, Sanat Yap\u0131lar\u0131 ve \u2018HES\u2019 yap\u0131m\u0131 i\u00e7in Devlet Su \u0130\u015fleri\u2019ne kamula\u015ft\u0131rma yetkisi verdi. Resmi Gazete`de yay\u0131nlanan s\u00f6z konusu kararla birlikte Trakya b\u00f6lgesinde hidroelektrik santrali (HES) yap\u0131m\u0131 i\u00e7in ilk resmi ad\u0131m da at\u0131lm\u0131\u015f oldu. 2011 y\u0131l\u0131ndan bu yana HES yap\u0131m\u0131 i\u00e7in projeler geli\u015ftirilen Trakya\u2019da hi\u00e7 HES bulunmuyor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/trakyaya-hes-yapimi-icin-ilk-adim-atildi_4092.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Ergene havzas\u0131n\u0131n kurtar\u0131lmas\u0131 ve hidroelektrik santrali kurulmas\u0131 amac\u0131yla yap\u0131lacak \u00e7al\u0131\u015fmalar \u00e7er\u00e7evesinde b\u00f6lgedeki baz\u0131 ta\u015f\u0131nmazlar\u0131n kamula\u015ft\u0131r\u0131lmas\u0131 kararla\u015ft\u0131r\u0131ld\u0131.\u00a0 Trakya\u2019ya Hidroelektrik Santrali (HES) yap\u0131lmas\u0131 i\u00e7in ilk [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":7783,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[63,67,165,6586,35370,1090,6585],"views":1100,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12704"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=12704"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12704\/revisions"}],"predecessor-version":[{"id":12707,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/12704\/revisions\/12707"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/7783"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=12704"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=12704"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=12704"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}